Post Job Free

Resume

Sign in

Mechanical Engineer Construction

Location:
PTA, Kerala, 689108, India
Salary:
900000/- LPA
Posted:
April 19, 2021

Contact this candidate

Resume:

TIJO KOSHY

Address: Palackaparambil (H), Karackal P.O, Thiruvalla, Dist-Pathanamthitta, Kerala-689108

Ph.: +91-738*******; Email Id: adlsq9@r.postjobfree.com

Offering 9.4 years of experience in Fabrication, Erection & Commissioning

Career objects:

To work in a global environment by utilizing my ability, knowledge and logical thinking to best and to improve and upgrade my skills according to organizational needs.

Profile & Strengths:

Dynamic and vibrant professional with More than 9 years of experience and well-honed expertise in the areas of fabrication, erection & commissioning associated in power sector.

Consummate professionals with excellent planning, execution, monitoring and supervision of construction activities attention to details as well as the ability to build and lead effective teams.

Innate strengths in identifying and developing site engineering and project management and retaining their business association with augmented customer services.

Demonstrated exceptional abilities in enhancing site engineering in creating and developing a strong network in the field of electrical resulting in consistent growth in business opportunities.

Demonstrated skills in reducing costs and enhancing quality.

Well developed communication skills with reputation of unwavering accuracy, credibility and integrity. A strong team player with exceptional planning, execution, negotiation and interpersonal skills.

Core Competencies:

Fabrication, Erection, Commissioning, Alkali flushing, Hydro Test, COD, RRT, PG Test, Project execution, Project Management, Progress monitoring

Professional Experience:

Company Profile: SEPCOIII SHADONG ELECTRICAL POWER CONSTRUCTION LTD. (2x800MW Ultra Supercritical Thermal Power

Project).

Customer: ADANI POWER LIMITED (GODDA, JHARKHAND).

Period: MARCH, 2021- Till now

Position: Senior Engineer

RESPONSIBILITES:

Fit-Up & Alignment inspections of LP &HP Piping, Auxiliary equipments and Check all the expansion point for smooth commissioning.

Review the FQP and checklists.

Checking of piping hanger support and guiding devices.

Checking of Protocols & Inspection reports.

Monitoring and Handling Inspection activities

The work should follow the Safety Working Procedure (SWP)

Signing of Protocols, Records, Punching check list prior to Hydro test and witnessing the hydro test and hand over to commissioning dept.

Consummate professionals with excellent planning, execution, monitoring and supervision of construction activities attention to details as well as the ability to build and lead effective teams.

Actively participate in preparation & follow up of DCN for the change in drawing at site.

Actively participate in commissioning of Turbine and Auxiliary equipments.

Involved in the activities like Hydro test of LP & HP Piping, Alkali flushing, COD (Commercial Operation and Declaration), RRT (Reliability Run Test), PG Test (Performance guarantee test).

Worked in commissioning (Maintenance support) of the Turbine.

Responsible includes commissioning and maintenance of CPU unit (Condensate polishing unit), SWAS system (Steam water analysis system), and Chemical dosing system.

Implementing preventive/breakdown maintenance of Turbine & its auxiliaries.

Company Profile: GTA POWERMECH FZE (OIL REFINERY & PETRO CHEMICAL PLANT).

Customer: DANGOTE INDUSTRIES LIMITED (NIGERIA).

Period: NOV, 2019- JAN, 2021

Position: Senior Engineer

RESPONSIBILITES:

Fit-Up & Alignment inspections of LP &HP Piping, Auxiliary equipments and Check all the expansion point for smooth commissioning.

Review the ISO INDEX, FQP, and checklists.

Checking of piping hanger support and guiding devices.

Checking of Protocols & Inspection reports.

Monitoring and Handling Inspection activities

The work should follow the Safety Working Procedure (SWP)

Preparing of LOOP FILE for hydro test clearance.

Signing of Protocols, Records, Punching check list prior to Hydro test and witnessing the hydro test and hand over to commissioning dept.

Consummate professionals with excellent planning, execution, monitoring and supervision of construction activities attention to details as well as the ability to build and lead effective teams.

Ensure that the equipment is used for testing (or) construction activities is calibrated or not and it having a valid calibration certificate.

Identification of non-conformities and coordination in resolving NCRs and Review of Calibration Certificates and involve in calibration processes at site

To Detect and Eliminate cause of defect which occur during manufacturing and commissioning.

