CV
Position
Field Services Supervisor
Name
Joe Apollo F. Tabla
Nationality
Filipino
Date of Birth & Age
Age
46
Marital Status & Number of Children
Married and 4 children
Total Years of Experience
15 years
Nearest International Airport
Manila
Contact Number
Email ID
Passport Number and Date of Expiration
Bahrain Driver license
+973-******** Bahrain
joeapollotabla@.com
P63333A6 / Exp -May 2023
740842285/ Exp-29/01/2023
CAREER OBJECTIVE:
To obtain a position that will enable me to use my strong skills and abilities, educational background to work well with people.
Qualifications & Experience Strong experience in Turbine Engines and its various components
14 Years’ Experience, Major Overhauling of Gas Turbine
GE, frame 5 twins’ shaft,6B,7EA,9E,9FA,9FB.
10-unit Major Overhauling,
14X Major Overhauling Siemens GT turbine V94.2 including Ansaldo machine,
3X Alstom 13E2 Gas turbine, MI SAPP SOHAR ALUMINUIM
2X Siemens Steam turbine ST900 Major Overhauling
Centrifugal Compressor AN 200 Oman LNG
2 BCL Compressor Oman LNG
3 MCL Compressor Oman LNG
2X Man Turbo Steam turbine and 2X Radial Compressor & Axial Compressor Major Overhauling.
Steam Turbine,Valve Overhauling and Pumps
Training and Certified and skilled
Computer Literate
Basic Auto Cad
MS Project 2013
Basic Primavera P6
Rigging and Slinging
Overhead Crane Operation
Hytorch MX3, MX5, MX,10
ITH Bolt Tensioning
Fitter Machining
Valve test Operation and Overhauling PSV & Shut off Valve (Certified By Bentil)
Computer Literate
Welding and Fabrication Gtaw And Smaw SS, Carbon, Inconel
1. Pumps:
Sulzer, Ebara, Flowserve
experience in maintenance in all types of pumps such as centrifugal, reciprocating & rotary pumps.
• Obtaining a complete check list of the dismantled equipment and keep a record of the same.
• Inspect the condition of rotating parts namely shaft, sleeve, impeller, oil deflectors, wearing’s,
bearings, coupling and stationary parts such as casing stuffing box, distance pieces and bearing housing.
• Renewal of mechanical seals replacement of rotor checking wearing and throat bushes, bearing clearances
• Maintaining the required Radial & Axial float in multistage pumps
• Checking the Stuffing box Squareness and concentricity using a dial gauge while pump assembly.
• Hydrotest of pumps to determine mechanical seal and casing leaks.
• Over hauling of reciprocating pump such as plunger pump & diaphragm pump including renewal of
plunger packing, oil seals, suction discharge valves checking & servicing.
Mechanical seal:
John crane, Flowserve & Burgmann.
• Assembling, reconditioning and replacing all type of Mechanical seals such as single double,
tandem and cartridge seals, having single, multi-spring and bellow type.
• Renewed seal faces (primary ring & mating ring) and maintained operating length lapping
seal faces to the required finish.
Centrifugal compressor:
GE Oil & Gas (AN 200,2 BCL803, 3MCL),
• Completely overhauled GE (MCL1402, BCL427)
• Inspection, Dismantling & Installation of Thrust bearings and Journal bearings (plain and tilting pads
types) with direct and pressurized lubrication systems.
• Locate position of rotor assembly and proper installation of gas seals or oil film seal.
• Respecting the Radial & minimum axial clearance between impellers and diaphragm and
delivery dimensions of volute.
Performing alignment between driver and driven units. Alignment:
• Rim and face method
• Reverse indicator method
• Laser method
Reciprocating compressor:
Ingersoll Rand,
• Inspection, Dismantling & Assembling of Coupling, fly wheel, crank shaft, connecting rod, cross head,
gudgeon pin, piston rod, piston and cylinder.
• Maintaining limited clearance of Main bearings, Big end and small end bearings with direct or pressurized lubrication systems.
• Refurbishment of suction & discharge valves, unloader & Renewal of cylinder liner
• Check and replace the piston rings, rider/guider rings, stuffing box packing & wiper rings
• Check and adjust the Cross-Head Shoe Clearance, TDC & BDC
• Respecting the minimum deflection on piston rods
• Performing alignment of Compressor with driver Equipment’s.
Steam turbine & Gas Turbine
GE Oil & Gas & Nuovo Pig none, GE Oil & Gas (Frame 5 Single and Twin shop) 6B,7EA,
• Completely overhauled Steam Turbine used for run Centrifugal Compressor.
• Inspection, Dismantling & Installation of Thrust bearings and Journal bearings (plain and tilting pads types) with direct and pressurized lubrication systems.
• Disassembling & Assembling of Rotor, Inner casing, stator blades, Oil and steam
labyrinth seals, Mechanical Trip & Governor (PGPL).
• Servicing & Reinstalling of Emergency stop valves & Regulation valves assembly.
• Respecting the minimum safety axial clearance between rotor and stator.
