CURRICULUM VITAE
JULIUS C. GONZALES
Zone *, Airborne Compound,
Pedro Colina Hill, Cotabato City
email add : mailto:***********@*****.***
Cellphone no. : 093*-****-***
Objective
oTo join an established office requiring an experienced Civil Engineer familiar with Project Management, Quality Assurance and Quality Control, USAid, Ausaid DPWH, NIA, DA and ABD projects. Computer literate and experienced in horizontal, vertical and humanitarian response.
Summary of Qualification
oResult oriented Civil Engineer.
oExperienced in Quality Assurance Engineer.
oExperienced in Project Management & Implementation.
oExperienced in Costing, Scheduling of manpower and other resources needed in the project.
oProven ability to work independently or as a team.
oAble to do Equity Generation & transact to the Local officials.
Related Knowledge in :
SketchUp
Microsoft Excel
Microsoft Word
MS Project
RECORD OF SEMINAR / TRAINING
Course
Period
Conducted
Quality Control and Assurance Training
Mar. 2019
DPWH-BQS Manila
Quality Control and Assurance
Training
Sept. 2018
UNDP-DILG Davao City
Training on Quality Assurance for Project Assessment / Inspection
Jan. 30-Feb. 1, 2017
DPWH-BQS Manila
Construction and Occupational Health Safety Training
Jan. 25-30, 2016
DOLE and Occupational Safety and Health Center
Orientation & Skills Training of Regional WatSan Hubs
Nov. 26-31, 2013
DILG-PDMU-OPDS
Rollout on Human Based-Rights Local Water Sanitation
Oct. 8-10, 2013
DILG XII
Basic EPANET 2 & Skills Training on DED Preparation
Jul. 29-Aug. 1, 2013
DILG-PDMU-OPDS
School Building Maintenance Briefing Seminar
March 20-21, 2007
Educational Development Project Implementing Task Force (EDPITAF)
Training on Construction Management
June 24-25, 2003
MOHRI & P.A. Associates, Inc. Camiguin Island
Structural Concept of STAAD-III and Earthquake Resistance Structural Design
August 27-30, 1999
ALA Computers, Cotabato City
Management Capability
April 23-24, 1999
NCPDP / JICA, Cotabato City
EDUCATIONAL BACKGROUND
School
Year Attended
Course
College
Notre Dame University
1987-1992
Bachelor of Science in Civil Engineering
Secondary
North Cotabato College of Arts and Trade
1983-1987
Automotive Mechanics
Primary
Cotabato City Central Pilot Elementary School
1977-1983
Graduated
PROFESSIONAL EXPERIENCE
September 16, 2018 – PRESENT
Company
:
United Nations Development Programme (UNDP)
Position Held
:
Regional Engineer Region 6
Client
:
Department of Interior and Local Government (DILG)
Name of Project
:
CMGP-Rs2SGDs
Duties Involved
:
Prepare and submission of the Quality Assurance Assessment Report on DILG-PLGU on-going and completed project under CMGP.
Assist the DILG Regional office in reviewing Detailed Engineering Design in all CMGP Projects.
Review and Evaluate the status of CMGP Roads is in accordance to the Sustainable Development Goals.
Conduct coordination meeting, exit conference and issuance of letter to the PLGU.
Capacitate the PEO and DILG CMGP Engineer in Quality Assurance aspect of the project both Documentation and Implementation.
Assist the DILG Central Office in developing QA Tools based on the common standard findings and recommendations set by the DPWH.
Review the Program of Works, Quantity Calculation and DUPA submitted by the implementing office.
February 2017 – September 15, 2018
Company
:
Urban Engineers
Position Held
:
Quality Assurance-Senior Engineer
Client
:
DPWH Central Office
Name of Project
:
Quality Assurance Consultant in the Conduct of the Civil Works Project Assessment in Visayas and Mindanao Areas II
Duties Involved
:
Prepared of Quality Assurance (QA) Policies, Procedures and Quality Management Plan based on the approved recommendations.
Conduct of Project Quality Assessments of various DPWH on-going and completed projects.
Review and evaluate the Actual Physical Status of assessed DPWH DEO projects for Visayas and Mindanao.
Submit the Quality Assurance Report to the DPWH CO through Head Engineer.
February 2016 – January 2017
Company
:
Better Works Construction
Position Held
:
Project Manager
Client
:
DPWH, NIA, Department of Agriculture and Land Bank of the Philippines
Name of Project
:
Various
Duties Involved
:
Ensure the Quality Control aspect of the various projects under Department of Public Works and Highways, Department of Agriculture National Irrigation Administration and Land Bank of the Philippines.
