CURRICULUM VITAE

MUHAMMAD SIRAJ

QA/QC Manager, QA/QC Engineer,

Consultant Management Systems,

Quality Internal Auditor/Assessor,

Current Location: Haripur, KPK, Pakistan.

Mobile No: +92-342*******, 301-***-****.

Email Address: ********@*****.***

24 YEARS WORK EXPERIENCE.

EDUCATION:

B-Tech Honors Electrical, Preston University Kohat Islamabad Campus Pakistan since 2011.

Diploma of Associate Engineer in Electrical from Govt Poly technique Institute Haripur KPK since 1996. REGISTRATIONS:

Registered Professional Engineering Technologist from NTC/HEC Pakistan 2018.

Registered Electrical Engineer from Saudi Council of Engineering KSA. 2013 to 2017 to Jan 2020.

Electrical Supervisor Competency Certificate Government KPK Pakistan since 2002. TRAINING & CERTIFICATION:

QMS-ISO: 9001-2008 Certified Lead Auditor 2014.

OHSMS-ISO: 45001-2018 Certified Lead Auditor2020.

BS-OHSAS: 18001-2007 Certified Lead Auditor2014.

EMS-ISO: 14001-2004 Certified Lead Auditor2014.

Six Sigma Green Belt Certified Quality professional from PIQC Lahore since 2012.

Safety-Work Permit Acceptor (PTW) from SAMGE Riyadh since 1999.

One Year Diploma in (TQM) from Skilled Dev. Council KPK, Pakistan since 2012.

Certified professional in Microsoft Visio & Microsoft Project 2007 NIE Islamabad Since 2009.

Certified Safety Cardinal Rules BV Jeddah KSA.

Code of Ethics & Anti Corruptions BV Jeddah KSA

Code of Ethics & Anti-Corruption VELOSI QTR

Certified Green Drive & Safety is Absolutes BV KSA

IT Security Awareness APPLUS VELOSI QATAR

Cyber Security @BV 2020 Pakistan

Safety Training Certificate SLIP-Trip-&-Falls BV Pak.

Certified Commission & Startup online USA

Training Certificate COSHH online from UK A+D,

PROFESSIONAL EXPERIENCE:

1 Deputy Manager Electrical BUREAU VERITAS ISLAMABAD PAKISTAN Feb 2020 to 30th Jun 2020 Due to Covid-19

2 Consultant Management System APPLUS VELOSI, Client KAHARMAA QATAR (CSD Project) Ministry of Electricity & Water Qatar.

Jun 2019 to Feb 2020

3 QA/QC Consultant (QMS) Freelance in Pakistan Hattar Industrial Estate District Haripur August 2018 to May 2019 4

QA/QC Manager

BUREAU VERITAS SAUDI ARABIA (Mega Projects)

1. NEW KAIA PROJECT. King Abdul Aziz International Airport 2. CUC Mega Project Holy Haram Holy Makkah.(SBG-ABCD) Dec 2010 to July 2018

5 Electrical Sub-Engineer FBR Project Wing HQ Islamabad Pakistan Jan 2008 to Nov 2010 6 Electrical Engineer UNITED ENGINEER CONTRACTORS PVT LTD Fauji Foundation Teaching Hospital Rawalpindi, Pakistan Dec 2005 to April 2007

7 Electrical Foreman / Supervisor

SBG, SAUDI BINLADIN GROUP Project’s KSA

Dec 1997 to May 2005

8 Junior Engineer Electrical

GBC, Ghazi Barotha Contractor, Italian Company Impregilo KPK Pakistan July 1996 to Dec 1997 Supervisior

31%

Junior

Engineer

Engineer 17%

10%

Management

42%

SUMMARY:

