CURRICULUM-VITAE
Name : Riyadh Mustafa Mohammad Baik
Nationality : Jordanian
Date of Birth : 18.01.1970
E-mail : adli40@r.postjobfree.com
(Kuwait Mob.) : + 965- 67733715
Academic Qualification
Diploma in Civil Engineering: Al Arabia College, Jordan 1988 - 1990
Seeking Assignment in Engineering & Construction in Oil & Gas and Infrastructure Projects as Lead Construction Supervisor (CIVIL) in your Renowned and Reputed esteemed organization and promise to develop valuable skills during my years of experience to work with the superior’s satisfaction
Career Summary
Lead Construction Supervisor
I have more than 25 years of working experience in the field of construction, and
QA/QC related to petroleum refinery in the oil & gas industry
Highlights of Qualifications
•Experience in Supervision & Quality Control in the Construction of Refineries, Equipment Foundations, Tank Foundations, Pipe rack Foundations, Paving, Grouting, Bund walls
•Experience in Erection of Structural Steel for the Pipe racks, Workshop Buildings
•Experience in the construction of High raise Buildings, Roads, bridges and Water Treatment plants
•Experience in reviewing the Drawings and transmittals
•Extensively coordinated with the end user, contractor, and design division, material procurement
•Professional in Microsoft Office Package (Word, Excel, Power Point,) Auto CAD
•Proficient in both written and spoken Arabic & English
•Excellent inter-personal, leadership skills & decision-making ability
•Takes initiative & possesses exceptional communication skills
•Enthusiastic & Dependable
•Consistently maintains high-quality production without supervision
•Able to learn new concepts, troubleshoot & solve problems quickly
•Flexible with range of shift work.
Knowledge of (H2S) Gas "Hydrogen sulfide" and using SCBA (Self Contained Breathing Apparatus)
Proficient with EHS, Work permit and Job safety analysis (JSA)
Employment History
Company – Kuwait System Gen. Trad. & Contracting Co
2019 until now
KOC PROJECT CONSTRUTION OF SOUTH RATQA RODS
Worked as Supervisor for various Oil & Gas projects at south Ratqa - Civil works for
Road works such as excavation, backfilling, asphalting and related infrastructure works.
Company – “DNV GL”
2016 - 2019
KIPIC – NRP –Package 1 (EPC 055A)
AL-ZOUR Refinery Project.
Lead Construction Supervisor and inspector (Through Secondment)
Managing and supervision all the Civil work at the project. Conducting all inspection for Civil works for pipe supports, pipe rack, valve pits, Paving and pre cast structures (Installation), excavation, backfilling, equipment foundations, Road work. Asphalting and infrastructure works. Also the Steel structure erection and Bolt torque inspections with material verifications. Approval of MAR and ITP and PQP with final Quality dossier and coordinating punch list close outs. Approval of Quality matrix for MCN.
Saudi Arabian Chevron/Kuwaiti Gulf Oil Company – Joint Operations
Project & Facilities Engineering Department - Wafra Field, - Kuwait
Lead Construction Supervisor (Through Secondment) 2007 – 2016
Managing and supervision all the Civil Projects inside the Main Gathering Centre (MGC), Power Generator Plant (PGP), Sub-Centers, and Environmental projects related to Pressure Maintenance Plant (PMP).
Duties & Responsibilities
Conducted daily safety tool box meeting related to workplace safety regulations, etc.
Ensured that all mechanical/civil activities are carried out safely and in accordance with work permit and JSA with Safety Regulations Rules requirements.
Prepared and reviewed work procedures, checklists, overall schedule and work execution plan for the activities.
Planned, implemented & completed varied and complex projects to enhance the production facilities
Monitored activity progress on a daily, weekly and monthly basis and provided reports to the Construction Engineer as per the project reporting procedure.
Participated in pre-inspection meetings to ensure all technical issues are resolved and quality/inspection plan were finalized to achieve the scheduled delivery.
Discussed and resolved daily problems with civil inspectors and contractors to ensure smooth execution of the production program.
Reviewed the contract, scope of work, design drawings, specifications and request the changes as required before issuing drawings for construction (IFC).
Reviewed and approved of contractor submitted detail design drawings, equipment data sheets, specifications, work procedures, etc.
Coordinated with other departments involved in various projects (Process, Production and Safety).
Reviewing the Variation and claims of the contractors
Wafra Field Major Project Details
Construction of valve pits, sump pits, pipe rack foundations, pipe sleeper foundations, various equipment foundations for New lined pits project.
Construction of storage tank foundations, chemical tank foundations, equipment foundations, bund walls, roads etc. inside Main Gathering Center.
Construction of Roads, Culverts, bridges, Strom water drain and improvement of existing facilities, Car Parking, Septic tanks etc. – Main Gathering Center.
Construction of Administration building, Control buildings including Infrastructure & Lightings Chilled water line to facilitate the Main Gathering Center.
Construction of New Workshop Facilities (Electrical, Instrumentation & A/C Workshop) at Admin Camp.
Construction of 2 Eocene Tanks - a) Storage Tank (100,000 BBL) b) Process Tank (50,000 BBL)
Built new Water Disposal and Recycling Plant
Construction of Fence & Security Building in deferent locations.
Construction of Pipe racks for most new projects inside the Main Gathering Center
Construction of pipe lines from well to different facilities
Company – House of Trade
Period – 02.08-1998 to 2007
Worked as Supervisor for various Oil & Gas projects at Mina Abdulla - Civil works for pipe supports, valve pits, excavation, backfilling, equipment foundations, and Road work. related to various projects.
Company – KCPC
Period 01.07.1997 to 30.03.1998
Worked as Supervisor for Maintenance for Hawally and Farwaniya infrastructure project in Kuwait – All civil works related to infrastructure works such as asphalt works, sanitary sewer, storm water and associated civil works.
Company – Consolidated Contractors Company
Period 15.06.1996 to 15.03.1997
Worked as Supervisor for Al Sharq Water Front Project – Civil works such as backfilling, excavation, construction of box culverts, installation of concrete wave breakers, Asphalt etc.
Company – Burhan
Period 15.07.1993 – 01.08.1996
Worked as Supervisor for the 6th ring road and for various projects in Kuwait – Road works such as excavation, backfilling, asphalting and related infrastructure works.
Workplace Training
Incident & Injury Free Supervisor IIF- Joint Operations, Kuwait
Firefighting Training - Joint Operations, Kuwait
Hot & Cold Workplace Environment Safety Precautions Permit - Joint Operations Kuwait
Lifting and Rigging Course - Joint Operations, Kuwait
Confined Space Entry - Joint Operations, Kuwait
Excavation Procedure - Joint Operations, Kuwait
Environment, Health & Safety - Joint Operations, Kuwait
H2S Gas Safety Awareness- Joint Operations, Kuwait
Management of change MOC - Joint Operations- Kuwait
Desert Driving Training - Joint Operations- Kuwait
Defensive Driving - Joint Operations- Kuwait
Safety Leadership training program - Joint Operations - Kuwait
Other Information
Valid Driver’s license: Jordanian and Kuwait