Personal Data
Name & Contact : Praveenkumar Chockalingam +91-979*******)
E-mail : adlfe1@r.postjobfree.com, Skype Id : praveenkumar_c
D.O.B & Civil status : 19 June 1984 & Married
Driving license : India & South Korea ( LMV & MCWG )
Designation : Structural Engineer-Design (Offshore, Marine, O&G, Repair)
Passport No. : Indian- Z1940285 valid 08-09-2023 Issue Place-Singapore
Bosiet &CDC : PALAU-P208564-valid 04-07-2023,BOSIET(until-2021),STCW
Address : 2G-blk4, Jain Sunderbans,Gurusamyroad,Nolambur,Chennai-95
Countries worked : India(4 yrs), Singapore (6 yrs), South Korea (2 yrs),Oman(1year)
Offshore Location : Africa -Cameroon (20D) & Indonesia (15 D)
Job summary
Making basic, detailed design for Hull-Structural & machinery outfitting of Jack up Rigs, OSV, PSV Tugboats
Repair & Retrofit -Making survey and reports, Preservation, Corrosion Prevention of marine assets & offshore structures
Codes & Standards : Norsok –R002, S-002(WEAL), ANSI, ASTM, ABS, DNV, SOLAS, IRS,CAP437,API
Key Qualifications : Senior Structural engineer 13+ years experience in Design of offshore Structures & Hull outfitting . Worked in various project like Jack-up rigs,PSV, MPSV, Tugboats & barge .Fully involved in detail engineering, basic design to develop the Profile Plans,3D modeling, volume, weight calculations. Making machinery arrangement drawings & equipment maintenance, handling steps
Besides carry out design work in the Design office for 9 years (structural & Mechanical)
I have involved in site supervision for 1 year for ducting HVAC & Accommodation outfitting
one year worked as senior engineer/manager for steel division for chemical Plant in Oman
worked in Semisubmersible Rig, Cargo Carrier, drilling barge, FPSO,FSU, Estimation of complete vessel structure and machinery Preservation (from 2017-Present 3 +years)
Done survey of Bulk carrier and making report, Estimation for repair works,
Done Preservation of Jack up rig at Cameroon-Africa
Done Preservation of Semi Submersible rig at Indonesia -PT karimon shipyard- Indonesia
Worked in Pad eye analysis for towing-pull and reinforcement check using Ansys-12 (Mech APDL)
Worked in mooring winches,block lifting,transportation arrangement drawings
Currently working on SHELL -Vito FPU project
Education :
2002-2005 Anna university, Sriram Engineering college,Chennai,India BE (Auto)- Ist Class-Full time
1999-2002 Government polytechnic,Tuticorin, India, Diploma Mechanical- Ist Class-HONS-Fulltime
1998-1999 S.A.V higher secondary school, Tuticorin, India, S.S.L.C- Ist Class-HONS-Fulltime
Certificates BOSIET -Basic Offshore Safety Induction And Induction Training
STCW : Elementary First aid (EFA), (PSSR) Personal Safety & Social Responsibilities (FPFF) Fire Prevention & Fire Fighting, (PST) Personal Survival Techniques
(STSDSD)Security Training for Sea Farers With Designated Security Duties Medical Fitness Certificate for seafarer(valid -09/07/2020),Yellow Fever Vaccinated
IT Software Autocad,Aveva Marine,Tribon-m3, MS-office, Naviswork,DAVIEW,(PDMS & Ansys12-beginner)
Languages English (Fluent),Tamil (Native), Hindi(Speak),German-A1-certified(Basic)
Work Experience ( 3 years +)
2017 (04 Dec) – Present Deva Management / Preservation Services Pte Ltd (India) (H.O-Singapore)
Senior Engineer Structural-( Design /Estimation / Survey-Repair & Reworks )
Projects Worked : Borr drilling-Balder Jack up rig Preservation on board-Africa (Cameroon)
Sea Drill -SEVAN Driller-Circular Semi Submersible Rig at (PT-Karimon Sembawang shipyard-Indonesia)
Making Design Drawings for conversion of project from oil tanker to FPSO
Making modification drawing and detailing for outfitting and reworks
Clash check using 3D modelling and making list of actions king Site survey of ships, making solution reports
