Post Job Free

Resume

Sign in

Engineer Customer

Location:
Jamshedpur, Jharkhand, India
Salary:
12 Lakhs
Posted:
April 05, 2021

Contact this candidate

Resume:

Kurasala Chandrashekhar Venugopal

Site Planner & Import Buyer

Phone No: 962*******

Email-id: adlf17@r.postjobfree.com

PROFESSIONAL SUMMARY

Site Planner with 8 years 8 Months of Experience in Automotive & Cable Industry. Highly self- motivated with a strong sense of initiative and the ability to anticipate needs in challenging environments and completing tasks

WORK EXPERIENCE:

Organization : ZF WABCO INDIA LTD- Jamshedpur, Jharkhand (Jan,2019 to Present) Designation : Production Planning & Import Buyer- Sr. Engineer

• Engaged in both long and short-term planning, from January-2019 to till date, strategizing for on-time, high- quality deliverables.

• Planning of RM as per customer requirement for value stream VDC (Vehicle dynamic control) & C&B (Clutch

& Brakes).

• Prepared and analyzed schedules working closely with the customer service department to maintain high customer satisfaction by keeping the representatives notified of any service issues.

• Evaluated the capacity for all equipment to determine material priorities, personal requirements and outsourcing if needed.

• Ordered and maintained inventory levels for raw materials and supplies to meet production demands.

• Selected by management to participate in the implementation of SAP into the facility, becoming the primary trainer in the production planning department.

• Designed and implemented monthly metrics, tracking, and process improvements resulting in improved lead times and increased network capacity.

• Managed leading vendor's ship schedule in alignment with customer's yearly budget.

• Developed reporting that was shared company-wide: regularly presented material at executive level meetings.

• Reduced warehouse capacity while increasing shipping efficiency.

• Formulated weekly ship schedules with vendors. Facilitated weekly conference calls to discuss shipping schedules, service levels, rate of production, invoice approval and any gating issues.

• Managed leading vendor's ship schedule in alignment with customer's yearly budget. Organization : HTL LTD. – Chennai, Tamil Nadu (Feb,2018 to Jan,2019) Designation : Production Planning – Deputy Manager

• Engaged in both long and short-term project planning, from Mar-2018 to Jan 2019, strategizing for on-time, high-quality deliverables.

• Handling of Optical fiber cable planning start to end process.

• Planning of RM requirement as per customer requirement & Liquidation of non-moving wip and finish goods.

• Shop floor material consumption analysis on daily basis.

• SAP implementation of PP & PPDS module.

• Monthly planning as per customer requirement and process capacities.

• Raw material scheduling for just in time supply thereby Improving delivery rating index .

• Identify standard & nonstandard raw materials and their lead times.

• Release monthly raw material requirement and scheduling it as per lead time.

• Understand monthly preventive maintenance schedule of critical & bottle neck machines.

• Release monthly production plan based on customer committed delivery dates.

• Daily recording and monitoring of production status item wise and customer wise.

• Highlight constraints and resolve through cross functional team efforts. Organization : KEC INTERNATIONAL LTD. (RPG CABLES)– Vadodara (Feb,2017 to Feb,2018) Designation : Production Planning – Engineer

• KEC INTL LTD (RPG CABLES) is a renowned organization in the field of Cables.

• KEC is very well known for its quality & has manufactured cables ranging from 3.3 KV, 600 V & 1100V.

• Handling of high voltage & extra high voltage cable planning start to end process.

• Planning of RM requirement as per customer requirement.

• Shop floor material consumption analysis on daily basis.

• Core team member for SAP implementation at KEC Aug-17 to Feb-18 for Production planning detailed scheduling.

• Well versed with the usage of ASAP methodology for the structured and systematic SAP project implementation.

• Worked on MTS (Make-to-Stock), MTO (Make-to-Order), Make-to-Order for Configurable Material, Stock Requirement/ MRP Lists, variant configuration, super BOMs.

• Integrated PP, PP-PI with MM in goods movement, back flushing, automatic goods receipt, STO process, reservations, production order, planning, purchase requisition, MRP process, sub-contracting, external operations, and operational outsourcing.

