Robert Sola Deinla

PERSONAL PARTICULARS:

Date of Birth April 26, 1962

Nationality Filipino

Singapore PR S2727007G

EDUCATIONAL ATTAINMENT:

1980 - 1985 Bachelor of Science in Electrical Engineering Technological Institute of the Philippines

(Manila, Philippines)

August 1986 Career service professional examination given by the Civil Service Commission

(Manila, Philippines)

October 1987 Licensure examination for Registered Electrical Engineers given by the Professional Regulation Commission (Manila, Philippines) EXTRA CURRICULAR ACTIVITIES:

Member Institute of Integrated Electrical Engineers of the Philippines Inc Training Courses Quality Assurance Procedures, Standard & Codes of Guangdong Nuclear Power Station provided by FRAMATOME-SPIE BATIGNOLLES QA DEPARTMENT Radiation Protection Level - II, Class – A - Guangdong Nuclear Power Station, Daya bay, People‘s Republic of China

Hands-on training on PR1MAVERA window version 3.1 and P6 Safety Training for Certified Workers Working in Confined Spaces provided by The Hong Kong Safety Training Association.

SKILLS and INTEREST:

Familiar with the use and operation of personal computer, planning and scheduling utilizing PRIMAVERA window version 3.1 and P6, ARTEMIS 7000 and MS PROJECT, plus various application such as MS WORD, MS EXCEL and MS POWER POINT.

BRIEF SUMMARY OF WORK EXPERIENCE:

As a Planning Manager, I had more than 23 years of professional experience in major construction projects and good knowledge of construction methodologies planning and programming, cost control, and design and materials coordination for major construction projects throughout Asia Pacific such as the 7.5km deep excavation and hard rock tunneling, grouting or similar once in Hongkong, the Marina Bay Sands Integrated Resort in Singapore, Venetian at Cotai Strip Parcel 5 and 6 in Macau, 88 Storey Petronas Twin Tower in Kuala Lumpur, Malaysia, The 30 Storey New World Hotel in Manila, Philippines. The 10,000 m3/day Desalination Plant, Clean-room Fit-up and Hook up, MRT Northeast line and the 49km, 7.5m diameter and 50m depth Deep Tunnel Sewerage System project in Singapore using Tunnel Boring Machine. I was also involved in the construction of Open and Combined Cycle Power Plants in Vietnam, Thailand and Australia, the twin pressurized water reactor nuclear power station in China. I utilize scheduling software including Primavera Project Planner V3.1, and P6 and Microsoft Project, my knowledge of construction methodology allows me for long range forecasting.

PROFESSIONAL HIGHLIGHTS (PRESENT - PAST):

Inclusive date : January 2013 – October 2013

Position : Planning Manager

Company : Laing O‘Rourke Construction (Hong Kong) Ltd. Project : Express Railway Link West Kowloon Terminus (XRL 810B) – Hong Kong Page 2 of 6

Duties as follows:

Establish and define any job oriented project control procedures and identify the level of resources required to operate them. Develop in conjunction with the Project Manager and Client a suitable Work Breakdown Structure for the project. Establish and agree the level and frequency of reporting required by the project and ensure that all cost, planning and document control reports are prepared and issued in accordance with the Project Coordination Procedure. Prepare and communicate cost and schedule baselines and ensure control mechanisms are in place to monitor performance. Review overall project status with the Project Control team and Project Management and recommend corrective action where necessary. Liaise with other Departments at all meetings relevant to project operations and ensure that the time and cost plans are updated to reflect latest information. Inclusive date : December 2010 – May 2012

Position : Planning Manager

Company : Leighton Contractors (Asia) Ltd.

Project : 7.5km Tunneling - Harbour Area Treatment Scheme Stage 2A - Hongkong Duties as follows:

Responsible for the preparation and development of detailed design, construction plans and programmes. Review programmes and monitor progress against programme milestones, as well as formulate delay recovery actions as necessary. Prepare regular progress reports with analyses and recommendations to address programming issues to ensure timely project completion.

Inclusive date : June 2010 – November 2010

Position : Senior Planning Engineer

Company : Hsin Chong Engineering (Macau) Ltd.

Project : Sands at Cotai Strip - Parcel 5 and 6 (Resumption) Duties as follows:

Develop the most appropriate method and sequence of construction operations, in conjunction with the Package Manager and Senior Project Manager. Plan and oversee the entire programme of work and anticipate a contract's demands in terms of Labor, Materials, Equipments and Technical challenges. As well as ensuring that construction is completed on schedule and safely to a high technical standard, and also responsible for specifying the timing of the contracts.

Inclusive date : February 2009 – May 2010

Position : Senior Planning Engineer

Company : Marina Bay Sands Pte. Ltd.