Asset integrity management solution / Procedure for the O&G plants, offshore structures, Sailing ships
Making corrosion rate and Preservative estimation for the marine structures
Referring IADC equipment list with Preservation Planning and solution
Meeting with Clients recommending solution for corrosion Prevention in offshore structure
Making tendering or bidding works for shell - Brunei ware house & Petro net - India cross country Lines
Making preservation procedures, project reports and participation in technical discussion
Referring and understanding Preservatives' TDS and SDS documents and recommendation of solutions
Studying drawings, ship particulars and details making estimation of materials, manpower for quote
Done Preservation on board annular BOP, Rotary table, Top Drive, Iron roughneck, Drill pipe handler
Dolleys, HPU, Cranes, driller cabin, winches, Deadline anchor, BOP control & Accumulator, Drill line spooler, Derrick (finger board, monkey board arms),Casing Stabling basket, Drill Pipes Preservation, Riser pipe Preservation,FLNG -SS pipe Preservation, Engine Preservation, Cabin preservation, MUD Pump Preservation, Air compressor Preservation, hull tanks (fuel oil, BW,FW,BO), Pig Launchers, Pig receivers and system Preservation
Making IPPP-Preservation plan for documentation and execution planning, Making S- curve for the Project status, making Project report, Preservative additive compatibility QC report
Worked as a material controller for Projects, for Preservatives mixing, instructing, distributing to the technicians and conducting daily tool box meeting & daily safety briefing
Prepared and done PowerPoint presentation to the client for the scope of corrosion prevention
understanding SDS & TDS of various chemical properties and adopting it for improvement in Asset integrity
Equipments and Pressure vessel internal chemical cleaning and neutralizing
equipments and Piping system internal descaling, corrosion prevention
chemical cleaning of Water treatment and Desalination plants and chemical cleaning of pipe line
ship and rigs Potable water system internal system cleaning using bio degradable chemicals and arresting brown water issue and neutralizing the system, utility system preservation(fire water system,HVAC, etc)
disinfecting the accommodation and living quarters using chemicals
corrosion prevention of hull tanks closed systems, chemical tanks and equipments
rust removal using chemicals, rust conversion of deck items using chemicals
Restoration, represervation, precommisioning, commission of O&G equipments, offshore structures
Dealing with various equipments-Installation -Precommisioning-Transportation-Commissioning
Pumps(SW,DO,etc)
Estimation of Projects (For Repair and Reworks)
Jack up rigs (MODU) : Grupo-R-Cantarell,Statoil, Borr -Grid,Gunnlod,Valaris-JU115,JU-104
Semi Submersible rig : Atlantic star (pentagonal rig),Atwood -Osprey MS-1,SeaDrill -West Sirius,
Ensco8504 & 5004,Centenario
Semi submersible Barge : POSH-PG1 & PG2,ESCA-Barge
Bulk carrier : BW-Empress, Confident, wilhelmson-Goldenscape,Golden Swift,TT-Salvage
FPSO : SBM-Liza-1 & 2,Petrobras-MODEC -MV-31-Topside piping, Schlumberger-SRU,CIP,UR modules,Golar hille-Episayo-FLNG carrier
Tender Barge : POSH-Natuna & Skimmer, Arcadia (DP3) Kimheng : Noble Dave Beard
Drilling Barge : Bay water drilling -ST Elaine, Sapura : T9,T10 -Drilling Barge
Drill ship : Bumi sendayan -Sonangol Quenquela, Keppel : Can do
Chemical carrier : Starlight, Crude oil carrier :Ariake,Car carrier : Straights challenger, Live Stock carrier : Global radiance
PSV/AHTS : POSH mallard,Jaegar,Hermosa,Winposh Rampart Sarku Clementine,
