Post Job Free
Sign in

Mechanical Engineer Construction Manager

Location:
Mumbai, Maharashtra, India
Posted:
April 20, 2021

Contact this candidate

Resume:

RESUME

Permanent Address: A-***,Susheel Garden I

** *******, ******

Raigad, Maharashtra

India-410220

Passport No. : T4988487

Place of Issue : Manama,Bahrain

Date of Issue : 04.07.2019

Date of Expiry : 03.07.2029

Email adlti3@r.postjobfree.com

Mobile: +91-983*******

SKYPE ID : vipulbhaskargarud

VIPUL BHASKAR GARUD

Present Appointment Mechanical Engineer ( SMP)

Date of Birth 22nd June 1969

Nationality Indian

Education Bachelor of Mechanical Engineering (First Class) Pune,

India, 2009

Diploma in Mechanical Engineering Vir Jijamata Technical Institute, Maharashtra,India - 1989

Professional Qualifications ASNT Level II (MPT, LPT, UT, RT)

Languages English, Marathi, Hindi

GCC driving license valid up to 24.07.2020

Synopsis

Construction Manager with more than 31 years’ experience. Experienced in Construction of Refinery, Petrochemical, Chemical and Pharmaceutical plant projects. Key skills include Erection of piping, Storage tanks, Static and Rotary equipment and Structures.

Worked in Operation and Maintenance of Utility Equipment in various plants as well.

Construction experience covers all aspects of erection of piping, Storage Tanks, Static Rotary equipment and structures.

Sound administration capabilities able to cope with multiple tasks and flexible under daily pressure. Good at handling meetings and negotiations with clients on technical and non-technical issues.

Excellent organizational and prioritization abilities, analytical skills, interpersonal skills with all levels of people in the construction industry, diplomatic in dealings with people. Technical & Managerial experience on Major projects in Planning and Construction stage.

Key Skills

Erection of piping, Tanks, Static and Rotary Equipment. Operation and Maintenance of utility Equipment.

Selected Professional History

●GS Engineering & Construction, South Korea (November 2013 – May 2020 )

Mechanical Engineer ( SMP) Mechanical Engineer for the projects executed during the tenure at GS E & C, South Korea . Responsibilities include but not limited to subcontractor management of

- Installation of storage tanks as per API 650

- Installation of static equipment such as Re-boilers, Heat ex-changers, Distillation columns, Fired Heaters, cold box

- Installation of rotary equipment such as Pumps, Gas compressors, steam turbines, air compressors and utility equipment as per API 686

- Petrorabigh Complex Turnaround activities for heat ex-changers

Projects Executed:

1.SMP construction work in IRP II project for ADNOC and TAKREER, Mussafah, Abu Dhabi with GS Engineering and Construction South Korea.

2.SMP construction work in NEB project for ADCO, Rumaitha Shanayel, Abu Dhabi with GS Engineering and Construction South Korea.

3.SMP construction work in BLNGIT project for Bahrain Natural Gas Import Terminal Bahrain with GS Engineering and construction

4.Turnaround project at Petrorabigh, Saudi Arabia with GS Engineering and Construction South Korea.

●Pureworld Middle east, Abu Dhabi (January 2013 – September 2013)

Construction Manager Construction Manager for the projects executed during the tenure at Pureworld

Middle East . Responsibilities include but not limited to monitoring the progress

of project as per schedule for

- Installation of storage tanks as per API 650

-Installation of static equipment such as Reboilers, Heat exchangers, Distillation columns, Fired Heaters

-Installation of rotary equipment such as Pumps, Gas compressors, steam turbines, air compressors and utility equipment as per API 686

Projects Executed:

1.SMP construction work in IRP II project for ADNOC and TAKREER, Mussafah, Abu Dhabi Under GS Engineering and Construction South Korea.

●JAL International, Saudi Arabia (March 2010 – August 2012)

Construction Manager

Construction Manager for the projects executed during the tenure at JAL. Responsibilities include but not limited to Identification of Materials specifications and quantities, manpower and machinery requirements for execution of project as per schedule, Preparation of Purchase request for materials, Follow up of materials delivery at site, Inspection of incoming materials with the client and QA/QC with respect to

standards and specifications, Manpower, materials, machinery and equipment mobilization as per job plan, Monitoring and controlling execution of job at site as per project schedule, Follow up for Mechanical completion certificate and turnover notice,

Assisting the client in commissioning activities, preparation of change orders and

follow up for the approvals, Handover of project to clients. Worked with

Saudi Aramco Total Refinery and Petrochemicals for Utility Maintenance Support Services Contract.

Projects Executed:

1.Various short projects of piping and equipment erection executed in SABIC affiliates

Including GAS, PETROKEMYA, IBN-AL BAYTER, SAFCO, SADAF, SHARQ, AL-BAYRONI

IBN-ZAHR, YANPET.

2.Worked in Saudi Aramco Total Refinery And Petrochemicals( SATORP) for Package

2B, SRU, SWS and tail gas treatment unit under DAELIM, Saudi Arabia.

3. Handled Utility maintenance Support services project in Saudi Aramco Total

Refinery and Petrochemicals ( SATORP).