Project : Marina Bay Sands Integrated Resort - Singapore Duties as follows:

Responsible in monitoring, reviewing and presenting Project Planning and scheduling functions, which include schedule development, schedule analysis with demonstrated skill in establishing criteria, planning and supervising project scheduling activities. Inclusive date : January 2008 – November 2008

Position : Senior Planning Engineer

Company : Hsin Chong Engineering (Macau) Ltd.

Project : The Venetian at Cotai Strip, Macau

: Parcel 5 and 6 St. Regis Hotel and Serviced Apartment Duties as follows:

Page 3 of 6

Develop the most appropriate method and sequence of construction operations, in conjunction with the Package Manager and Senior Project Manager. Plan and oversee the entire programme of work and anticipate a contract's demands in terms of Labor, Materials, Equipments and Technical challenges. As well as ensuring that construction is completed on schedule and safely to a high technical standard, and also responsible for specifying the timing of the contracts.

Inclusive date : August 2002 – September 2007

Position : Project Controls Manager

Company : CH2M HILL (Singapore) Pte Ltd

Project : Power Seraya Desalination Plant – Singapore

: Seagate W2 (Clean-room fit-up and hook up) – Singapore

: 7.5m dia. Deep Tunnel Sewerage System (DTSS) – Singapore Duties as follows:

Prepare monthly progress report to the client. Duties include maintaining baselines and schedules and facilitating operation of an earned value performance measurement system. Develop, maintain and status baselines in project control package and provide analysis of performance metrics.

Inclusive date : August 2001 – April 2002

Position : Planning and Scheduling Engineer

Company : AMEC (Singapore) Pte. Ltd.

Project : Mass Railways Transit - Northeast line C775 – Singapore Duties as Follows:

Monitor the project forecast and progress by updating the schedule through weekly meetings with the Sector Managers and Engineers.

Update outstanding work list and prepare four-week look-ahead schedule. Develop and maintain detailed critical path network using primavera project planner and Microsoft projects.

Prepare monthly progress report and payment application. Inclusive date : December 1999 – May 2001

Position : Planning and Scheduling Engineer

Company : M + W – Zander (Singapore) Pte. Ltd.

Project : Wafer Fab (Systems on Silicon Manufacturing Company – Singapore)

: Wafer Fab (AMK - 8 STMicroelectronics – Singapore) Duties as Follows:

Provide planning and scheduling support to project manager. Duties include maintaining baselines and schedules and facilitating operation of an earned value performance measurement system.

Develop, maintain and status baselines in project control package and provide analysis of performance metrics.

Develop and maintain detailed critical path network using primavera project planner and Microsoft projects.

Inclusive Dates : October 1996 – November 1999

Position : Planning and Scheduling Engineer

Company : Siemens Power Generation (Asia Pacific) Sdn. Bhd. Project : 173Mw Combined Cycle Power Plant (Amata EGCO Bangpakong, Thailand)

: 159Mw Open Cycle Power Plant (Transfield Townsville Power Plant, Australia)

: 145Mw Open Cycle Power Plant (Phu my 2.1 extension, Vietnam) Page 4 of 6

Duties as Follows:

Provide planning and scheduling support to the project team. Prepare and maintain detailed levels schedule and manpower utilization plans. Work with other group to integrate inters discipline schedule requirements and established logical works sequences. Prepares schedule manpower and quantity progress and performance report. Implement the schedules in the project-starting phase by organizing weekly meeting with the team leaders for the project activity list.

Monitor the project progress by updating the schedule through monthly meetings with the team leaders and collecting information from the team leaders, client and site management on a weekly basis.

Compile and prepare schedules for the monthly progress report for the clients with support of project team leaders and project administrator. Prepare the delivery schedule for the shipment executive in accordance with overall project schedule.

Inclusive Dates : May 1993 - September 1996

Position : Planning and Scheduling Engineer

Company : Tyco Engineering and Construction (Malaysia) Sdn. Bhd. Project : Kuala Lumpur City Centre

District Cooling Centre: (General Contractor)

Petronas Tower - 1 & 2: (Fire Alarm System)

Retail Podium: (Electrical, Mechanical & Fire Alarms) Tunnel: (Fire Alarm System)

Duties as Follows:

Responsible for the planning and scheduling aspects of Civil, Electrical, Mechanical and Fire Alarms systems for the KLCC project. Responsible for developing programmes to ensure that various packages are scheduled to support the achievement of the overall project schedule. This includes defining activity coding structures, predecessors/successors relationship and resource/cost allocation.

Review and advice on the acceptability of contractors detailed programme submission, monitor and report progress and provide programming support to construction team. Attend coordination meeting if requested by the project manager and provide information about the status of the project. Monitor whether it is on time or delayed and identify certain areas that cause the delay.