MEO-Endurance,Resolution,Galaxy,MC-1,Britoil :AHT 62,66,81,120,121 MMA offshore-Privileage, ADK-Orchid,Swire Pacific -Hornbill,Hawk,Finder
Drill Pipe : IronGate, Store : tangguh Vessel,Chevron-Fire line,Keppel :Lube oil compressor
Tanks/Pressure vessel : Corrodex,JEL -Defoamer, Repsol :Turbo chargers, Desalination unit: Pectec dubai
Ware house : COIM Group,PASAR,Nathalin shipping, MEO-Delta shipyard-winches,wire rope
Shell :whale-cable ladder, Rotary-Fire line, NOV-Pressure vessel
Work Experience-1 (8 months)
2017(April) –2017(Nov) ISCEC - Oman- Muscat & Salalah (Chemical plant Steel structures)
Senior Design engineer/ Manager (Steel Division & Shop Fabrication)
Projects Worked (8 months): Blue line chemical factory (Salalah-Oman)
Steel fabrication : Controller and in charge for the steel design, Procurement,installation & Erection
Making Factory shed with claddings, profile & PU foam sheets,plant machinery installation
Calculating the steel,equipment requirement & Procurement from suppliers
Making project plans and controlling fabrication Process at site
Dealing with clients, consultants,suppliers and approval authorities
Making site survey and Technical Bidding / Tendering for new projects quotes
Managing & Instructing Engineers, Foreman, work force at site
Erection of Steel column, rafts with alignment at site
Work Experience-2 (1 year 9 months)
2014(Jan) – 2015(Sep) Daewoo Shipbuilding & Marine Engineering- South Korea (Simha -Pay role)
Senior Engineer (Hull-Structural outfitting Design) (Geoje-Yard) (E7 -visa)
Projects Worked ( 1 yr. 10): Maersk Drilling Jack-up rig (200ft) ( ABS, Norsok-standards ) onsite work
Onsite in charge for the Jacking,Fixation system,helideck with Equipment & outfitting structure at yard Fabrication
Dealing with vendors for making purchase orders(POS)
Making RFQ (Request for quotation) to receive quotation from vendors
In charge for 3DModelling design review with clash check & updating drawings
Design clarification and Meetings with Owner(Maersk drilling)
Making list for the equipment installed with RFID, Tagging& physical tagging
Meeting and clarification with the vendor for Equipment Specification meets
Site visit and clarification for the fabrication at factory and DSME yard-Geoje -Korea
Jacking,Fixation system & Helideck :
Making Dismounting procedure jacking unit with Norsok –R002/S001 requirements
Making Handling & installation instructions jacking unit on jacking structure
Making hardox plate installation drawing between leg rack and leg guide
Outfitting drawings for the jacking system (RPD-rack phase difference, height detectors)
Making trolley beam on jack structure for jacking unit removal from jack case
Making instruction for the design team & subcontractors for fabrication
Making fixation unit installation instruction& maintenance Procedures
Fixation motor dismounting and handling instruction using davits & chain blocks
Making Outfitting drawings for fixation system (Service platforms, Sensor supports)
Checking vendors drawing as per Cap437 & Norsok requirement
Follow up with vendor for the detailed design and 3D modeling of the helideck
Making Cargo elevator installation,Maintenance Procedure
Photocell allocation on the helideck, clash check of pipe lines from helideck
verifying preservation of the builder furnished items from Vendor supply
Work Experience-3 ( 3 months)
2013(Aug) – 2013(October) Aluminium offshore pte ltd (Singapore-international business park)
Senior Structural Design Engineer (Aluminium helipad)-(Worked under EP)
Design & Engineering (3 months)
Design of truss support structure for helideck structure of offshore rigs
Drawing bridges structure with seismic connection
Making Detail drawings for helideck structures
Making DIFFS system and deck gutter piping drawing
