Post Job Free

Resume

Sign in

Engineer Mechanical

Location:
Quezon City, Philippines
Posted:
April 14, 2021

Contact this candidate

Resume:

NICANDRO, FERDINAND P.

MECHANICAL / PLANT / PROJECT - ENGINEER

PROFESSIONAL OVERVIEW

A competent and responsible Mechanical Engineer with more than ten (10) years of progressive & combined experiences in Project Engineering & Development, Plant Operation, Project Management, Technical Coordination and Construction. With an extensive experience in Industrial & Medical Gases and LNG Industries.

EXPERIENCE

LEAD MECHANICAL ENGINEER / SENIOR PROJECT

ENGINEER

(Energy World Group) Slipform Eng International Philippines Inc.

(September, 2018 – November, 2020)

Perform multi-task roles of Lead Mechanical Engineer and Project Engineer for various projects of Natural Gas Processing and Liquefaction Plants; and other projects such as: Renewable Energy, Infrastructures and Buildings.

As Lead Mechanical Engineer, specifically responsible in overseeing the Mechanical, HVAC, Fire Protection Designs of different projects in accordance to the standard codes and specifications.

To effectively review, evaluate, monitor, motivate, delegate and train each specialization on their assigned tasks.

Provide leadership and develop innovative approaches and solutions for advancing UOP’s knowledge in equipment and skid designs.

Develop innovative and cost-effective solutions in designing process related equipment.

As Project Engineer, primarily responsible in contributing to define the Discipline list of activities, list of deliverables and time schedule in accordance with Contract requirements.

Acquires and understands the Project goals from Contract, specific documentation and the kick-off meeting.

Collaborate with other project team members to comply with project requirements and meet project schedules.

Checks and signs all produced documents (internal or subcontracted) like design reports, technical specifications, drawings, etc.

Produces the methodologies / Design Premises comprehensive of all necessary data, general and specific design guidelines.

Involve in preparation and submission of technical requirements for permits & compliances of the projects.

Takes any corrective action within the Engineering Team necessary for this purpose or reports to PEM for more extensive problems. C O N T A C T

adln4q@r.postjobfree.com

+63-977-***-****

ferdinand-nicandro-b21144193

Manila, Philippines

MAPUA INSTITUE OF

TECHNOLOGY

B.S. Mechanical

Engineering

2006

COLEGIO DE SAN JUAN

DE LETRAN

Primary & Secondary

Studies

2000

E D U C A T I O N

DATE OF BIRTH

April 14, 1983

NATIONALITY

Filipino

HEIGHT

5’8”

WEIGHT

175 lbs.

CIVIL STATUS

Married

RELIGION

Roman Catholic

LANGUAGE SPOKEN

Filipino / English

PASSPORT #

P3806383A

AUTOCADD 2005

Microcadd Technologies

Manila, Philippines

2004, Sept.

PLANT SHIFT-SUPERVISOR / SPECIAL PROJECT

ENGINEER

Air Liquide Philppines, Inc.

(June, 2015 – July, 2016)

Perform multi-task roles of Plant Shift-Supervisor and Special Project Engineer for ASU, H2, CO2 and Refilling Plants.

As Plant Shift-Supervisor, specifically responsible for the plant operation and maintenance of all plants.

As Special Project Engineer, primarily responsible for conceptualization, design, planning, execution, and closed-out of assigned special projects. Projects implemented without safety incident, on budget, on quality and completed on given schedule timeline.

Initialize to monitor data, analyze problems and results, and implement improvements regarding Energy, Production and Logistics through coordination with different personnel.

Responsible for the continuous safe and reliable operation of the production plants & refilling to satisfy the customer requirements.

Manage all staff reporting to the position so as to effectively recruit, train, evaluate, motivate, delegate and monitor their activities.

ON-SITE PLANT ENGINEER / PROJECT ENGINEER

Air Liquide Philppines, Inc.

(January, 2011 – June, 2015)

Perform multi-task roles of Project Engineer and On-Site Plant Engineer for all on-sites plant.

