Post Job Free

Resume

Sign in

Industrial Training Electrical

Location:
Dera Bassi, Punjab, India
Posted:
April 15, 2021

Contact this candidate

Resume:

RAKESH GANDHI

adlphz@r.postjobfree.com Punjab, India +91-797*******

SUMMARY :

To constantly make efforts towards perfection in my field through best utilization of my knowledge and strength with full commitment to become a valuable asset for the organization.

WORK EXPERIENCE :

· NAHAR INDUSTRIAL ENTERPRISES LTD. ( SPINNING UNIT - IV ) Executive - Purchase Nov' 2010 — Till Date

1. More than 5 years of experience in procuring materials from Domestic and International market.

2. Experienced with inviting the quotations and controlling the prices. 3. Expertise in developing local vendors, reducing the cost of procurement of material. 4. Successfully implemented vendor development program. 5. Experienced with implementing systems of inventory management avoiding over- stocking or wastage, better logistics and achieve targets. 6. An effective communicator with excellent relationship building and interpersonal skills.

7. Strong analytical, problem solving, organizational abilities. 8. Working knowledge of SAP.

9. Daily/weekly review of purchase requests generated by SAP. 10. Coordination with user departments as per consumption pattern. 11. To ensure that all purchase requests are converted to Purchase Orders on daily basis. 12. Negotiation with vendors /suppliers/contractors on the basis of cost and value to finalize the most beneficial deal for the company, adhering to the quality and delivery norms as per the plan.

13. In case of revision of price, check with new price from all angles, prepare self-costing discussing with various vendors, Prepare Price intimation for approval of seniors. 14. In case of Indented items make techno commercial comparison of Price and seek approval.

15. To keep an eye on material planned and material ordered and take the requisite action in case of delayed supplies, rejections such as arranging the material from other approved sources. In case of major unavoidable deviations, seek approval from Plant Head.

Executive - Engineering Nov' 2010 — Till Date

1. Having 10 Years of work experience in Electrical Project & Maintenance. 2. Creating and updating of Master data for SAP PM for Technical Objects / Maintenance Plan.

3. Handled a team of 20 people of Engineering Department. 4. Engineering Department Expense Control and Cost down planning. 5. Handling of electrical load as per requirement, Analysis of electrical consumption & Prepare power consumption report.

6. Responsible for Insurance Claim.

7. Planning the shutdown maintenance.

8. Good understanding of Electrical Drawings, Planning of Projects, Erection

& Maintenance.

9. Both practical as well as theoretical knowledge of Different Electrical Instruments. 10. To carry out effective and timely Preventive/ Predictive / Breakdown Maintenance by preparation of maintenance schedule and supervising maintenance activities as per the checklists.

11. Knowledge and troubleshooting experience of LT Motors, MCC Panels, PCC Panels, AC Drives, HT/ LT Cable Work, Transformer & Different types of Elect. Instruments.

12. Testing and maintenance of 3-phase induction motors, Transformers, VFD Operation.

13. Operation, Testing, Maintenance and working Knowledge of PLC, HMI & VFD. 14. Ensuring availability of required spares in the section by preparing and maintaining critical spares list of the section and minimum quantities for all critical spares and ordering spares through purchase department and related follow-ups / inspection etc.

15. Manpower planning and deployment for technicians in shifts. 16. To co-ordinate with Electrical Contractor for Electrification, Execution, Erection & Commissioning.

17. Inspection of all the Safety Interlocks as per schedule and providing new engineering Interlocks for safe conditions.

DURING PROJECT : Handled a Machine Installation and Commissioning project of 62400 Spindles of LMW, ELECTROJET, MURATA make TEXTILE machine setup With 11/0.433KV Substation.

Prepare Design & SLD of electrical layout for whole plant. Prepare Checklists and follows it.

18. LONGOWAL POLY TECHNIC COLLEGE :

LECTURER JULY'2009 to JUNE'2010

Worked as Lecturer in Electronic and Communication department. IT Skill :

1. Microsoft Office, Internet

ACHIEVEMENTS :

1. Done Energy Saving project by Installing AC Drives on suction fan of pneumafil waste at Ring Frame Machine, saved approximate Rs. 77,755.00/-annually. 2. Air and Energy Consumption saved by monitoring and arresting Compressed Air Leakages, saved Rs. approximate Rs. 2,60,000.00 annually. 3. Done Energy Savings by converting Conventional Tube Rods into 20 Watt LEDs, saved approximate Rs. Rs. 75,000.00/- annually. EDUCATION :

MBA/PGDBM in Operations Symbiosis Centre for Distance Learning, Pune 2015 Bachelor of Engineering in

Electronics and

Communication Punjab Technical University, Jalandhar 2009 Diploma in Electronics and Punjab State Board of Technical Education & 2006 Communication Industrial Training, Chandigarh

10

th

Central Board of secondary Education 2003

TRAINING :

1. 2 Weeks training from “ALLENGERS”

2. 6 Weeks industrial training from “ B.S. N.L” in ”FETEX” Department 3. 6 Months industrial training from IDEA in “BSS” Department of Linking one BTS site with another site.

PERSONAL DETAILS :

Date of Birth : 25

th

FEB, 1987

Present Address : # 40/1, Adarsh Nagar, Dera Bassi (PB) Nationality : Indian

Marital Status : Married

Languages Known : English,Hindi & Punjabi

Declaration :

I hereby declare that the information furnished above is true to the best of my knowledge and belief.

DATE : RAKESH GANDHI



Contact this candidate