Submit monthly status of the project base on the actual information received from the field engineers.

Inclusive dates : April 1992 - April 1993

Position : Design Engineer

Company : Framatome - Spie Batignolles Joint Venture Project : Guangdong Nuclear Power Station (Nuclear Island Erection Contract) Location : Daya Bay, People‘s Republic of China

Duties as Follows:

Responsible for the field detailed design and modification of main and local cable tray as well as the connecting diagram of electrical cabinet switchboard, boxes, etc. and engineering activities and management of technical document received from head office or sub-contractor.

Treating AWN (Additional Work Notification), DCR (Design Change Request) and CRF

(Request For Clarification) issued by the client GNPJVC (Guangdong Nuclear Power Station Joint Venture Company) concerning problem arising from installation of cable tray and support, cable routing and connecting and electrical equipment installation by issuing FCR (Field Change Request) for the modification of the design. This includes site inspection before making recommendations for modification. Page 5 of 6

Inclusive dates : January 1991 - March 1992

Position : Material Coordination Engineer

Company : Framatome - Spie Batignolles JV

Project : Guangdong Nuclear Power Station (Nuclear Island Erection Contract) Daya Bay, People‘s Republic of China

Duties as Follows:

Coordinate with head office regarding material delivery and follow-up availability of materials for issuance of reservation and warehouse authorization sheet. This includes inputting of data concerning material delivery utilizing oracle database. Inspect NON CONFORMANCE REPORT for material identification, replacement and purchasing purposes.

In conjunction with procurement department, the follow up of delivery dates of materials by the supplier.

Inclusive dates : July 1990 — December 1990

Position : Chief Electrical Engineer

Company : Federal Builders Inc.

Project : 30 - Storey New World Hotel – Makati City, Philippines Duties as Follows:

Participate coordination meeting if requested by the project manager. Established the specification and the requisition in accordance with project requirement

(Contractual and standard specification)

Established the technical bid and transmits to project manager who is in charge in collecting the commercial bid comparison from procurement dept. Ensure technical follow - up of supplier, approval of all terms of the requisition issued by them.

In conjunction with the procurement department, the follow up of delivery dates of materials by the suppliers and when necessary, intervene for technical purposes at the supplier‘s workshop.

When requested by the procurement department, to make inspection or acceptance of equipment at the workshop according to specifications. When requested by the project manager to intervene on the site to solve problems concerning their specialty.

Inclusive dates : April 1989 - June 1990

Position : Cost Engineer

Company : Trindel Arabia Ltd.

Project : Saudi-France Hydrocarbon Solvent Plant

Madinat Yanbu Al Sinaiyah, Yanbu, Kingdom of Saudi Arabia Duties as Follows:

Supervise all cost control activities at the site. Secure permanent information readily available to field managers as regards to expenses, development and forecasted budget. Dispatch and collect detailed report sheet to all affected departments. Secure cost control system of the order and review data of monthly position of contracts and sub-contracts.

Collect from functional department man-hour expenditure and analyze trend relation to budget and compare expense commitments in relation to the schedule. Prepare estimate and follow - up the cost of changes in scope on the basis of information from specialist engineers.

Collect from functional departments all input data and prepares monthly status report from reconciliation of the said input.

Page 6 of 6

Prepare reconciliation of all inputs for project final report. Inclusive dates : October 1987 - March 1989

Position : Project Engineer

Company : Niagara International Construction Corporation. Project : 4 - Storey Commercial Building – Manila, Philippines Duties as Follows:

Responsible for the overall respect of deadlines, specification and is responsible to the project manager for liabilities concerning the progress and management. Management and supervision and planning of studies. Checking of tender specification, drawings and definition of major necessary changes. Approval of all documents issued by engineering.

Preparation of required documents and list of basic design data. Preparation of tender documents for issuance to possible vendors and sub contractors. Evaluation and comparison of offers from suppliers and sub - contractors and issuance of order to selected suppliers.

Follow up of changes on site and preparation of as built drawings and necessary revision and completion as requested by client.

Inclusive dates : June 1985 - September 1987

Position : Estimator / Supervisor

Company : Niagara International Construction Corporation Duties as Follows:

Attend bidding of various electrical projects wherein our company is invited. Estimate electrical and civil works both material take-off and cost for quotation and bidding purposes and submits said estimate to my superior for approval and submission of bid quotation to the client.

Prepare electrical design both power lighting power distribution for various project classified as turn key basis.

Supervise and Inspect electrical works base on drawings and specifications and monitor progress of work for billing purposes.

Prepare bill of materials, order, canvass and purchase materials needed to complete the project.