• Created and configured the cost centers, mapping with work centers, carried out product costing for different materials including semi-finished, finished, co-products etc.

• Knowledge in batch management, batch classification and back flush to issue materials.

• Configuration of PP-MRP processes, production orders, process orders, repetitive manufacturing, classification, batch management, capacity planning, demand management.

• Core team member of the project from start till end.

• Setup implemented of PP & PPDS Module for cable business. Organization : KEC INTERNATIONAL LTD. (RPG CABLES)– Mysore (July,2012 to Feb,2017) Designation : Planning – Engineer

• KEC INTL LTD (RPG CABLES) is a renowned organization in the field of Cables.

• Campus placed and joined as a GET in cables division for Mysore location.

• KEC cables set up its manufacturing facilities in Vadodara & Mysore.

• KEC is very well known for its quality & has manufactured cables ranging from 3.3 KV, 600 V & 1100V.

• Planning of RM requirement as per customer requirement for LT and Instrumentation cables.

• KEC INTL LTD (RPG CABLES) is a renowned organization in the field of Cables.

• Campus placed and joined as a GET in cables division for Mysore location.

• KEC cables set up its manufacturing facilities in Vadodara & Mysore.

• KEC is very well known for its quality & has manufactured cables ranging from 3.3 KV, 600 V & 1100V.

• Planning of RM requirement as per customer requirement for LT and Instrumentation cables. JOB PROFILE:

• Monthly planning as per customer requirement and process capacities.

• Raw material scheduling for just in time supply thereby Improving delivery rating index.

• liquidation of nonmoving wip and finish goods

• Order Booking for the Manufacturing as per the customer requirement.

• Manufacturing as per IS, IEC, BS & different state electricity board Standards.

• Analyze machine capacity process wise. Identify bottle neck machines.

• Identify standard & nonstandard raw materials and their lead times.

• Release monthly raw material requirement and scheduling it as per lead time.

• Understand monthly preventive maintenance schedule of critical & bottle neck machines.

• Release monthly production plan based on customer committed delivery dates.

• Daily recording and monitoring of production status item wise and customer wise.

• Highlight constraints and resolve through cross functional team efforts.

• On time inspection scheduling or release test reports for timely dispatch clearance.

• Sale order booking (SO), MRP (Material resource Planning), Work order processing (WO)

• Providing technical support to sales & marketing team against their raised quarries.

• Performed research and designed various manufacturing processes that helped in reducing cost and time.

• Performed product analysis for cost reduction and improved efficiency.

• Developed and maintained documentation for entire production activities. PROFESSIONAL STRENGTHS:

• Microsoft Excel / PPT/ Word/ Outlook

• SAP H4 HANA / JD EDWARDS / 5S & KAIZEN

• Target oriented, result achiever and self-motivated

• Excellent communication, interpersonal, and facilitation skills.

• Quick Learner with strong analytical skills

• Ability to work independently and can handle multiple works by prioritizing tasks ACADEMIC QUALIFICATION:

• Electrical & Electronics Engineering, Chidambaram Tamil Nadu (BE) : 2008-2012 – 8.12 CGPA.

• HSC Narayan Junior college Shanty Nagar, Visakhapatnam (12th) : 2006-2008 – 89.5%

• SSC Ramakrishna School Nad Kotha Road, Visakhapatnam (10th) : 2005-2006 – 82.6% FINAL YEAR PROJECT WORK: Sun tracking solar cell.

• Completed Project on Sun tracking solar cell in Final year of Engineering (2012).

• This Project is about the Photovoltaic cell, Solar Panels, Energy storage capacity in the panels.

• It has been achieved with the help of Light intensity sensors.

• The sensors are fixed into the model in an elliptical path. Depending on the sunlight the sensors output. PERSONAL DETAILS:

• Date of Birth: 25/07/1989

• Languages known English, Hindi and Telugu.

• Permanent Address: J/10 Nirmal Nagar Hume Pipe, Sakchi, Jamshedpur. Jharkhand Pin-831001

• Marital Status: Married.

I declare that all the details furnished above are true to the best of my knowledge. Date: 06.03.2020 Place: Jamshedpur, Jharkhand.



Contact this candidate