Post Job Free
Sign in

Qc piping inspector/Piping supervisor

Location:
Pembo, Philippines
Posted:
April 06, 2021

Contact this candidate

Resume:

CURRICULUM VITAE

ARNOLD DACILLO MERCADO

Brgy. Salong Calaca

Batangas, Philippines

Mobile No. +639*********/+639*********

Email: adlgg4@r.postjobfree.com

CAREER OBJECTIVES

A challenging overseas career where I can obtain a position in company that will maximize my knowledge & experiences in piping and any related works, accorded with an opportunity to work in a reputed organization that will utilize the aforesaid expertise in contributing to the growth and progress of the company and be an asset of the organization enabling mutual growth.

PERSONAL HIGHLIGHTS

A hard-worker who is eager to learn and willing to invest time and effort necessary to complete the given task.

Able to take instruction from supervisor easily and carry out those instructions.

Honest, sincere and disciplined.

Willing to learn and contribute to the growth of the organization.

Able to coordinate effectively with management at all levels, perform sensitive assignment with dependability and functions.

STRENGTH:

Excellent communication skills, able to maintain positive team work environmental by developing mutual growth and rapport.

Willing to learn and contribute to the growth of the organization.

Capable to comfort all kinds of situation created by work demand and time restrain.

Able to coordinate effectively with management at all levels, perform sensitive assignment with dependability and function.

Bachelor of Science in Mechanical Engineering (BSME) at Polytechnic University of the Philippines Sta Mesa (1993-1997) 4th Year College

WORKING EXPERIENCE

INTERNATIONAL

National Contracting Company

P.O. Box 90 Al –Khobar Saudi Arabia

PROJECT: Saudi Aramco Khurais Satellite Expansion Project

AREA B32, B33, B34, B35, B36, B38, B39, B40, B42

FARABI DERRIVATIVE PETROCHEM PROJECT

YANBU AL BAHR K.S.A.

August 15, 2016 to February 27,2020

JOB DESCRIPTION / DUTIES & RESPONSIBILITIES

Review QCP, ITP and Inspection Standard Procedure.

Check pipe end and surface preparation for bell and spigot joint concerning tolerances for nose thickness, insert depth

Spigot diameter and shaved portion prior bonding of joint.

Check the application adhesive to make sure there is no excess adhesive to avoid reduction of internal diameter especially

for small bore RTR pipe.

Monitor the curing of bonded joint to ensure the heating blanket acquires heat required and also the curing duration as per

Manufacturer recommendation.

Check the supplied kit for lamination of butt and wrap joint; the application of resin-impregnated fiberglass fiber in every

layer of over wrapped boat tape and woven roving until the number of layers required are met.

Witness bolt torque for flange to flange connection to make sure proper sequence and torque increment is observe

until the required torque value as per manufacturer recommendation is met.

Review test package to ensure all joints are inspected, reported and accepted by client prior pressure testing.

Conduct hydro test, make sure the line is partially backfilled and temporary support/ trust block is provided if necessary.

Knows and complies with all the company safety rules and regulations.

Conduct dimensional, visual and fit-up inspection such as preparation, orientation and identification of heat numbers

of pipes and fittings and proper tag or identification of spools prior for welding.

Provide support for any identified potential non-conformances or any work defects occurring systematically.

Ensure that non-conformance reports have been closed out satisfactorily and that pertinent documentation have been completed.

Ensure that the isometric drawing in latest revision issued for construction.

Specify “Hold Point” and coordinates with the client representative for Approval.

Preparing of QC interim reports and QA/QC documentation works.

Keep all relevant documents and reports of all projects.

Coordinate with the Production and Engineering Department for drawing of material discrepancies.

Conduct dimensional, visual and fit-up inspection such as preparation, orientation and identification of heat numbers of pipes

and fittings, supports and proper tag or identification of spools prior for welding. Ensure that the isometric drawing in latest

Revision issued for construction.

Ensure that all erected pipe have air blowing.

Witness of Hydro Testing and Pneumatic Testing

Ensure that all testing and measuring equipment are identified, calibrated and suitable for testing and that instructions for their

use and setting are available.

Line checking and prepare punch list.

Keep all relevant documents and reports of all projects.

Coordinate with the Production and Engineering Department for drawing of material discrepancies.

SK Engineering & Construction CO.Ltd.

Khursaniya, Jubail 31951 K.S.A.

PROJECT: Saudi Aramco Wasit Gas Program Package Nos.1,3&4

May 14, 2014 – MAY 15,2015

JOB DESCRIPTION / DUTIES & RESPONSIBILITIES

Review QCP, ITP and Inspection Standard Procedure.