Study of relevant Specification and Codes of Indian Turbine Regulations ASME, API, IS etc.,

Preparation of monthly, fortnightly, reports for defect list of all construction area.

Participation in Quality audit & Meetings with Client as well as subcontractors. Providing technical clarifications & attending the project reviews as per agreed plan and schedule.

Day to day work planning and work distribution, Preparation of daily reports and documents.

Company Profile: Shandong Electric Power Construction Corporation (SEPCO-1) (Steel plant).

Customer: Chromeni Steels Pvt. ltd (Mundra).

Period: Feb, 2019- June, 2019

Position: Mechanical Engineer

RESPONSIBILITES:

Fit-Up & Alignment inspections of LP &HP Piping, Auxiliary equipments & Condenser and Check all the expansion point for smooth commissioning.

Review the FQP, checklists, and Methodology.

Checking of piping hanger support and guiding devices.

Checking of Protocols & Inspection reports.

Monitoring and Handling Inspection activities

The work should follow the Safety Working Procedure (SWP)

Signing of Protocols, Records, Punching check list prior to Hydro test and witnessing the hydro test and hand over to commissioning dept.

Consummate professionals with excellent planning, execution, monitoring and supervision of construction activities attention to details as well as the ability to build and lead effective teams.

Ensure that the equipment is used for testing (or) construction activities is calibrated or not and it having a valid calibration certificate.

Identification of non-conformities and coordination in resolving NCRs and Review of Calibration Certificates and involve in calibration processes at site

To Detect and Eliminate cause of defect which occur during manufacturing and commissioning.

Study of relevant Specification and Codes of Indian Turbine Regulations ASME, API, IS etc.,

Company Profile: OLDAC Private Limited (ONE LINER DESIGNERS AND ARCHITECTS CONSORTIUM)

Customer: Building construction (Kerala).

Period: June, 2018- Jan 2019.

Position: MEP Executive

RESPONSIBILITES:

Development of best practice and maintenance management measure including the review and update of standard on a routine basic.

Development of policies/reviews and standards for capital projects, facility database, and master plan information

Review of plans and specification according to plan.

Prepare plans, details, specified and cost estimated of plumbing, Heating, Ventilating, Air conditioning and general piping system.

Analyzing of Mechanical, Electrical, and/or plumbing engineering problems and formulate solutions.

Identification of problems in design, plan, manage and deliver multiple projects.

Responsible for plan, organize review and evaluate the work of consultant, contractor and others.

Preparing and delivering of effective oral presentation whenever required.

Preparation of monthly, fortnightly, reports for defect list of all construction area.

Cost control and improvement towards completion of specific job.

The work should follow the Safety Working Procedure (SWP)

Company Profile: Shandong Electric Power Construction Corporation (SEPCO-1) (6X600MW).

Customer: KMPCL. Nariyara (Chhattisgarh).

Period: July, 2012- May 2018.

Position: Mechanical Engineer

RESPONSIBILITES:

Fit-Up & Alignment inspections of LP & HP Piping, Auxiliary equipments & Condenser and Check all the expansion point for smooth commissioning.

Review the FQP, checklists, and Methodology.

Checking of piping hanger support and guiding devices.

Checking of Protocols & Inspection reports.

Monitoring and Handling Inspection activities

The work should follow the Safety Working Procedure (SWP)

Signing of Protocols, Records, Punching check list prior to Hydro test and witnessing the hydro test and hand over to commissioning dept.

Consummate professionals with excellent planning, execution, monitoring and supervision of construction activities attention to details as well as the ability to build and lead effective teams.

Ensure that the equipment is used for testing (or) construction activities is calibrated or not and it having a valid calibration certificate.

Identification of non-conformities and coordination in resolving NCRs and Review of Calibration Certificates and involve in calibration processes at site

To Detect and Eliminate cause of defect which occur during manufacturing and commissioning.

Study of relevant Specification and Codes of Indian Turbine Regulations ASME, API, IS etc.,

Review the contractor’s documents related to Quality

Checking contractor’s performance in terms of quality related issues.

Follow up of immediate corrective action for defect list,NCR and other points related

Stage inspection of erection and all activities i.e. Turbine and Pipe line network etc. and Control of Test Certificates, Slope maintaining during drain line, Valve direction & degree as per drawing etc.

