Post Job Free

Resume

Sign in

Land Surveyor

Location:
Mumbai, Maharashtra, India
Salary:
60000
Posted:
April 11, 2021

Contact this candidate

Resume:

* ** *

Prakash Chauhan, Senior Surveyor

CURRICULUM VITAE

Name:

PRAKASH BHIKHABHAI CHAUHAN

Designation: Senior Surveyor

Nationality: Indian Skype id: Prakash.chauhan36

Date of birth: 13/12/1979 Mobile Number: +919********* Passport No: Z5944667 Expiry date: 19/03/2030

Mail id: adllad@r.postjobfree.com, adllad@r.postjobfree.com Education: Diploma, Civil Engineering (2004-2007)

Institute of Management & Technical Studies, Noida, India Provisional National Trade Certificate, Surveyor (1995-1997) Industrial Training Institute, Government of Gujarat, Vadodara, India National Trade Certificate, Surveyor

NCVT-Ministry of Labor, Government of India, New Delhi, India CAREER SUMMARY

• As a Surveyor having more than 20 Years above professional experience in execution, planning, monitoring of survey works and commanding and site administration by involving in Oil/Gas Industries-Onshore, Pipe Lines & Infrastructure etc. Reliable and resourceful person with Good interpersonal leadership skills, Adaptability, Passion for growth, result oriented, committed to excellence, Positive Attitude, Knowledge of Construction activities and well experience in handling advanced types of survey equipment for all types of engineering works and survey related processing software.

:

• I am Handled following equipment as a Leica VIVA GS-14 DGPS, NAVCOM Star Fire

(GSBAS), Leica Builder 402, Leica 1202, Nikon, Pentax, Sokkia, Topcon Total Station, Optical Theodolite, Auto Level and related PC program

• Overall 20 years of extensive experience in Onshore/Oil & Gas / LNG / Petrochemicals

/ Refinery etc.

• Topographic surveys for small- and large-scale mapping. SKILLS:

• Survey control net establishing (traversing and leveling), with adjustments and calculations.

• Property boundary surveys.

• Surveys for underground conduits and other facilities.

• CAD Astral Survey, Plot Demarcation / City Survey.

• Calculations, sketches and records supporting survey activities.

• Independent surveys to given instructions.

• Stakeout alignment and preparing new IP’s as per site situation.

• As built survey.

• Calibration of survey equipment.

• Survey data processing.

2 of 6

Prakash Chauhan, Senior Surveyor

CAREER HISTORY:

Petrofac International UAE LLC-INDIA. (21-05-2018 to 30-05-2020)

Senior Surveyor (G-16) (21-05-2018 to 30-05-2020)

Project - Integrated Gas Surface Facilities for RDG Field Project Value - US$ 233 Million

Client- Vedanta/Cairn India Ltd, Barmer, India

• EPC, Pre-Commissioning & commissioning the scope of work includes well pad, flow line, pipeline & a new gas processing terminal.

Key elements of the Projects: -

• As per RFI Verified new survey control point network & benchmark for construction purpose. Responsibility and achievements: -

• Monitoring & Supervision of sub-contractor’s field survey and civil works for Pipe line, Road, underground facilities, bending survey physical verification of, etc.

• RDG & RGT area All anchor bolts equipment foundation, pipe sleeper, Pipe support, Pipe rack, GTG, Compressor, Internal road, Drain, Manhole, 132KV switch yard Sub-Station, Control building, Main sub-station building, Fire station, Canteen building, Security building, 04 No ‘s tank farm foundation center line & level checking with PMC & sub-contractor surveyor.

• Horizontality & Verticality checking of Tank, Equipment, Vessel & structural columns etc.

• Pipeline Inspection of 17.65km route Survey, bending survey, Pipeline grading activities etc.

• Well pads in inspection of seller foundation, pipe sleeper, Tie-in point survey, Knock out Drum

(KOD), Trestle foundation, Vent stack, Nitrogen cylinder package, wellhead control panel survey activities.

• OHL line route survey marking and inspection of tower pole foundation. Saipem-Essar JV (Essar Projects (I) Ltd.) (Dec-2015 to Feb-2018)

Civil Surveyor (M9) (Dec-2015 to Feb-2018)

Project - Al Zour New Refinery EPC#4

Project Value - US$ 700 Million

Client- Kuwait Integrated Petrochemical Industries Company (KIPIC) A Subsidiary of Kuwait petroleum corporation (KPC), Kuwait.