As On-Site Plant Engineer, specifically responsible for the line implementation of safety, quality, reliability, and efficiency systems and programs of APSA, HYOS, and SPIL onsite gas generating plants and its components as well as its ancillary.

As Project Engineer, primarily responsible for conceptualization, design, planning, execution, and closed-out of assigned projects. Projects implemented without safety incident, on budget, on quality and completed on given schedule timeline.

Conceptualize and implement on-site plant innovative projects with respect in safety, quality, and efficiency.

Actively participate in implementing continuous improvements which will generate savings on operation cost and losses improvement programs.

Attain reliability targets by consistent implementation of pro- active maintenance system and continuous improvements in plant operation.

Performs first line maintenance and troubleshooting with proper communication with CMS (Central Maintenance Service) Group.

Performs reliability program of On-site gas generating plant including its components with coordination of CMS Group. P E R S O N A L

B A C K G R O U N D

TRAINING COURSE

Participates in HAZOP and risk assessment sessions, efficiency suggestions, reliability and occurrence reporting, lessons learned in order to assure that the plant conform to the best practice and safety/technical recommendations of AL group.

Identify and Integrate EIS (Element of Importance for Safety) tags in on-site plant P&ID.

Operating, monitoring and controlling the plants within its optimum capability and customer specifications.

Oversee Operation of APSA Plant and Back-up Systems.

Participate in Coordination Meeting and Operation Review Meeting with department heads and colleagues.

Also, performs as a Commissioning Engineer when it comes to expansion and generating a new air separation plant.

TECHNICAL COORDINATOR / PROJECT ENGINEER

Air Liquide Philppines, Inc.

(May, 2009 – December, 2010)

Perform multi-task roles of Project Engineer and Technical Coordinator for Total Gas Management (TGM).

As Project Engineer, primarily responsible for conceptualization, design, planning, execution, and closed-out of assigned projects. Projects implemented without safety incident, on budget, on quality and completed on given schedule timeline.

As TGM Technical Coordinator, specifically responsible for providing required engineering deliverables as specified by Total Gas Management (TGM) and acts as a Technical Compliance Officer for TGM Operations. Technical compliance at site operation includes planning and facilitating implementation of planned technical operation objectives.

Contribute in implementing Corrective Actions, Root Cause Analysis, Risk Assessment, FMEA, IMS action items and Safety Action Plan.

Provide ISO documents for applicable for electronics specialty gases operation and natural gases as well.

Lead in identifying emergency situations regarding security and safety of the facility.

Implement safety audit and emergency drill activities at plant and control room.

Monitor and adjust process parameters to ensure safe operation and product quality

/reliability.

Monitor and report products inventory including forecasting of ESG.

Oversee Operation of APSA T7, VIE & back-up system, ESG operations including VMB’s, GC’s and other bulk gas equipment.

Compile and record maintenance data, equipment important for safety (EIS) group technical procedures/instructions/information for Total Gas Management operations.

Conduct Helium Dewar for MRI Hospitals.

PROJECT ENGINEER

Air Liquide Philppines, Inc.

(October, 2008 – May, 2009)

Specifically, responsible for the profitable and successful completion of assigned projects, meet company’s obligations and customer requirements and expectations.

Awareness of the project’s contract, scope of work, budget and number of manpower and lead-time.

Establish a projected schedule and any other control tools and reports such as Cost Monitoring, Project Schedule, and PEP-Project Execution Plan prior project execution.

Secure all materials/equipment and manpower availability while assisting Purchasing Department in validation of all materials/equipment specification as required by the project.

Participate on the resolution of complex design potential problems. (P&ID, Pipe/Valve Sizing and Design Layout to comply with the project requirements and technical standards)

Securely implement safety programs on mitigating and preventing identified risks or potential hazards from the work place. Ensure to comply with all Safety and Quality standards by strict implementation of work permit system and conduct necessary project safety assessment such as Preliminary Risk Identification, Project Risk Assessment, Job Hazard Analysis and Ready for Start-up Unit. PROJECT INSPECTOR

Maynilad Water Services, Inc.