Worked as QA/QC Manager, Consultant Management System, Senior Engineer Electrical, with a broad professional skill-set developed over 24 years’ working with leading and best practice National & multi-national organizations, in the range of industries & Facilities, Building infrastructure, Construction Technical Control, including Operation Maintenance Projects. A strong track record of success in relation with all aspects of Total Quality Management, QA/QC, QMS, EMS OHSMS, Management Systems ISO (9001. 14001. 18001. 45001) Monitoring Implementation & Evaluation works. Consultancy as assessor, Internal Quality Auditor, for organizational Management systems procedures and processes. Design and development of new and revision of procedures, processes for the Organizational actual practices in line with QMS Management Systems, Leadership Development, Processes analysis, improvement & Control for continual improvement of the Organization. Training & Development, Performance measurements (KPIs), Compliance Management with aspects, Based on National/International Standards. Analytical knowledge of Root Cause Analysis, Initiates & follow up for closing of internal NCR with Root cause, Corrective Action, CA/OFI. Improve & Control the deviation/errors in the system, Set up & management of QA/QC functions in the Organization. Prepare new or revise the (PQP, Manual, procedures & Processes). Facilitated the External auditor during the external audit.

Set up & manage the performance management system in line with Organizational Objectives.

Developed and implemented professional Report writing.

Testing Commissioning & Start up, for construction and installation of MEP works.

Assets Management, Quality Internal Audit and Inspection.

Prepared & submitting the Technical commercial proposals on the quotation of client pre-requisites & clear scope of works. Career Objectives.

Seeking for a job in Construction QA/QC Manager MEP in the organization where my potentials & acquired knowledge can be utilized at, optimum level. I have experience to make meaningful contribution & grow professionally the Organization. To offer my best qualification &, professional experiences in QA/QC, Consultancy, Industry, Power plant, Building construction/Operation & Maintenance. Personal Attributes.

Adept at working under pressure in different environments with strict deadlines and multiple deliverables. Proficiency at grasping new technical concepts & implementing the same to improve technical & operational efficiency. Prompt decision maker with the capability toward crisis situations with great objectivity. Excellent communication & interpersonal skills. Proactive approach, Flexible, Rush work Target achievement skills. Key Projects.

Bureau Veritas Pakistan, Islamabad, Quality Audits, Inspection, and Client assists assessments.

Successfully completed, Customer Service Department KAHARMAA QATAR.

Successfully completed, KAIA, King Abdul Aziz International Airport project Jeddah.

Successfully completed, 3rd Holy Haram Expansion sub Project (CUC) Central Utility Complex Holy Makkah.

FBR, Federal Board of Revenue Head Quarter Islamabad Pakistan (PMEC).

Successfully completed, Fuji Foundation Teaching Hospital Construction Project Rawalpindi Pakistan.

SBG, O&M Holy Haram Project, RPP-9 Power plant Project, Muna Tent Project.

GBC, Ghazi Barotha Hydral Power Plant Project in Pakistan. DEPUTY MANAGER ELECTRICAL INSPECTIONS NORTH. BUREAU VERITAS PAKISTAN ISLAMABAD Feb-Jun-2020 Responsibilities.

Reporting to Operation Manager Bureau Veritas Pakistan. Prepare and submitted the Technical Commercial proposal upon the client quotation.

Prepared the Audit and Inspection new /revised procedure in compliance with Quality Management System.

Performed the Quality Audit and Inspections base on QMS procedures and processes to check and compare the actual practices are in line with Quality Management System.

Prepared and submitted the Audit and Inspection report with Audit finding NCRs and follow up for closing with the provision of client compliance Root Cause, corrective action.

Prepared and submitted the monthly, Quarterly, and yearly financial Reports to reporting manager. CONSULTANT (QMS) Quality Management System, APPLUS VELOSI Client KAHARMAA QATAR. 2019 to Feb-2020. Responsibilities.

Reporting to Line Manager APPLUS VELOSI, Plan, organize & carry out the internal audit function including the preparation an audit plan/audit Schedule which fulfills the responsibility of the department, scheduling & assigning work & estimating resource need.

Daily monitoring the Operation & Construction activities & Prepare the Audit Reports, Opportunity for Improvement (OFI), Observation

(OBS)if evident Potential Nonconformance or NCRs, if evident Nonconformance, & closing with Root cause, corrective action according to the Audit follow up. Preparation of management review meeting notification and documentation as requested from Management.