• EPC, Pre-commissioning and assistance during commissioning/start-up/performance testing for the tankages, related Road works including three bridges, buildings, sleepers, pipelines, water systems and control systems.

Key elements of the Projects: -

• Monitoring & Supervision of sub-contractor’s field survey and civil works for Pipe line, Road, underground facilities, bending survey physical verification of, etc. Responsibility and achievements: -

• Preparation of basic layout drawings for road and other related facilities as per the detailed site survey.

• Preparation of As-built Drawings, Isometric drawings, Assembled drawings & Construction drawings (Piping, Civil & Electrical), Structural Bridges, Tank farm etc.

• Perform office works for prepare as built drawing. Gammon India Ltd. (May-2015 to Dec-2018)

Survey Forman (May-2015 to Dec-2018)

Project - 72 Stored Tower

Project Value - US$ 120 Million

3 of 6

Prakash Chauhan, Senior Surveyor

Client- Nathani Parekh Construction Pvt. Ltd, Maharashtra, India

• 72 Stored Tower Including Swimming Pull, Garden shopping center, Parking, Ramp, Core wall, Mega Column, Shrewall Cantilever shafts etc.

Key elements of the Projects: -

• Responsibility and achievements: -

• All Structural foundation layout marking, chamber Patti level marking on shutter top.

• All tower columns, podium column, Mega column, share wall, core wall and cut out every layout co-ordinates & Elevation marking as per IFC drawing.

• Every floor to floor Horizontal-Vertical co-ordinates & level maintain and checking with PMC.

• All tower columns, podium column, Mega column, share wall, core wall and cut out as built submitting PMC & Client.

Essar Construction Overseas Ltd. (Aug-2013 to Sep-2014)

Civil Surveyor (Aug-2013 to Sep-2014)

Project - Carbon Black & Delayed Coker (CBDC)

Project Value - US$ 80 Million

Client- Samsung Engineering Ltd. at Ruwais, Abu Dhabi, UAE

• EPC and construction Works, commissioning and start-up for a Spent Caustic Treatment Plant of 3.6 cubic meter per hour capacity at Abu Dhabi Refinery. Key elements of the Projects: -

• Responsibility and achievements: -

• Establish new Survey control points and level marking for construction purpose.

• Major foundation as like coke pit, coke maze, Equipment, pipe rack, structure, oil sump, heater foundation & octagonal foundation layout marking with latest electronics equipment Leica-TS06 total station & auto level.

Reliance Port & Terminals Ltd. (June-2012 to July-2013)

Manager-Survey (June-2012 to July-2013)

Project - Purified Terephthalic Acid (PTA) plant and PET (Polyethylene Terephthalate) plant. Project Value - US$ 780 Million.

Client- Reliance Corporate IT Park Ltd. Gujarat, India

• EPC, Pre-commissioning and assistance during commissioning/start-up/performance testing for the tankages, related Road works including Oxidation, Reactor Process Sub-Station buildings. Key elements of the Projects: -

• Responsibility and achievements: -

• Establish new Survey control points and level marking for construction purpose.

• Monitoring & Supervision of sub-contractor’s field survey and civil works for Pipe line, Road, underground facilities, bending survey physical verification of, etc.

• All Pipe rack, Equipment foundation, Oxidation, Reactor Process Sub-Station, Tankages & All Anchor Bolt co-ordinates & top-level checking with Sub-contractor surveyor. Adani Township & Real Estate Ltd. (Sep-2011 to June-2012)

• Key elements of the Projects: -

Jr. Engineer-Survey (Sep-2011 to June-2012)

Project - “Shantigram” The Good Life Township

Project Value - US$ 780 Million.

Client- Adani Township & Real Estate Ltd. Gujarat, India 4 of 6

Prakash Chauhan, Senior Surveyor

• “Shantigram” The Good Life Township. (09 Halls Golf Course, 261 Bungalows Township, Meadows Phase 1 & 2 A to K-Block, Internal Road, Club House, Hotel, Nursery, and Cricket Ground etc.)

