Post Job Free

Resume

Sign in

Electrical Mechanical

Location:
Marengo, IL
Salary:
62000
Posted:
April 11, 2021

Contact this candidate

Resume:

JOSEPH MASTRO **** Bayside Dr #* Palatine Il ***** Cell:

708-***-****

adlltz@r.postjobfree.com

EMPLOYMENT CONTRACT

Brightstar Liberteyville,Il 9/14-Present

-Maintenance mechanic troubleshooting all electrical/mechanical

distribution equipment in facilities.

-Equipment include Wynright conveyor and sorting systems, Fanuc robotics,

Thermotron chambers and sealers, Panther print and applies, tape, auto

baggers and boxing machines.

-Facilities technician for

electrical, mechanical, electro-mechanical, electronic, PLC automation

troubleshooting and repair.. -Use test equipment,

hand and power tools, machine shop to perform duties

Wright/Arens, Arlington Heights, Il 10/12-5/14

-Engineering technician modifying, validating, calibrating and

troubleshooting to component level SMT ten layer power electronic boards.

-Building prototype test fixtures, printed circuit boards,

cable harnessing and wiring automation racks

-Use DVM's, oscilloscopes, power supplies, spectrum

analyzer's, signal generators to test prototype products.

- Performed EMC and Dynameters testing and troubleshooting

Shure Microphones-Niles,IL 9/10-5/11

-Electronic technician for the ATE

department assembling prototype test fixtures for PSM 1000 RF wireless

system. -Performed electronic device fabrication including

soldering wire, routing, connecting.

- Populated and soldered electrical components to various PCB's using

leaded and surface mount devices. - Use hand and power

tools, test equipment such as DVM's, oscilloscope, spectrum analyzer, etc.

- Read and understand wiring

diagrams, schematics, and blue prints.

Baxter

GTS, Buffalo Groove IL, 3/09-9/09

-Certified electro-mechanical technician troubleshooting the Colleague IV

infusion pumps for global technical services.

-Used all procedures, protocol, documents, schematics, test equipment, hand

tools to test, troubleshoot, calibrate, and validate the IV infusion pumps

for the hospitals.

System Research Incorporate

Fluid Management, Wheeling Il, 2/08-8/08

-Build and validate electrical test fixtures for hardware and software

testing of precision fluid metering equipment

-Support new product developments building and validating prototypes.

-Build cable harnesses, perform product life and reliability testing,

collecting data and report results.

-Perform electrical component qualification testing, collecting and

analyzing data.

-Use basic Labview and other data capturing programs.

Oxford Instruments, Carol Stream, IL 6/07-10/07

-Assistant Engineer for coating measurement devices that measure thickness

of PCB traces and metals.

-Perform testing and analysis of electronic coating measurement

instruments.

-Select appropriate equipment and measurement procedure; write reports.

-Used environmental chambers.

CEF Industries, Addison, Il 8/06-1/07

-Engineering Technician for an Aerospace electro-mechanical company.

-Experimental work taking data down and figuring out ways to produce and

build prototype test equipment used for testing aerospace actuators.

-Order all parts and build from schematics electronic test equipment from

the ground up.

-Products were electronic, electrical, pneumatic, and mechanical.

-Use all tools and test equipment to troubleshoot to component level analog

and digital circuits.

-Worked with engineers to design test equipment and modify product.

Tellabs-Naperville, IL 1/06-8/06

-Research and development lab technician assisting four engineers in their

complex fiber optic transponder /multiplexer PCB used for transferring

voice, data, and video telecommunications.

-Performed testing, calibrating, troubleshooting, and modifications on a 24

layered 5000 component SMT PCB.

-Used Tektronix digital scopes and communication analyzers for validation

of signal integrity.

-Used computer Layout programs of PCB to configure schematics, test points,

and soldering modifications.

-Used magnifiers and soldering equipment to solder SMT PCB down to 402's

component size.

-Tracked project using ECO's, BOM's, SAP, and updating old revisions

Manpower

Motorola Schaumburg, Elgin, IL 2/04-07/05

-RF calibration, testing and troubleshooting to component level government

secured two way portable and mobile radios.

-Use communication RF equipment, scopes, DVM, and all other test equipment

to troubleshot boards.

-Conducted field service as well as Quality control.

ESPO Engineering

Northrop Grumman, Rolling Meadows, IL, 8/02-10/03

-Built five prototype Interface Test Adapters (ITA's) for the Combined

Intermediate Automatic Test Equipment (CIATE) program.