Preparation of new operational procedure with processes in Advance Version of MS-VISIO Software.

Revision and updating the old Procedure & Processes as per the actual operational requirement.

Preparation of daily weekly, Monthly & Quarterly Audit finding Report as per Management instruction.

Facilitating the External Auditor during the performance of External Auditor.

Maintaining the CAR register with arrangement of hard copies of Documents.

Maintaining the master list of document for the compliance of external audit QA/QC MANAGER IN BUREAU VERITAS KSA. 2010 to 2018. Responsibilities.

Reporting to Line Manager in BV. In SBG reporting to QA/QC Deputy Director.

Checked & verified material sample board prior to approval from consultant.

Submission of Daily, weekly & monthly report to QA/QC Deputy Director.

Checked & verified approved shop drawings prior to execution.

Construction processes Evaluation Team Management, Root Cause Analysis, KPI, and Monitoring & Control.

Material Management, Material Submittal Approval. Team Mgmt. Coordination & Meeting skills from top to bottom Mgmt.

Manage the Tracking sheets & all LOGs with DCC. Proactive approach, Flexible, Rush work Target achievement skills.

Leading the QA/QC Team on the Project for Building infrastructure, & industries facility construction works.

Review & Witnessing of Inward Materials Inspection as per Material submittal & Project Specification.

Organizational assessment / Internal Audit. Familiar Standards: NEC/NFPA.IEC.NEMA.IEEE.BS-EN.NETS.ASTM.

Collection of daily reports from QC inspector & submissions to DCC Manager.

Deputed prioritized inspection tasks to QC Engineers, inspectors & checked results.

Focus on control of documents & control of records soft & hard copies.

Performed internal audits for organizational improvement, during Executions & readiness for commencement of external audit.

Prepared site execution memos after surveillance of site due to noncompliance low level.

Prepared nonconformance report NCR, if found work in not compliance with approved shop, drawings/specification high level error rates. Submission of weekly & monthly time sheets to line manager BV. ELECTRICAL SUB- ENGINEER / FBR HQ ISBD (JAN-2008 to Dec-2010). Responsibilities.

Coordinated MEP work under development projects across the country.

Review PC-1 cost as per Government approved rate analysis, checked inflation, escalation, contingencies & risks. Checked drawings & BOQ’s.

Reviewed biding documents with technical aspects & verified profile of selected company.

Monitored under developed projects across the country, verified/Inspect the work is compliance with approved drawings & specification.

Attended meetings CDWP & DDWP for technical discussion & further approval of PC-1.

Follow up & submission of financial report as cash plan & work plan to planning commission of Pakistan ongoing projects.

Reporting to project director of DPMIE Islamabad HQ FBR. ELECTRICAL ENGINEER UNITED ENGINEER CONTRACTOR (Dec-2005 to April-2007) Responsibilities

Reporting to project manager, submission of shop drawings to client for approval & execution.

Submission & approval of material sample boards to client prior to execution.

Checked & verified subcontractor material & Electrical execution compliance with specification.

Checked & verified monthly BOQ of subcontractor with cost analysis.

Attended weekly & monthly meeting with client to reviewed project milestones.

Assessments of electrical construction team performance & requirements. ELECTRICAL SUPERVISOR Holy Haram Mosque Holy Makkah (Dec-1997 to May-2005) Responsibilities

Reporting to operation engineer, perform as per master plan of preventive maintenance.

Deputed task to technician for operation & maintenance.

Installation of cable ladder, cable trays & trunking.

Cable pulling & termination as per approved shop drawings & panel schedule.

Installation of different type of conduits, RGS, EMT, UPVC, PVC, HDPE, as per approved shop drawings.

After final execution prepared as-built drawings for project final handover.

Installation of all low current services in building area as per approved shop drawings.

Cable pulling & termination for AHU & steam turbine control panel as per panel schedule

RGS Conduit & cable termination of thermocouple in boiler ACC air cooled condenser area.

Supervision of MEP works like PVC, RGS, EMT Conduit, LV cable pulling & termination.

Inspection with consultant after execution of electrical works.