Maintaining the working relationship with the Implementing Office.
Prepare and Submit contractor’s monthly report, progress billing and testing.
Supervise the As-staked Survey, Financial Monitoring and Variation Order.
January 16, 2016 – July 31, 2016
Company
:
Department of Agriculture (DA)
Position Held
:
Rural Infrastructure Engineer
Client
:
Provincial Government of Sarangani and South Cotabato
Name of Project
:
Philippines Rural Development Program (PRDP)
Duties Involved
:
Conduct Quality Assurance Inspection on various infrastructure projects under PRDP.
Create working relationship with PLGU counterpart(s) to enable exchange of knowledge and expertise relevant to the PRDP Project.
Review the Detailed Engineering Design, Variation Order and Request for Billing submitted by the LGUs.
Hold coordination meeting meetings and establish document management and control.
Oversee Works Supervision Services in conjunction with counterpart(s), such as; Stake-out surveys, Materials quality assurance, Taking action on construction defects/deficiencies, Preparing and submitting regular progress reports.
February 2015 – December 16, 2015
Company
:
Louis Berger Group, Inc. Philippines
Position Held
:
Resident Engineer
Client
:
Provincial Government of Guimaras
Name of Project
:
Philippines Provincial Road Management Facility (PRMF)
Nature of Works
:
Rehabilitations of Provincial Roads and Components
“Rehab. of 10 kms. Provincial Road consist of Earthworks, Subbase Materials, provision of RCBC, RCPC, Guardrail, Warning Signs and Slope Protection (grouted Riprap)
Duties Involved
:
Identify and establish working relationship with PLGU counterpart(s) to facilitate exchange of knowledge and expertise relevant to the rehabilitation and maintenance of the Province’s road network.
Contribute to capacity development teams both in the current Province or in other Provinces as requested, to facilitate the composition of teams with the relevant mix of expertise and experience.
Deputize for colleagues as required in order to maintain continuity of service and expertise to the Province.
In conjunction with PLGU counterpart(s) the Contract Management Mentor will oversee implementation and revision of the Contractor’s Methodology for Construction Works including Contractor’s Equipment Utilization Schedule, Manpower Utilization Schedule, Materials Delivery Plan, and Detailed Construction Schedule and S-Curve
Review shop drawing and design revisions, Recommend work acceptance and issue certification on completed works, Review/prepare and recommend approval of Variation Orders, Keep records of insurance and warranties, Hold consultation meetings, Institute document management and control.
Oversee Works Supervision Services in conjunction with counterpart(s), such as:
Stake-out surveys, Confirmation of permanent monuments and topographic data, Ensuring no disturbance to other structures apart from those specified in the contract, Materials quality assurance, Taking action on construction defects/deficiencies, Inspecting quarries and materials plants, Revising work/disburse schedule as necessary, Preparing and submitting regular progress reports, Maintaining records of work inspections and site instructions, Monitoring daily project activities, Reviewing/validating contractor’s drawings.
January 2014 – January 2015
Company
:
IOM (International Organization for Migration)
Position Held
:
Project/Quantity Engineer
Client
:
Municipalities of Pigcawayan, Libungan, Aleosan, Pikit, South Upi, and Bagumbayan
Nature of Works
:
Construction / Provision of Emergency Shelter, WASH Facilities, and Health Center
Name of Project
:
Humanitarian Response in Armed Conflict Area
Duties Involved
:
Prepare budgetary estimate for Women Friendly Space, Health Stations, Shelter Repair, Evacuation Facilities, WASH Facilities.
Conduct inspection and supervision in Shelter repair and reconstruction, Refurbishment of Health Stations and Women Friendly Space.
Prepares quantity take off, costing, progress report, attended cluster meeting of NGO’s and monitor the progress of the project.
Provision of technical assistance to the implementing partners, to ensure the cash for work program is properly followed.