Implement Quality Assurance Plans, Procedures, Report Forms and Flow Charts in accordance with Project Quality Assurance

Manual and Quality Control Inspection Plan.

Inspect fit-up alignment, square, plumb, and levelness, check the fittings required as per material specification.

Conduct dimensional inspection of the fabricated pipes.

Check pipe end and surface preparation for bell and spigot joint concerning tolerances for nose thickness, insert depth, spigot

diameter and shaved portion prior bonding of joint.

Check the application adhesive to make sure there is no excess adhesive to avoid reduction of internal diameter especially for

small bore RTR pipe.

Monitor the curing of bonded joint to ensure the heating blanket acquires heat required and also the curing duration as per

manufacturer recommendation.

Check the supplied kit for lamination of butt and wrap joint; the application of resin-impregnated fiberglass fiber in every

layer of over wrapped boat tape and woven roving until the number of layers required are met.

Review test package to ensure all joints are inspected, reported and accepted by client prior pressure testing.

Conduct hydro test, make sure the line is partially backfilled and temporary support/ trust block is provided if necessary.

Knows and complies with all the company safety rules and regulations.

Chiyoda Malaysia

Sarawak, Bintulo, Malaysia

PROJECT: Tokuyama Polycrystalline Silicon Manufacturing Plant

May 28, 2013 – December 30, 2013

JOB DESCRIPTION / DUTIES & RESPONSIBILITIES

Review QCP, ITP and Inspection Standard Procedure.

Conduct visual inspection for every piping activity, verify dimension, gap, material grade and orientation as per receive

Isometric drawing.

Verify materials received, check for damage, overage, loss and keep records for documentation.

Update and review Daily Fit-up Report (DFR).

Review and familiarize applicable code such as ASME 31.3 for proper implementation of inspection.

Line checking of lines, raise punch for any discrepancy or incomplete item or item not complying with the isometric

drawing information.

Review test package to ensure all joints are inspected, reported and accepted by client prior pressure testing.

Conduct hydro test, make sure the line is partially backfilled and temporary support/ trust block is provided if necessary.

Knows and complies with all the company safety rules and regulations.

DAEWOO E &C (MAIN CONTRACTOR- SAIPEM SNAMPROGETI)

ARZEW-ALGERIA

PROJECT: GNL-3Z-ARZEW

August 11, 2011 – April 19, 2013

JOB DESCRIPTION / DUTIES & RESPONSIBILITIES

Review QCP, ITP and Inspection Standard Procedure.

Conduct visual inspection for every piping activity, verify dimension, gap, material grade and orientation as

per receive isometric drawing.

Verify materials received, check for damage, overage, loss and keep records for documentation.

Update and review Daily Fit-up Report (DFR).

Review and familiarize applicable code such as ASME 31.3 for proper implementation of inspection.

Line checking of lines, raise punch for any discrepancy or incomplete item or item not complying with the isometric

drawing information.

Review test package to ensure all joints are inspected, reported and accepted by client prior pressure testing.

Conduct hydro test, make sure the line is partially backfilled and temporary support/ trust block is provided if necessary.

Knows and complies with all the company safety rules and regulations.

Mohammad Al-Mojil Group (MMG)-Main Contractor-FOSTER WHEELER ARABIA LTD

Jubail Industrial City K.S.A.

PROJECT: FOSTER WHEELER ARABIA LTD

February 1, 2007 to April 14, 2009

JOB DESCRIPTION / DUTIES & RESPONSIBILITIES

Review QCP, ITP and Inspection Standard Procedure.

Conduct visual inspection for every piping activity, verify dimension, gap, material grade and orientation as per

receive isometric drawing.

Verify materials received, check for damage, overage, loss and keep records for documentation.

Update and review Daily Fit-up Report (DFR).

Review and familiarize applicable code such as ASME 31.3 for proper implementation of inspection.

Line checking of lines, raise punch for any discrepancy or incomplete item or item not complying with the isometric

drawing information.

Review test package to ensure all joints are inspected, reported and accepted by client prior pressure testing.

Conduct hydro test, make sure the line is partially backfilled and temporary support/ trust block is provided if necessary.

Knows and complies with all the company safety rules and regulations.

Conduct inspection for both CLIENT and MMG supplied incoming materials and verify if conformed to customer’s

specification requirements.

Conduct dimensional, visual and fit-up inspection such as preparation, orientation and identification of heat numbers

of pipes and fittings and proper tag or identification of spools prior for welding.

Mohammad Al-Mojil Group (MMG)

Dammam K.S.A.

Engineering Department

June 27, 2002 to November 24, 2006

JOB DESCRIPTION / DUTIES & RESPONSIBILITIES

Report directly to the QA/QC manager or any pertaining the project.