(February, 2008 – August, 2008)

Primarily responsible for the project execution supervision, and inspection for the rehabilitation and expansion of water distribution system.

Awareness of the project’s contract, scope of work, budget and number of manpower and lead-time.

Participate on the resolution of complex design potential problems. (P&ID, Pipe/Valve Sizing and Design Layout to comply with the project requirements and technical standards)

Securely implement safety programs on mitigating and preventing identified risks or potential hazards from the work place. Ensure to comply with all Safety and Quality standards by strict implementation of work permit system and conduct necessary project safety assessment such as Preliminary Risk Identification, Project Risk Assessment and Job Hazard Analysis.

Implement necessary penalties and charges for mandatory safety and quality compliance of the Contractor during project period. AUTOCAD OPERATOR

Zawawi Corporations.

(December, 2004 – March, 2005)

Responsible for the design and layout of automotive parts and components.

The quality of design based on the given requirement by Parts / Warranty Department. Seminars & Trainings

(September, 2018 – Present)

Safety First Aid Training and Sea Survival Training --- RODECH (Guadalupe, Philippines)

GEAR-UP Training (Skills Development for Supervisors & Managers)

KITE - Google Apps (Soft Skills & Hard Skills) Training --- Google (Ecotower, BGC, Philippines)

BOSH Training (Basic Occupational Safety & Health) --- World Safety Organization

(Oracle Hotel & Residences, Quezon City, Philippines)

Technical Safety Training --- World Safety Organization (Cavite, Philippines)

Basic Fire Fighting --- Taguig Fire Department (FTI Complex, Taguig, Philippines)

First Aid Training and Basic Life Support --- Philippine National Red Cross (Pasig Plant, Philippines)

Behavioral Basic Safety Observation --- Psyscan Consulting International (Makati, Philippines)

Automotive Basic Troubleshooting --- Honda Motors (FTI Complex, Taguig, Philippines)

Honda Defensive Driving --- Honda Motors (Sucat, Philippines)

A1 Trade / Driving Test --- A1 Driving School (Mandaluyong, Philippines)

ISO 9001-2008 Internal Audit Training --- Air Liquide Philippines, Inc. (Pasig Plant, Philippines)

ISO Awareness Seminar / IMS Awareness --- Air Liquide Philippines, Inc. (Pasig Plant, Philippines)

Element of Importance for Safety Training --- Air Liquide Philippines, Inc. (Pasig Plant, Philippines)

Compression & Refrigeration Process Training --- Air Liquide Philippines, Inc. (SEMPHIL Plant, Philippines)

Adsorption & Heat Transfer Process Training --- Air Liquide Philippines, Inc. (SEMPHIL Plant, Philippines)

APSA Control System Training --- Air Liquide Philippines, Inc. (SEMPHIL Plant, Philippines)

Electrical Wiring Diagram Training --- Air Liquide Philippines, Inc. (SEMPHIL Plant, Philippines)

APSA Training & Process Control Training --- Air Liquide Philippines, Inc. (SEMPHIL Plant, Philippines)

ALJ APSA Process Control Training --- Air Liquide Philippines, Inc. (SEMPHIL Plant, Philippines)

Oxygen Safety Training --- Air Liquide Philippines, Inc. (Pasig Plant, Philippines)

Emergency Response Training --- Air Liquide Philippines, Inc. (Pasig Plant, Philippines)

Hydrogen Fire Drill --- Air Liquide Philippines, Inc. (FTI Complex, Taguig, Philippines)

Hydrogen Gas Handling & Safety Training --- Air Liquide Philippines, Inc. (Pasig Plant, Philippines)

Project Management Training --- Air Liquide Philippines, Inc. (Pasig Plant, Philippines) Skills

COMPUTER SYSTEM (Hardware and Software)

MS OFFICE, MS PPROJECTS and ADOBE PHOTOSHOP & ILLUSTRATOR SHOP OPERATION AND INSTRUMENTATION

AUTODESK AUTOCADD & REVIT

MUSIC & VIDEO EDITING and MIXING



Contact this candidate