-Prototype ITA's used on automated test equipment systems contained over

1000 components and 4000 wires which took over two months to assemble.

The CIATE program is used for the development of agile beam radar that is

used for the security of the military and government.

AMERLINE ENTERPRISES, CICERO, IL 9/01-2/02

-Assistant engineer for an electro-mechanical contract specialist whom

manufactures cables, harnesses, and PCB's.

-Used computer to write up production work processes and orders for

assembles.

-Helped reorganize the production floor for the highest efficiency.

EMPLOYMENT PERMANENT

MPC PRODUCTS,

SKOKIE, IL 8/00-8/01

-Built prototype test equipment that tests aerospace and aviation products

for production.

-Layout and integrate cables, vector printed circuit boards, consoles, and

systems from schematics and blue prints for electronic engineers.

-Ordered all parts from vendors to form systems from the ground up.

-Troubleshoot or calibrate test equipment on the floor. MPC products are

used on F16's, F18's, F22's military aircraft as well as commercial

airplanes.

- Manufacture of rotary, linear, and right angle actuators that navigate

airplanes.

BURR-BROWN CORP., TUCSON, AZ 10/97-6/00

-Troubleshoot to component level operational automated test equipment that

is used to test Integrated circuits (IC's).

-Maintenance technician for all electrical, electronic, electromechanical,

and mechanical test equipment on production floor. -Determined conformance

to specifications as indicated, predetermined testing procedures through

Test Equipment Operations (TEO's) software and schematics.

-Used computer diagnostics software to run functional testing on equipment.

-Fixed gravity feed (IC's) handlers such as Daymarc, Exatron, Thermonics,

and Mult-test to run product.

-Used test systems such as SZ, HP, and LTX were also repaired.

-Burr-Brown IC's are used on a wide range of products from video, audio,

computer, telecommunications, medical, NASA, and government technologies.

SIEMENS NUCLEAR MEDICINE, HOFFMAN ESTATES, 9/96-6/97

-Manufacture, diagnostic test and troubleshoot to component level prototype

medical equipment.

-Gamma and beta -ray camera systems used for scanning 3D images of human

body.

-Worked in field services the last three months with shipping coordinator

for all rework on PCB, and medical hardware brought in and out of the field

from hospitals.

VANGUARD AUTOMATION, TUCSON, AZ, Summer 96

-Electrical technician for prototype robotic equipment used for surface

mount ball grid array technology.

-Hands on point to point wiring of entire machine.

-Used computers to interface all PLC's, sensors, motors, converts, and

pneumatic lines for machine operation.

ALLIED- SIGNAL AEROSPACE, TUCSON, AZ, 1995-1996

-Set up and performed functional testing and calibration using manual and

automated test equipment in accordance with applicable test procedures.

-Performed troubleshooting to component level.

-Recorded test data and completed component removal acquisitions.

-Used special test equipment such as temperature coefficient ovens, shake

tables, power supplies, pneumatic calibration.

-Performed circuit card assemblies using CS-400 and Amstar component

insertion equipment.

-Used Genrad test eqipment.

- Transducers were used to measure pneumatic pressures on aircraft and

missiles for speed and altitude.

MICRO-CAVITY LABORATORIES/MIDEC, BOLINGBROOK, IL, 1989- 1995

-Designers and manufactures of Microwave and Satellite communications.

-Heavy assembly and calibration testing of electro-mechanical parts,

cables, wire harnesses, PCB's, and control panels.

- Assembled and tested RF amplifiers, power supplies, transmitters,

Traveling Wave Tube Amplifiers (TWTA's), Klystrons, Redundant, Tridundant

systems using various hand and power tools, blue prints and schematics,

wire lists, and test equipment.

-Laying entire systems together with hands-on knowledge of all parts

(company and vendor made) to form product.

-Worked on various prototype projects also. Special MCL Project : Built

Russia Siberia earth station that interlinked the Winter 1988 Olympic games

for NEFTEL Network Systems.

-Worked on the Harris U.S. Army project High Power Amplifier systems.

-Built HBO Klystrons for IMARSAT Communications.

EDUCATION

RICHARD J. DALEY COLLEGE, CHICAGO, IL

Associate in Applied Science, Electronics, December 1987

Advanced certificate of Achievement technology May 1988



Contact this candidate