Post Job Free

Resume

Sign in

Maintenance Plant

Location:
Guanajuato, Mexico
Salary:
30
Posted:
April 01, 2021

Contact this candidate

Resume:

Jazmines ***

Fractionation Meadows the Rosary

San Jose Iturbide Guanajuato

Zip code 37980

Phone cel. 419-***-****

errands 419*******

Email

adlc1j@r.postjobfree.com

Joaquin Mejía Vazquez

Personal information

Marital status: Married

Nationality: Mexican

Age: 47

Date of birth 26 October 1973

RFC MEVJ731026 4AA

CURP MEVJ731026HGTJZQ08

NSS 1-292-***-****

Current passport

Education

Sep1990 a June 1993 Sub-professional school March 18 Industrial instrumentalist technician

Certificate of industrial instrument technician

Professional

experience

October 2020 to date WAUKESHA Metal Products

Maintenance to hydraulic and pneumatic dams from 100 to 800 tons repairs of chutch and brakes, coe unbreakers, crushers, welding lines maintenance to general services.

November 2019 to September 2020 WIESAUPLAST

Maintenance to injection machines ENGEL cc100 cc200 cc300 Haitian injectors, 3-axis robot wittman dryers koch loaders with koch cleaning sweep and corrective wittman of preventive shift to corrective and preventive VOGUE compressors in welding area plastic bielomatik machines and inomatic electrical installations in general

April 2017 to October 2019 MTW (Merit Technologies Wordwide) Company dedicated to hot stamping (HOT STAMPING),and spot welding, Turn- based mechanic problems related to heating furnaces, CMT stampers, Mycrodine Hydraulic presses basic settings of ABB robots, SPOT welding lines dimensional adjustments so that the part complies with the SPC of the customer GM clinching machines and general services. Support in press installation Mycrodine movement of machines electrical and pneumatic installations, pvc, June 2016 to April 2017 WELDING AND COATING DE MEXICO Company dedicated to ECOAT painting, powder painting, zinc, are addressed problems related to gas burners, paint curing furnace problems in washing tubs and watering and painting problems in line of zinc transporters hydraulic problems. Dec 2010 June 2016 VRK Automotive (management services of auto parts) Shift mechanics are performed preventive and corrective maintenance to AIDA, BLOW, CLEARING and NIAGARA presses from 300 to 1600 tons. Problems with straighteners and sheet dembobiners, scrap conveyor structure manufacturing, MIG and TIG weldingapplication, electrical installations and all shift problems in the press area, travel crane repairs, E-coat paint line maintenance, Basicadjustments and maintenance to HMS transfer systems. movement of machines and production equipment installation of new equipment. February 2010 Plastics Technology from Mexico2005 a 5-week training at the JM Manufacturing plant in Fontana California for plant start-up in San Jose Iturbide.

Istalacion of extruder machines and lines for pvc manufacturing. Production supervisor in the manufacture of PVC pipe, english hydraulics, metric sewerage, metric hydraulic, standard sanitary and conduit.

Supervisor of the tooling area responsible for changing molds, peripheral equipment start manufacturing lines as well as parameter adjustments to meet quality specifications, preventive maintenance to molds, meet specifications of alcantarilldos, hydraulic sanitary and conduit's products. Preventive mold maintenance, Maintenance to Extruders B-90 and B-130, Handling of 10 tons crane. Equipment or Extruders that are handled NANYA, AMERICAN MAPLAN,

(Oil cooling and water cooling extruders). NANYA and AMERICAN MAPLAN molds, OTHER ROLLER PAL EQUIPMENT, UNITED MACHINE, Development of new products.

July 12, 3 January 2005 Barey Company2004 a

Work of external supplier at the Valeo Sylvania Lighting plant in Querétaro Park. Plant in charge of the manufacture of headlights and skulls for cars and vans. Maintenance to glue systems, adjustment of routines and speeds to Robots brand ABB and Motoman, turn maintenance technician in the area of assembly corrective and preventive maintenance of assembly lines, as well as all shift maintenance work. Polypropylene injectors for car headlights. August 15, 2000 to January 12, 2004 Flex N Gate, Mexico San Jose Iturbide Guanajuato

Maintenance team leader

Training and training for plant start-up

Assembly and adjustment of mechanical presses between 200 tons and 1600 tons) Installing manual welders with MIG process

Support for installation of robots fanuc s 430 Si, robot arm mate 100 i, robot 2000 i, brand Fanuc Robotics. (1-week Detroit Michigancourse) Commissioning of Hydraulic Press Units Shuller, Danly, Niagara, Clearing and Bliss. (Visit to the Canada plant to check presses that were brought to Mexico for installation)

Project and assembly of assembly lines for defenses of Chyrler, General Motors and Nissan,

Collection of information for the preventive maintenance system of the plant. Electrical welding in general, rack manufacturing, pneumatic gun repair, equipment movement in the plant.

Implementation and improvements of the preventive maintenance system of the plant.

Maintenance and handling of 20 and 40 ton Munck travel cranes. Preventive and corrective maintenance to plant service teams. Handling Excel, Word computer packages.

General maintenance E-COAT paint line

Languages English 50 %

Courses received

First aid and fire

Forklift operation (license until 2002)

Basic principles of lubrication

Power transmission bands

Statistical process control

Cooling principles

Spun bond III machine operation

Basic course of plc siemens slc 5

Electric Welding Course

Situational leadership

Cause-to-solve problem

Continuous Improvement (Antares)

Reduced maintenance costs

Introduction to six sigma

PREVENTIVE maintenance MP2

Wastewater treatment plant

English course

Orientation and training program 96 hrs.

5's 14hrs course

Basic course for mechanical presses shuller 20 hrs. English courses 34 hrs.

Fundamentals of resistance welding

Munck travel crane operation seminar

QS 9000 talk element 9.0

First Aid

Travel crane operator course

Hydraulic maintenance and fault repair 20hrs

Resistance welding

Centralized lubrication theory and operation

Pneumatic and electro pneumatic basic 28 hrs.

Advanced industrial hydraulics 24 hrs.

S 430i assemble and disassemble the S 430i robot in Detroit Michigan 32 hrs. at the robotic fanuc plant.

Motion transmission and motor alignment.

Basic electricity course



Contact this candidate