• Performing Cold & Hot alignment of Steam Turbine with driven Equipment’s.
• Replaced the Turbine Nozzles & Buckets.
Static Equipment’s:
• Maintenance jobs carried out in heat exchangers of fixed, floating and u tube type
which include activities right from blinding, bundle pulling, cleaning, testing, repair works
as per inspection.
• Maintenance jobs carried out in fin fan air coolers which include activities like
blinding, plugs removal tubes id cleaning, hydro testing activities etc.
• Maintenance jobs carried out in replacing existing tower internals as per requirement.
• Maintenance jobs carried out in absorber & vessels which include activities like
cleaning, catalyst renewal, Demister removal etc.,
• Maintenance jobs carried out in filters which include activities changing of
elements, cleaning, inspection clearance etc.,
Company:GE /BAKER HUGES ENERGY LLC OMAN
Position: Turbine Supervisor
Site Address: Oman LNG Sur, Oman
Employment Date: 26-Jan-2020 TO present
Maintenance of Train 1,2,3, GTG GasTurbine, Generator valve and Pump, Compressor,
Job Responsibilities: -
Assist in planning and execution of project plans at site.
Prepare and monitor work schedules and coordination with relevant stakeholders in ensuring projects is completed within timeline
Attend site meetings and site inspections
Perform regular projects reporting on site progress
Oversee site equipment delivery, installation and equipment testing & commissioning
Any ad hoc duties as assigned
Proactive in engaging customers on key issues and to provide the customer and company management team with progress updates till a satisfactory closure.
Provide prompt updates to customers on delivery and provisioning stages
coordinate meetings for all parties when necessary and follow through.
Maintain rapport and familiarity with customer and vendor personnel, as well as with relevant business practices, processes, and procedures.
Work closely with Service Delivery Team to improve day to day operational efficiencies, and continue to improve customer service experience and service delivery lead time.
Company: MASTECH TEACHNICAL SERVICES WLL.BAHRAIN
Position: Project Supervisor/GT / Steam Turbine/Compressor
Employment Date: 26-Dec-2017 TO 2020 present
knowledge of valve and Pump, Compressor, Gas turbine, Steam turbine, Generator
Under Contract with GE Oil & Gas
Assign in Oman LNG Train 1,2,3 Assign Technician, Helpers Inspectionof GE, FR-6B-7EA also in GTG Gas turbine Generator. C Major Inspection (MI) Hot Gas Path Inspection (HGPI) Combustion Inspection (CI), Inspection (HGPI), and Major Inspection (MI)., Liner Transition Piece Inspection (LTPI) Including Auxiliary,
Support the upfront pre-tender / tender phase by providing input such as lessons learnt, challenges, risks and/ or opportunities to the proposal/costing team.
Responsible for implementing client requirements and contractual obligations are
made known and understood by all personnel involved with the project execution
Produce project deliverables in a safe manner, to specifications and quality
requirements, on schedule and within budget
Responsible for leading a cross functional team (Planners, buyers, engineers,
manufacturing) and ensuring they can meet the obligations of the contract/project
Coordinate with various functional departments to support the project
Comprehends contractual conditions and specifications and looks for commercial and
technical cost savings.
Ensures resources are deployed where applicable.
Communicates with other managers to ensure accurate information is made available
at all times to facilitate effective decision-making.
Performs & Manages Risks: Identifies problem areas, evaluates and initiates corrective
action, monitors and reschedules the project schedule with respect of time and
required resources.
Maintains a record of all communications related to the project.
Work with Project Accountant to develop and present financial performance reports
and project P&L statements.
Monitors project performance against an agreed plan and budget and initiates
corrective action where appropriate to ensure projects are completed on time and
within budget.
Performs Management of Change: Identifies and records changes to the project scope
of supply and negotiates/document variation orders for customer driven changes and
advice all concerned of the impact on cost, manpower and schedule.
Creates a project schedule and maintains for the duration of the project
Maintains action items registers for the project
Advises plants on invoicing for milestone payments at attainment and maintains the
schedule for milestone payment invoicing.
Creates/Estimates revenue forecast documents for the duration of the project.
Provides internal project reporting by using monthly dashboards, and project
reviews as needed
Provides external project reporting as defined by the customer in project
specifications.
Completes all project closeout activities including evaluation of project performance,
documenting lessons learnt, archiving and close out report.
Company: NATIONAL MECHANICAL ENGINEERING SERVICES.OMAN
Position: Mechanical Field Services Supervisor
Office Address: Muscat Oman
Employment Date: 02-Oct-2010 TO 17- Dec-2017
Experience in, Siemens V94.2, V94.3 Siemens SST 900 Alstom GT13E2, Ansaldo V94.2Machine knowledge of valve and Pump, Compressor, Gas turbine, Steam turbine, Generator repair techniques.