Conduct coordination meeting w/ partners, lgu and stakeholder, pre-bid conference, bid opening, post qualification & awarding of contracts
July 29, 2013-Dec. 31, 2013
Company
:
DILG-12 (Department of Interior and Local Government)
Position Held
:
Project Engineer / Cost Engineer
Name of Project
:
SALINTUBIG, PAMANA and BUB
Client
:
Province of Cotabato (Pigcawayan, Libungan, Aleosan, Pikit, Matalam, Mlang, Tulunan, Midsayap and Kabacan)
Nature of Works
:
Construction of Water System and Concreting of Roads
Duties Involved
:
Review Detailed Engineering Designed, quantity, unit costing and Feasibility Study of Water System and Roads
Assist the LGU conducting the procurement process (bidding/shopping)
Conduct source validation, project monitoring & evaluation
Follow-up the lgu in liquidation process of tranche releases
January 16, 2013 – July 31, 2013
Company
:
IOM (International Organization for Migration)
Position Held
:
Project Engineer/Cost Engineer
Client
:
Provincial Government of Compostela Valley
Nature of Works
:
Construction / Provision of Emergency Shelter and WASH Facilities
Name of Project
:
Response to Typhoon Pablo at Compostela Valley
Duties Involved
:
Prepare budgetary estimate and unit costing for shelter repair, Evacuation Facilities, WASH Facilities.
Conduct inspection and supervision to insure the Disaster Risk Reduction design applied properly in shelter repair & reconstruction.
Prepares progress report, attended cluster meeting of NGO’s and monitor the progress of the project.
Provision of technical assistance to the implementing partners, to ensure the cash for work program is properly followed.
Conduct coordination meeting w/ partners, lgu and stakeholder, pre-bid conference, bid opening, post qualification & awarding of contracts
August 16, 2012 – January 15, 2013
Company
:
Apex Mining Co., Inc.
Position Held
:
Planning & Cost Control Engineer
Name of Project
:
Apex Expansion Project
Client
:
Apex Mining Compostela Valley
Nature of Works
:
Construction of Carbon In Leach Tanks, Ball Mill, Mounting of Crushers
Duties Involved
:
Prepare budgetary estimate for bidding purposes and construction schedule.
Conduct inspection and supervision of expansion projects.
Prepares and submits progress reports.
Monitor the quality assurance / quality control requirements.
January 2009 – August 15, 2012
Company
:
Louis Berger Group, Inc. Philippines
Position Held
:
Project Engineer/Cost Engineer
Name of Project
:
Growth with Equity in Mindanao Program (GEM)
Client
:
Municipalities of Alamada, Pigcawayan, Parang, Isulan, Bagumbayan, Esperanza, North Upi and Cotabato City.
Project Description
:
Construction of Box Culvert, Farm to Market Road, Solar Dryer, Foot Bridge, Trading Center and Slab Bridge.
Duties Involved
:
Conducts construction inspection and supervision of construction projects as assigned to ensure that construction is completed in accordance with plans & specification.
Monitors, supervises and inspects subcontractor project construction activities.
Prepares quantity take-off and unit pricing and submits on construction progress reports, Provides support for implementation of quality assurance / quality control requirements.
Follow up on documents and counterpart obligations required from local government units.
Prepares and maintains project records and documents in accordance with GEM QA/QC Manual, and assist with USAID visits, project meetings, and project turnovers.
Perform other related duties as directed and may be required under the GEM Program including possible re-assignment to other GEM Program regions.
June 2007 – December 2008
Company
:
TCGI Engineers
Position Held
:
Quantity / Cost Engineer
Name of Project
:
Secondary Education Development and Improvement Project (SEDIP)
Client
:
DepEd Cotabato Province of Cotabato
Project Description
:
Construction of 188–Classrooms Bldg; 51-Science Laboratory Bldg; 23–Home Economics Bldg; 5–Industrial Arts Bldg; 14-Library Bldg; 102-Toilets; 3-Water Supply; 18-Repair; 71-Completion; 1-New School
Project Cost
:
Php 282,586,325.67
Duties Involved
:
Prepare quantity take-off, unit costing / pricing.
Monitor &, evaluate the project implementation
Assist the LGU in conduct bidding, evaluation & awarding of projects
Assist the LGU in preparation of plans and drawings (AutoCad Plan)
Assist CWPS in project report and assist making communication to the LGU
September 2006 – March 2007
Company
:
Educational Development Project Implementing Task Force (EDPITAF)
Position Held
:
Project Engineer
Name of Project
:
Government of Spain-Government of the Philippines Education Project
Nature of Works
:
Construction & Repair of School Building; Furnishing of School Furniture
Project Cost
:
968,321 Euros or Php 65,220,000.00
Client
:
DepEd Cotabato Province of Cotabato
Nature of Works
:
Construction and Repair of Various School Buildings in Cotabato Province
Duties Involved
:
Monitor, evaluate & supervise the Implementation of GOS projects
Conduct bidding, evaluation, post qualification, awarding and contracting of projects
Preparation of plans & drawings (AutoCad Plan)
Preparation of cost estimate, bi-monthly reports & project terminal report
Review & Recommend for the approval of contract award
Assist the project manager in implementation
July 2002 – June 2006
Company
:
MOHRI & P.A. Associate, Inc.