• Responsibility and achievements: -

• All Halls of GOLF COURES, T-Point, Turning Point & Green Point, Sand Bunkers, catch basin, Main Hall, car path setting out point Checking with Sub Contractor surveyor.

• All Bungalows/Meadows, High Rise Flat, Villa’s Foundation, beam, Column & Basement Slab to 16 Flore Top Slab 7 Column Layout Checking with Sub Contractor Co., Center line Checking, Level Checking with sophisticated electronics Window total station & Auto Level. Simplex Infrastructure Ltd. (Feb-2011 to Sep-2011) Senior Surveyor (Feb-2011 to Sep-2011)

Project - 1200MW (3 Units of =400MW each) DGEN Gas Base Mega Power project Project Value - US$ 780 Million.

Client- Torrent Power Ltd/Siemens, Gujarat, India

• Key elements of the Projects: -

• 1200MW (3 Units of =400MW each) DGEN Gas Base Mega Power project at Dahej SEZ, Bharuch. Gujarat (India).

• Responsibility and achievements: -

• All 600 Dia Piles point Marking & Casing Top Level Checking with PMC Engineer.

• All Structures for Gas & Steam Turbine Building, Heat Recovery Steam Generator, Diffuser Noise Protection Walls, Pit for Boiler Blow Down & HRSG Drain Tank, Pipe & Cable Bridge, OOUGG & 02UGA, Clarified Raw Water & Fire Fighting Water Building Above All Structures Center line, Layout & Level Marking as per Drawing & checking with PMC Engineer. Larsen & Toubro Ltd. (Nev-2010 to Feb-2011)

Professional Surveyor (Nev-2010 to Feb-2011)

Project - Knowledge City & Factory Building

Project Value - US$ 300 Million.

Client- Larsen & Toubro Ltd, Gujarat, India

• Key elements of the Projects: -

• Knowledge City & Factory Building Project, India

• Responsibility and achievements: -

• All types of Precast Column Irrigation Vertical Alignment Checking with electronic total station 250RX.All footing Excavation to up to Plinth Beam top Column Starter Point marking. Giving mark out for Road Excavation or Embankment marking in Factory Building. Navratna Organizers & Developers Ltd. (July-2009 to Oct-2010) Surveyor (July-2009 to Oct-2010)

Project - Kalhar Blues & Green

Project Value - US$ 450 Million.

Client- Navratna Organizers & Developers Ltd, Gujarat, India

• Key elements of the Projects: -

• 18 Halls Golf Course, 850 Bungalows Township, 07 Lakes, Internal Road, Club House, Hotel, etc.

• Responsibility and achievements: -

• All Halls of T-Point, Turning Point & End Point, Sand Bunkers, Center line marking.

• Lakes Boundary Layout marking & Calculation of Soil Quantity for Contractor Billing purpose. Calculation of Contour line for Hip Area Filling of Soil

• All Bungalow Footing Layout marking, Center line marking, Level marking. 5 of 6

Prakash Chauhan, Senior Surveyor

Shapoorji Pallonji & Co. Ltd. (Oct-2007 to May-2009) Land Surveyor (Oct-2007 to May-2009)

Project 1 - MVI Factory Building at Aalamgadh

Project Value - INR 210 Crores

Client- AREVA T & D (I) PVT. LTD., Gujarat, India

• Key elements of the Projects: -

• Power transformer factory & Office Building

• Responsibility and achievements: -

• High Rise Shed & Office Building Layout marking with electronic total station PENTEX-325RX.

• As per Drawing all Foundation, Pedestal Anchor Bolts & Top-Level marking. Project 2 - Tata Motor Nano Car Plant

Project Value - INR 20 Billion

Client- Tata Motors Ltd., Gujarat, India

• Key elements of the Projects: -

• Tata Motors’ own plant spread over 725 acres, and an adjacent vendor park, spread 375 acres.

• Responsibility and achievements: -

• As per Drawing Weld Shop, Press Shop, Paint Shop & TCS Shop all Foundation & Pedestal Anchor Bolts co-ordinates & Top-Level marking.