Assignment:
Barka 1 Acwa Power Oman Ansaldo Machine V94.2 2x MI
Barka 1 Acwa Steam Turbine Generator Outage
Barka Power STOMO Oman Ansaldo machine v94.2 3x MI
Bakka Power STOMO Oman Siemens SST-900 2X MI Outage
Sohar 1 Power Plant Siemens V94.2 3x MI Unit 1,2,3 Outage
Sohar 2 Minor Inspection Siemens V94.3
Sohar Aluminum power Plant GT13E2 2X MI Outage
Oman Methanol Sohar ManTurbo Steam Turbine & Compressor 2X Major Outage
Qatar Gas LNG Plant. Train 3,5,7 GE Gas turbine MI Outage
Oman LNG Train 1,2,3 Frame 6B & Frame 7EA
Oman LNG GTG 1,3.5 Frame 6B
Company: GRANITE SERVICES INTERNATIONAL INC. Genaral electric Company USA.
Position: Mechanical Field Services
Office Address: Makati Phils.
Employment Date: 18-Sept-2008 to 28-Sept-2010
Perform: Duties and Hand on Experience GE Power & Oil and Gas
GE power Oil & Gas, Frame 9FA,7EA,6B, Frame 5 Single and Twin shop.
Compressor Completely overhauled GE (MCL1402, BCL427)
We conduct repair and maintenance of GE steam turbine, gas turbine and its turbine generator. There are three inspections in overhauling GE Turbines which is Combustion Can Inspection (CI), Hot Gas Path Inspection (HGPI), and Major Inspection (MI). Liner Transition Piece Inspection (LTPI).
ROLE:
• Inspection, Dismantling & Installation of Thrust bearings and Journal bearings
(plain and tilting pads types)
• Borescope Inspection
Combustion Inspection (CI)
Hot Gas Path Inspection (HGPI) Major Inspection -(MI)
Dismantle of nozzle and Replacement Install (1st,2nd,3rd)
Dismantle of shroud and Replacement Install (1st,2nd,3rd)
Assist Turbine bucket Technician Dismantle Install (1st,2nd,3rd)
Gear Box Overhauling -Backlash Clearance Check
Atomizing air Overhauling
Tour converter
Alignment Dial and Laser alignment
Water wash
Lube oil heat Exchanger Removal and oil replacement
Cooling water Fan Maintenance
Exhausts Repair Crack
Welding Work
Additional
Overhaul and assemble machine according to its field procedures. During overhauling, mark first the turbine parts or components if it is RHS, LHS, Top, Bottom, Forward Side or Aft Side for the easy way to identify which side you removed/install this turbine parts/components.
Follow safety procedures. Attend toolbox talk. Then, housekeeping before or after the work starts
Align and inspect machine using some needed tools.
Check measurements and clearances as found or as the required tolerances.
Involve in lifting/rigging activities.
Perform cleaning/inspecting of tools before or after use.
Conduct inventory of tools such as hand tools, power tools, pneumatic tools, electrical, hydraulic tools, precision tools and lifting tools. Checking also its valid certificate, calibration date and color code for the lifting gears.
This includes also the inventory of consumable materials used in the outage.
Company: DAEWOO ENGINERING SAKHALIN RUSSIA (Shell)
TRAIN 1 LNG PROJECT
Position: Mechanical Supervisor
Office Address: Korsakov Sakhalin Russia.
Employment Date: 16-Sept-2006 to 26-Dec-2007
Assign in LNG Train 1 as a lead fitter, Assign fitters and Welders and Helper as per schedule.
Hydrotest, Pipe installation, Modification, Lay-out, Reading Isometric, Modification work.
• Pipe system layout configuration
• Pipe size and length selection
• Brackets, clamps and welding equipment
• Ordering suitable pipes and materials
• Cracks and leaks repairing
• Cutting torch oxy and Plasma
Reading
Company: PHILIPPINES PHOSPHATE FERTILIZER
Position: Mechanical Foreman Maintenance
Office Address: Isabel Leyte, Philippines
Employment Date: 07-August-1998 to 2003
Ball mill
Reactor
Boiler
Valve
Pumps
Conveyor
Roller drum Repair and Adjustment
Stock SYLO
Phosphoric Acid
Urea
Experience in maintenance in all types of pumps such as centrifugal, reciprocating & rotary pumps, Shut off Valve, PRV Valve Repair Welding work.
Obtaining a complete check list of the dismantled equipment and keep a record of the same.
Inspect the condition of rotating parts namely shaft, sleeve, impeller, oil deflectors, wearing’s, bearings, coupling and stationary parts such as casing stuffing box, distance pieces and bearing housing and pedestal.
Renewal of mechanical seals replacement of rotor checking wearing and throat bushes, bearing clearances.
Maintaining the required Radial & Axial float in multistage pumps.
Checking the Stuffing box Squareness and concentricity using a dial gauge while pump assembly.
Hydrotest of pumps to determine mechanical seal and casing leaks.
Over hauling of reciprocating pump such as plunger pump & diaphragm pump including renewal of plunger packing, oil seals, suction discharge valves checking & servicing.
EDUCATIONAL BACKGROUND:
College: Amang Rodriguez University
Course: Bachelor of Science Industrial Engineering Technology
Year 1994 -98 Graduate Diploma
•