Making Truss and girder support layout
Making bill of material for procurement
Guiding draughtsman team
Work Experience-4 (5 years 10 months)
2007(Sep) – 2013(July) PPL shipyard Private ltd (Singapore) ISO 9001:2000
Structural Design Engineer-SembCorp Marine group (worked under EP)
Projects worked ( 5 yrs. 10 months): Jack up rigs
2012 -- 2013 Oro Negro 2 - jack-up rigs (pacific class 400)
2010 – 2012 Atwood oceanic’s ltd 3 - jack-up rigs (pacific class 400)
2009 – 2010 Vietsov Petro Ltd 1 - jack-up rig (pacific class 400)
2008 – 2009 Sea drill jack-ups ltd 2 - jack-up rigs(pacific class 375)
2007 – 2008 Vantage drilling company 1 - jack-up rig (pacific class 375)
DESIGN & ENGINEERING (Beside Pandan YARD - Singapore) :
Coordinating with project department in comply with project plan
Done drill floor deck equipment foundation
Checking vendor documents meets with owner requirement specification
Making 3D modeling and 2D drafting using Tribon-m3 & AutoCAD
Done BOP service platform and lifting drawings
Pad eye design and strength check using Ansys
Making Material take off list (MTO)
Done helideck structure and support drawings
Making Drill floor structure,Cantilever structure drawings
Making block lifting drawings, equipment lifting pad eye drawings
Making scantling plans, deck plans and structural detail drawings
Done trolley beam arrangement, walkway & platform drawings
Making living quarters structural drawings and sectional drawings
Done Pipe rack deck drawings and drill pipe lifting winch foundation drawings
Done wind wall shed structures drawings, tank structures with pipe fittings
Making ducting and cable penetration structure drawings
Making booby hatch and loose tanks structures & mud pit drawings
Making block division and docking plan drawings
Done Rescue boat / life boat support & platform drawings
Done cathodic protection plan with anodic calculation
Making bill of material for procurement & Guiding draughtsman team
Work Experience-5 ( 1 year 8 months)
2005(Dec) – 2007(Aug) Tebma shipyards ltd (India) (Chennai,Cochin & Malpe)
Design -Junior engineer (hull-Structural outfitting) Team Lead(3)
Projects worked (1 year 8 months):
2007(Feb)–2007(Aug) Cochin port trust, 100BP tractor tug (IRS class)
2005(Dec)– 2007(Jan) Rolls-Royce Marine, PSV UT 755L (DNV class)- 2 projects
Design & Engineering ( Chennai)
HVAC duct routing using P&I.D, Pipe line routing in accommodation in ships
Making Foundation drawing for main engine, windlass & deck machineries
Making insulation plan,Fire control plans,FFA,LSA using SOLAS regulations
Making composite plans for living quarters & Detailed outfitting fabrication drawings
Making project plan,Coordinating with ERP planning Team,& Excel calculation using rule books
Making door plan, hatches,windows scuttle,manhole drawings
Making AHU, Fan,blowers Foundations & Duct supports
Production Site at yard (cochin shipyard ltd Premises) : Cochin & Malpe (Tebma yard)
Erection of HVAC fan, AHU, duct fittings & Routings
Done cold room S.S Paneling with Staco-korea technicians
Fixing of insulation with correct density & grade as per insulation plan
Paneling works,door fixing works,LSA &FFA fittings in ships
Done floating floor with Sikacufadon Norway technicians
Material estimation, Material handling for installation on board ship
Daily work allotment for fitters and supervisors
Placing toilet modules on location, done conventional Toilet Module with STACO Korea
wheelhouse(octagon) paneling, windows Glass fit up & raised floor structure
Done Grey, black & cold waterlines in Living Quarter with blucher vacuum pipes
Done fix ups on galley-canopy hood, fire damper, pedestals, exhaust ducts
Place:
Chennai/ India C. Praveenkumar