• Capable of handling with all latest instruments like Total station. Span Consultants Pvt Ltd. (Feb-2006 to Sep-2007)

Land Surveyor (Feb-2006 to Sep-2007)

Project - State Highways in the State of Jammu & Kashmir Project Value - Asian Development Bank (Loan No. IND-2151) Client- State of Jammu & Kashmir, India

• Key elements of the Projects: -

• Detailed Design and Construction Supervision for Widening & Strengthening of State Highways in the State of Jammu & Kashmir. Length: 101 km.

• Responsibility and achievements: -

• Conduct detailed Topographic Survey using sophisticated survey equipment’s like Total Station, Auto Level, Optical Theodolite, GPS, etc. Collection and recording of Site Topographic Data in Computers using 3-D co-ordinates and Geometry Data download from Total Station to Computer. Setting out of road alignment in all types of terrains and fixing the station points with reference to reference pillars using design co-ordinates and taking levels with sophisticated survey instruments for fixing of Horizontal, Vertical Alignment and establishment of benchmarks with reference to GTS benchmarks as per laid down specifications. Collecting of existing structures’ details such as Bridges, Slab Culverts & Pipe Culverts, etc. Checking of final alignment Layout of Minor and Major Bridges, Box Culverts and Setting out of curves By Total Station. Checking of Temporary and Permanent Bench Marks. Checking of Sub grade, GSB, WMM, BM, DBM and BC levels. Preparation of L-Sections, Cross sections of Roads for Quarry computation. Setting out alignment for construction of highway layers as per design co- ordinates at Median and Shoulder side, in embankment, Sub grade, and GSB, WMM, DBM, BC, KERB & pavement layers. Setting out alignment for major, minor junctions and service roads as per design co-ordinates.

M/S Daelim Industrial Co. Ltd-NCC (JV). (Dec-2001 to Jan-2006) Land Surveyor (Dec-2001 to Jan-2006)

Project - Strengthening & Widening of SH-24 Rajkot – Morbi 6 of 6

Prakash Chauhan, Senior Surveyor

Project Value - Asian Development Bank.

Client- Feedback Ventures Pvt. Ltd. Gujarat, India

• Key elements of the Projects: -

• Strengthening & Widening of SH-24 Rajkot – Morbi (Km 1+827 to70+192) and paving of shoulders, GSHP-10 Phase II B, World Bank Aided Project.

• Responsibility and achievements: -

• Checking of final alignment Layout of Minor and Major Bridges, Box Culverts and Setting out of curves By Total Station.

• Checking of Sub grade, GSB, WMM, BM, DBM and BC levels.

• Preparation of L-Sections, Cross sections of Roads for Quarry computation.

• Setting out alignment for construction of highway layers as per design co-ordinates at Median and Shoulder side, in embankment, Sub grade, and GSB, WMM, DBM, BC & KERB layers.

• Setting out alignment for major, minor junctions and service roads as per design co-ordinates.

• Assist the Quantity Surveyor in quantity calculation and preparation of invoices, etc. M/S Backbone Enterprises Pvt. Ltd. (Nov-1999 to Nov-2001) Surveyor (Nov-1999 to Nov-2001)

Project - Panipat-Delhi Canal Project in Haryana.

Project Value – 200 Crores

Client- State of Haryana, India

• Key elements of the Projects: -

• Constructing canal earthwork & structures work

• Responsibility and achievements: -

• Canal route alignment marking & taking natural ground level.

• Canal bad level checking, Slop checking & brick line checking with Auto level & Theodolite. Theo-Tech Engineers (Survey Consultants) (Aug-1997 to Oct-1999) Land Surveyor (Aug-1997 to Oct-1999)

Project - Reliance New Refinery Project

Project Value – $6+ billion

Client- Bechtel India Pvt. Ltd.

• Key elements of the Projects: -

• Engineering, procurement, project management, and construction consulting Largest refinery & petrochemicals complex ever built from the ground up.

• Responsibility and achievements: -

• Stakeout alignment and preparing new IP’s as per site situation.

• Topographic surveys for small- and large-scale mapping.

• Survey data processing and preparing drawing.

I hereby solemnly declare that all the statements made in the above are true and correct to the best of my knowledge and belief.

Date: / /2021

Place: Vadodara, Gujarat Name: Prakash Bhikhabhai Chauhan



Contact this candidate