●Cipla Ltd. (September 2005 – March 2010)

Mechanical Worked as a Mechanical Engineer at Cipla Patalganga plant. Responsibilities

Engineer included but not limited to Checking and finalizing pipe routing for various utilities such as steam, chilled water, chilled brine, cooling water, nitrogen, compressed air, instrument air, Checking of equipment drawing with project consultants, Stage and final inspection of equipments as suppliers site with project consultants, Bid-analysis of quotations for rotary and static equipments and finalizing Purchase Orders, Erection, hydro testing and commissioning of MS, SS, MSTL, MSRL, MSGL, HDPE,PP/FRP piping and plant equipments, Checking of contractor’s bills and certifying quantities, Preparation of SOP for operation and preventive maintenance of equipments, Maintaining preventive maintenance records as per SOP, Planning, scheduling and monitoring manpower and materials for shutdowns of process plants, Handling Preventive and breakdown maintenance jobs, Preparation of Qualifications and Validations of Process and utility equipments, Potable water system, HVAC system, Air balancing of production floor as per AHU zoning layouts, Conversant with HVAC standards like ISO 14644,Facing National and international audits like USFDA, WHO, APVMA, MHRA, MCA, British Safety Council.

Projects Executed:

1.Installation of 2 TPH IBR boilers with Furnace oil as fuel for cost saving of Approximately Rs.5.5 million per annum.

2.Installation of 25 TR and 20 TR capacity Votas make Screw chilling plants for Chilled brine requirement at –30 Deg.Cent. Approximate cost saving Rs. 0.2 million per annum.

3.Installation of high capacity pumps for cooling towers to reduce electrical load. Approximate cost saving Rs. 0.7 million per annum.

4.Installation of 100 TR capacity Blue Star (Hanbell) make screw chiller for chilled water application to be used for HVAC.

5.Installation of 370 TR capacity York make Centrifugal chiller to reduce IKW/TR of chilling units.

6.Installation of 400 CFM capacity Chicago Pneumatics make reciprocating air compressors to reduce IKW/CFM.

●Reliance Industries Ltd. (September 2002 – September 2005)

Mechanical Worked as a Mechanical Engineer with world’s largest grass root level

Engineer Refinery. Handled piping, Stationary and rotating equipments installation and

Commissioning. Responsibilities included but not limited to Identification of Materials specifications and quantities, manpower and machinery requirements for execution of project as per schedule, Preparation of Issue request for materials, Follow up of materials delivery at site, Inspection of incoming materials with QA/QC as per standards and specifications, Manpower, materials, machinery and equipments mobilization as per job plan, Monitoring and controlling execution of job at site as per project schedule, Conducting Pre Start up Safety review and clearing punch list, Pre- commissioning of process units, Handover of plant for final commissioning to Operations department.

Projects Executed:

1.Amine treatment Unit Phase IV.

2.Sulphur Recovery Unit Phase IV.

3.Sea water desalination units 2 nos. 75 M3/hr capacity.

4.Captive power plants with 30 MW steam turbines and 125 TPH Water tube boilers.

5.Installation of liquid ring compressor for flue gas recovery system.

●Adani Wilmar Ltd.,Kutchh, (July 2001 – September 2002)

Mechanical Worked as a Mechanical maintenance Engineer with edible oil refinery.

Maintenance Preparation of preventive maintenance schedules for utility and process plants

Engineer equipments like Reactors, Distillation columns, Air and Gas compressors, Centrifugal and reciprocating pumps, Chilled water plants, Steam Boilers, Diesel generator sets, QVF-Corning glass equipments, in consultation with operations department, attending breakdown calls, Planning for manpower and materials for shutdowns, Inspection of materials with QA/QC as per standards and specifications, Monitoring and controlling execution of job at site, Maintenance spares inventory for Equipments.

●Indian Organic Chemicals Ltd. (January 1991 –June 2001)

Officer Worked as a Officer maintenance with Chemical industry manufacturing Acetic .

Maintenance acid, Acetic Anhydride, Ethyl Acetate, DEP, DOP, Glyxol, Pharmaceutical intermediate like Dane salt etc. Handled Operation and maintenance of utility equipments, Preventive maintenance of process equipments and projects. Preparation of preventive maintenance schedules for utility and process plants

equipments like Reactors, Distillation columns, Air and Gas compressors, Centrifugal and reciprocating pumps, Chilled water plants, Steam Boilers, Diesel generator sets, QVF-Corning glass equipments, in consultation with operations department, attending breakdown calls, Planning for manpower and materials for shutdowns, Inspection of materials with QA/QC as per standards and specifications, Monitoring and controlling execution of job at site, Maintaining spares inventory for Equipments.

Projects Executed :

1.Manufacturing 10 TPD CG-1129 product.

Consultant : Chemtex India Ltd., Process Licenser : M/S. Ciba speciality additives division, Switzerland.

2.Manufacturing 20TPD phenyl Glyceine and Dane Salt, pharmaceutical Intermediate.

Consultant : M/S. R. J. associates. Process Licenser : M/S. Kaneka Corporation, Singapore.

3.Expansion of Acetic Anhydride plant from 30 TPD to 45 TPD. Manufacturing of Benzaldehyde, Benzyl Acetate, Benzyl Chloride.

4.Expansion of Ethyl Acetate plant from 10 TPD to 30 TPD.

5.Expansion of Acetaldehyde plant from 30 TPD to 45 TPD.

6.Erection and commissioning of pilot plants to manufacture speciality chemicals.

7.Expansion of Glyoxal and DEP plant.

●Kishore pumps Pvt. Ltd. (June 1989 – December 1990)

Project Worked as a project engineer in the industry manufacturing centrifugal, Dry

Engineer submersible, special alloy, rubber lined pumps. Responsibilities included Discussion with clients for the technical requirement and suggesting suitable model, monitoring the process of manufacturing and assembly, testing of pumps on test field in presence of third party inspection agency or client, Installation and commissioning of supplied pumps at client site.



Contact this candidate