Supervise and direct quality control in project site.

Ensure that the approved quality system is effectively and efficiency implemented.

Lead the piping works discipline to achieve compliance with specified requirements, ensuring quality records are prepared

approved, Collated and securely maintained.

Assist to QA/QC manager in submission for approval of all data on project QC State to be assigned.

Monitor and report on site quality controls performance.

Supervision of Sub-Contractors activities.

CCIC WLL

Yanbu AL BHR K.S.A.

PROJECT: YANPET EXPANSION

April 6, 2000 to April 5, 2002

CCIC WLL

Yanbu AL BHR K.S.A.

PROJECT: PTA IBN RUSH

May 15, 1997 to April 5, 2000

JOB DESCRIPTION / DUTIES & RESPONSIBILITIES

Cutting fit up assembling and installing pipes.

Repairing malfunctions.

Testing pipe system to ensure safety and functionality

Review isometric drawing to understand requirements.

Measure and cut pipes according to requirements

Arrange the isometric drawing.

Preparing of materials needed.

Check the location of the job.

Assemble the pipe section, fittings, and tubing using pipe clamps, bolts, screw, adjustable spanner and etc.

Provide support for any identified potential non-conformances or any work defects occurring systematically.

Daily coordination to the superior.

Ensure that the isometric drawing in latest revision issued with marked Approved for Construction (AFC).

Specify “Hold Point” and coordinates with the client representative for Approval.

Workmanship must meet the company quality standard.

Coordinate with the Production and Engineering Department for drawing of material discrepancies.

Knows and complies with all the company safety rules and regulations.

WORKING EXPERIENCE

LOCAL

Mechatrends Contractors Corporation

Amaya 1, Tanza, Cavite

PROJECT: Sunpower Philppines Manufacturing Limited

48.0 km Binan, Laguna

June 16, 2015 to January 15, 2016

JOB DESCRIPTION / DUTIES & RESPONSIBILITIES

Report directly to the QA/QC manager or any pertaining the project.

Supervise and direct quality control in project site.

Ensure that the approved quality system is effectively and efficiency implemented.

Checks of levelness, position, orientation, anchor bolts, conduits, etc. of tanks foundation.

Storages tank internal inspection and perform punch- listing operation.

Monitor and report on site quality controls performance.

Witness the test, controls and inspections, guarantee inspection status control for parts of the plant within his

area of responsibility

EEI Corporation

N0. 12, Manggahan Street, Bagumbayan, 1100 Quezon City

PROJECT: Phoenix Petroleum Phils, Inc- Calaca

Brgy. Salong, Calaca, Batangas

March 16, 2011 to July 15, 2011

JOB DESCRIPTION / DUTIES & RESPONSIBILITIES

Report directly to the QA/QC manager or any pertaining the project.

Supervise and direct quality control in project site.

Ensure that the approved quality system is effectively and efficiency implemented.

Checks of levelness, position, orientation, anchor bolts, conduits, etc. of tanks foundation.

Storages tank internal inspection and perform punch- listing operation.

Monitor and report on site quality controls performance.

Witness the test, controls and inspections, guarantee inspection status control for parts of the plant within his

area of responsibility.

PERSONAL BACKGROUND

Filipino citizen born on the day of 4rth day of January 1972, married, 5’4 in height, 120 lbs., Catholic, dark hair, dark eyes and fair complexion, highly motivated and goal oriented skilled in public relations, loyal dependence and willing to do whatever is needed to meet established goals, have a good sense of humor and personal dedication to procedure timely and cost effective results.

TRAINING SEMINARS:

Operator Training –Operation and Maintenance of Mechanical Equipment.

Fire Alarm, Audio/Video & Security System Operation.

Basic Operation and safety principles of radiography.

Auto Cad Operator Training MMG Learning Center.

Spool General Training –MMG Learning Center.

Total Quality Management-BSI Philippines.

National Institute of Occupational Safety and Health (NIOSH).

Hand Safety & Manual Handling CBT Course.

Hydrogen Sulphide Awareness CBT Course.

Emergency Response CBT Course.

Piping Inspector-Aramco Certified.

CERTIFICATION:

This is to certify that forgoing data are true and correct to the best of my knowledge and belief.

Arnold D. Mercado

EDUCATIONAL BACKGROUND

QC PIPING INSPECTOR

QC PIPING INSPECTOR

QC PIPING INSPECTOR

QC PIPING INSPECTOR

QC PIPING INSPECTOR

PIPING ENGINEER IV

PIPE FITTER

PIPE FITTER

QA/QC INSPECTOR

QA/QC INSPECTOR

PERSONAL INFORMATION



Contact this candidate