Preparations of as-built & testing commissioning of MEP works prior to hand over project.

Submission of daily & weekly progress report.

JUNIOR ENGINEER ELECTRICAL Hydral Power Plant Pakistan (July-1996 to Dec-1997) Responsibilities

Reporting to project engineer.

Performed three months at beginning as trainee, after promoted in to junior engineer electrical.

Supervised in execution of MEP works. Like erection of tower crane, cement stock salvoes, overhead crane in workshops & erection of crushing and pashing plants.

Supervised in execution of MV & LV cables pulling overhead & underground as above said works.

Supervised electrical works during installation of water pumps & submersible pumps.

Supervised flood lighting system during excavation of canal.

Supervised lightning protection system in mining magazines at mining site of project. Overall Role & Responsibilities

Advices senior management to implements the new ideas tools & techniques in QA/QC department, TQM, PDCA, DMAIC, in all construction pro to reduce errors & improvement in organization.

Observe & advancing the quality achievement through KPIs, which simplify the effectiveness and efficiency of the organization to client.

Continuously reviews PMS & adjust it as required, also in good coordination/Communication with project team & senior Management.

Member of project steering committee meetings, weekly, monthly, meeting with senior management, client, subcontractor, & with consultant.

Performs internal audit /assignment of Procedures, for Client & Subcontractor with the support of IMS Manager, the all Operational & constr processes.

Implementation of Inspection Test Plan (ITP) & Checklist, in Operation & Construction Quality Procedure & Method of Statement.

Preparation/Submission of Inspection request & Material Inspection request, Site acceptance test request with all necessary documentations.

Review & Inspection for all Electrical Material Inspections with consultant, Prior to installation.

Progressive Site Inspection, Testing Commissioning. Team Management, Root Cause Analysis, KPI, Monitoring & Control. Site Coordination, Non-conformance (NCR) Corrective Action (CA).

Ensure & Follow-up all quality works carried out on project site as per the client requirement & Compliance with Project Quality Plan & Operational Procedures, Inspection Test Plan (ITP-Checklist).

Interaction with client / Consultant for resolving quality issues with daily & weekly Meetings.

Review / Prepared Method statement & other project specific documentation, in consultation with the Senior Management / Team.

Schedule & conduct the inspection & tests in coordination with the discipline engineers as per ITP’s.

Review & Witnessing of Inward Materials Inspection as per Project Specification & Requirement.

Maintain good relationships with the client to establish the organization as the contractor of choice.

Continuous review & updating all Tracking sheets/LOG’s Covering Inspection Request, Material Inspection Request, and Site acceptance Test request, Method statement Material Submittals etc. & monitoring their status.

Follow-up Issued & Control the snags / Punch list & subsequently, follow-up on a daily basis.

Follow-up for the Closing of all issued complaints, Site Instruction, Site Observation, NCRs, in order to ensure the continuous quality Improvement as per Organizational Objectives.

Managing, Monitoring & supervision for installation 1st, 2nd, 3rd, Fix from initial stage to final handing over of MV & LV Switchgears & Panels, MCC, Transformers, 5000 tons Chiller Primary & Secondary motor, MV Motor control Switchgear (VFD/VSD system), 5 MW DG set with daily tanks safety control system, Distribution Boards, Internal & External Lighting with LMS, Power, street lighting Poles, Equipment

& Building Earthing, Lightening Protection system, Fire Alarm with High fugue system, CCTV, ISS, BMS, system Cable Tray, trunking, Cable Ladders, LV Bus ducts, LV & MV Cable Laying tagging dressing testing & termination, RGS, EMT,PVC, FMC, Conduit, Laying & testing of all Types of power & control system. LV & MV Equipment setting in place with site testing & commissioning.

Documents Review for all Inspection Request are provided with all technical documents such as approve MIR, Test Reports, Calibration Certificates, Previous copy of Inspection request & Approved Shop Drawings / As Built Drawings.