Position Held
:
Junior Division Engineer Coordinator (Consultant)
Name of Project
:
Third Elementary Education Project (TEEP)
Project Cost
:
Php 373,078,106.01 Principal Led Scheme
Php 121,852,725.85 LGU Led Scheme
Client
:
DepEd Cotabato Province of Cotabato
Nature of Works
:
Construction of 360 Classroom & Repair of 1,038 Classroom for Principal led scheme
Construction of 184 Classroom & Repair of 152 Classroom for LGU led scheme
Duties Involved
:
Monitor, evaluate & supervise the Implementation of TEEP projects.
Conduct bidding, evaluation & awarding of projects.
Conduct orientation seminars.
Preparation of project terminal report.
Assist LGU to monitor and implement the project properly.
Coordinate with other national & local government unit in the implementation of the project.
August 1999 – June 2002
Company
:
LLOYD Builders
Position Held
:
Project Engineer/Surveyor/Materials Engineer/Quantity Engineer
Name of Project
:
Mindanao Rural Development Project (MRDP) & Philippine Port Authority (PPA)
Project Cost
:
Php 17,873,892.15 and Php 3,114,002.89
Client
:
Municipalities of Antipas, Arakan, Lambayong and PPA Cotabato City
Nature of Works
:
Repair/Rehabilitation of Farm to Market Road
“Clearing & grubbing, Removal of existing RCP, Roadway Excavation, Structure Excavation, Embankment, Su- grade preparation, Aggregate Sub-base, Base Course, Grouted Riprap, Overflow Bridge, Manual Ditching”
Installation of RC fender, repair of causeway & improvement of staff house.
Duties Involved
:
Preparing the construction cost estimates and quantity take-off.
Preparing monthly certificate payment.
Direct supervision in the development of technical drawings.
Prepare and supervise of as-built quantity and plans.
Preparation of as-stake & As-built quantity & drawings.
January 1998 – August 1999
Company
:
Algon Engineering Construction Corporation
Position Held
:
Office Engineer / Quantity Engineer
Name of Project
:
Kabulnan Irrigation and Area Development Project (KIADP)
Client
:
NIA Maguindanao
Project Cost
:
Php 129,861,524.29
Nature of Works
:
Construction of 15 kms concrete canal lining, 5 kms. Lateral canal, 128 units of drainage and structures, embankment, Surfacing works, Slope protection and 1 unit bridge
Duties Involved
:
Prepared the construction cost estimates.
Preparing monthly certificate payment
Direct supervision in the development of technical drawings.
Prepare and supervise of as-built quantity and plans.
Preparation of as-stake quantity & drawings.
Preparing reports concerning the progress and status of the project.
August 1992 – January 1998
Company
:
Algon Engineering Construction Corporation
Position Held
:
Office Engineer / Quantity Engineer
Name of Project
:
4th ADB Assisted Road Improvement Project
Project Cost
:
Php 206,797,854.21
Client
:
DPWH Cotabato Province
Nature of Works
:
Construction of Matalam-Makilala-Bagontapay-Tacurong-Marbel Road
“Construction of 65 kms. Of Earthworks, Subbase Materials, Base Course Materials, Asphalt Concrete Pavement (binder), 50 kms. Of Asphalt Overlay (wearing coarse), 3 units of Box Culvert, Slope protection (grouted Riprap), Improvement of Bridges and Installation of Cross Drainage Pipe Culvert”
Duties Involved
:
Assist the Materials Engineer with the report and testing conducted.
Assist conducting field surveys.
Data gathering and review of construction plans.
Prepared the construction cost estimates.
Preparing monthly certificate payment
Direct supervision in the development of technical drawings.
Monitor all quantity of materials and resources.
Prepare and supervise of as-built quantity and plans.
Preparation of as-stake quantity & drawings.
Preparing reports concerning the progress and status of the project.
Submit daily report to Project Manager.
JULIUS C. GONZALES
CE 66852
***********@*****.***
******.********@****.***