Ensuring identification of products and traceability as required and indicating inspection and test status of jobs inspected and Final inspection of completed site construction activities and involve in preparation of as build drawings and protocol’s.

Preparation of monthly, fortnightly, reports for defect list of all construction area.

Participation in Quality audit & Meetings with Client as well as subcontractors.

Resolving and raising NCR.

Increase moral of colleagues and contractors.

Cost control and improvement towards completion of specific job.

Actively participate in preparation & follow up of DCN for the change in drawing at site.

Actively participate in commissioning of Turbine and Auxiliary equipments.

Involved in the activities like Hydro test of LP & HP Piping, Alkali flushing, COD (Commercial Operation and Declaration), RRT (Reliability Run Test), PG Test (Performance guarantee test).

Worked in commissioning (Maintenance support) of the Turbine.

Responsible includes commissioning and maintenance of CPU unit (Condensate polishing unit), SWAS system (Steam water analysis system), and Chemical dosing system.

Implementing preventive/breakdown maintenance of Turbine & its auxiliaries.

Company Profile: Brothers Engineering and Erectors Limited (Under SEPCO1)

Customer: KMPCL. Nariyara (Chhattisgarh).

Period: October 2011- July2012.

Position: Mechanical Engineer

RESPONSIBILITES:

Construction Co-ordination with sub-contractors for the proper installation.

To verify that all applicable testing equipments are calibrated and has valid certification.

Pre planning and scheduling of work, Requirements of materials, Placing order maintain & Verification.

To prepare measurements of daily executed works, Manpower, Machineries, and make its documents which will be used for billing purpose.

Involving in checking of fit up & Alignment of pipes with relevant drawing and schemes.

Material checking to evaluate the properties of materials, Part, Product for the further work, Visual inspection for welding joints, and ultrasonic test (UT) OR Radiographic test (RT) will be needed as per system requirements.

Fabrication and erection of CST (Condensate storage tank) and conduct sand blasting and vacuum test for further approval.

Co-ordination and supervising in erection of Hanger & supports for all LP, MP & HP Piping.

Providing technical clarifications & attending the project reviews as per agreed plan and schedule.

Day to day work planning and work distribution, Preparation of daily reports and documents.

Company Profile: Power rich Engineering Erectors India Private Limited. (Under Larsen &Toubro Ltd.)

Customer: GMR Power Corporation Limited (1x388.5MW & 2x384MW), Vemagiri (Andhra Pradesh).

Period: January 2011- September 2011.

Position: Supervisor (Mechanical)

RESPONSIBILITES:

Construction Co-ordination with sub-contractors for the proper installation.

Erection and Installation of LP & HP Pipes and auxiliary equipments (LP Heater, HP Heater, Deaerator) etc.

Planning for monthly weekly and daily work report.

Checking the alignment for the steel structure work.

Actively participated in the alkali cleaning of HP, LP & Condenser.

Preparation of PROTOCOLS & Inspection reports.

Checking of ducting fit up work, lime kerosene test and welding works.

Fit-Up & Alignment inspections of headers, piping and equipment’s in Turbine.

Foundation handover process for equipment erection.

Actively participate in Air leakage test and hydro test of turbine piping.

Educational Credentials:

B.tech in mechanical engineering from JRN RAJASTHAN VIDYAPEETH University.

Diploma in Mechanical cad from CADD Centre Thiruvalla.

Intermediate (12th Science) from Board of Kerala HSC, PMVHSS Peringara.

High School 10th from Board of Kerala HSC, PMVHSS Peringara.

Personal Snapshot:

Name : Tijo Koshy.

Date of birth : 13th August, 1991.

Father’s name : P C KOSHY.

Total experience : 9.4 years.

Current Salary : 7.2 LPA.

Notice Period : One month.

Languages Known : Malayalam, Hindi, English, and Tamil.

Passport no : T 8890933

Place of issue : Trivandrum

Visa Status : -NIL-

Extra Activities:

Playing and watching Cricket.

Playing badminton

Playing Volley ball

Listening music

Writing of my own blogs

Net Surfing.

Reading News Paper.

Declaration:

I do hereby declare that the information given here by me is true and correct to the best of my knowledge and belief and I hold myself responsible for any irregularities if found.

Date :

Place :

Tijo Koshy



Contact this candidate