Expert in MEP works, infrastructure, Roads & Bridges, Industrial Buildings, Multi stories Office & Residential Accommodation, Power Plants, Bashing Plants, Crushing plants, Flood lighting, Telecommunication, Electrical Transmission & Distribution, ISS, BMS, LMS, CCTV, & Low current systems, Bids evaluation, Bids preparation & submission, Inspection & Testing commissioning, till final handing over the projects.

Monitoring Implementation & Evaluation all phases of Quality Control works as per specification & approved shop drawings.

Manage & oversee project Quality control to ensure compliance with Quality Plan, aspects, and organization objectives.

Manage the project development monitoring Implementation & evaluation with (IMS) integrated Management System.

Responsible for the overall Execution Monitoring Implementation & Evaluation of Quality Control related Electrical works accordance With project specification & Standards.

Verify the construction Drawings, Specification & installation procedures of Electrical Equipment.

Inspection of Electrical Installation of MV & LV Switchgears, Panels, Transformers, Cables, Cable Terminations, Cable Routing, Cable Tray, Cable Ladders, Cable Trunking, Bus Duct.

Verify all required inspection reports & test records are systematically generated & complied according to the approved QC Procedure Doc.

Coordinate with Client representatives for improvement & implementation of quality policy & objective in Organization.

Guide & Advices site engineers & Supervisor, as applicable to ensure that PROJECT deliverables fully reflect QA/QC requirements & Other specific guidelines set by Organization.

Preparation of look-ahead schedules & ensuring that all the schedules are met.

Monitored & Follow-up the successful commissioning flawless start-up & normal operational activities through equipment inspection & Maintenance activities Based on QA/QC procedure & reliability centered maintenance techniques.

Tracking of Testing Equipment Instruments for Calibration Records.

Ensuring the smooth handing over documentation for completed projects. Multiple Competencies and Management Abilities

Manage & coordinate multidiscipline engineering activities to ensure projects executed in a safe, efficient, cost effective and timely manner.

Act as primary technical coordination interface with client to ensure that the client’s expectations are satisfied.

Ensure the project conforms to the client’s approved Basis of Design and all applicable regulatory and code requirements. Specific Accountabilities

The following apply as appropriate for the contract scope: 1. Health, Safety and Environment

Responsible for the personal safety and safe working practices for personnel working for you.

Understand and comply with HSE procedures.

Demonstrate leadership in HSE.

Steward the use of “Safety in Design” principles for your projects.

Maintains HSE focus within the team to ensure HSE requirements included in design and procurement. 2. Client Relationships

Maintains and builds healthy client relationships.

Proactively resolves performance, scope and schedule issues with the Client as they arise.

Identifies, documents, communicates and meets the client’s requirements. 3. Commercial Management

Effectively develops and manages budgets within Sustaining Project Engineering total scope. 4. Scope Management

Compliance with Project Management Process (PMP), Enterprise Management System (EMS) and the General Engineering Services (GES). Contract Execution Plan (CEP).

Compliance with requirements of the contract.

Effective change control process application.

5. Time Management

Accountable for the development of the engineering schedule and contributes to the development of overall project schedule.

Manages work in accordance with the approved schedule. 6. Cost Control

Manages engineering cost aspects of the project to forecast final costs, identifies trends and takes action to avoid cost overruns.

Contributes to the overall project cost forecast. 7. Quality Management

Accountable for project engineering compliance with organization policies and procedures. 8. Team Management

Focuses team on achievement of milestones and other key project objectives.

Listens to the team, discusses the issues, resolves problems and directs activities to remove obstacles and achieve objectives. 9. Communications Management

Regularly provides clear reports to project management.

Effective communication with the design team and third parties.

Accurate, timely and effective reporting to the reporting person. 10. Risk Management

Monitor & Evaluate the implementation of Risk cycle, Highlight & closure of all identified engineering risks and opportunities. 11. Design Management

Sets clear objectives to the design team, including achieving productivity and budget targets.

Ensures design team aware of, and complies with, applicable regulations and codes.

Manages inter-discipline interfaces effectively. 12. Procurement/Subcontracts Management

Assesses procurement processes throughout the project to ensure goods meet specification, are delivered on time and are within budget.



Contact this candidate