Chethan N. S.
QA/QC ENGINEER, CSWIP *.* (WELDING INSPECTOR)
+91-741*******, +971-*********
***************@*****.***
Career Objective:
To be involved in an environment where I can utilize my skills and get creatively involved with system that effectively contributes to the organizational and personal growth Academic Profile:
Qualification
Course
/Discipline
School/College Board/University
Year of
Passing
Percentage
B.E.
Mechanical
Engineering
Sri Dharmasthala
Manjunatheshwara
Institute of Technology,
Ujire (SDMIT)
Visvesvaraya
Technological
University, Belgaum
2015 62%
Diploma
Mechanical
Engineering
Sahyadri Polytechnic,
Thirthahalli (SPT)
Board of Technical
Examination
2012 67%
PUC PCMCS
Sacred Heart PU
College (SHPUC)
Department of Pre-
University Education
2009 62%
SSLC SSLC
DVS High School,
Shimoga
K.S.E.E.B 2007 77.69%
Seminar: Non-Renewable Energy Sources as Fuels.
Project:
Arrow Root Peeling Machine – The objective was to design and fabricate an equipment capable of peeling arrow root in higher quantities. It is a semi-automatic machine which is operated by a 2 HP motor.
Areca Nut De-husking Machine – The main objective was to design & fabricate an equipment to remove dry & wet husk from the crop. It is a semi-automatic machine which separates husk and nuts at a moderate capacity. This is operated by a 1 HP Electric Motor. Skills:
• Effective Communication and Good Grasping Skills.
• Hard working and positive attitude.
• Ability to work under pressure and team worker.
• Time Management and Self-Motivating.
• Flexibility and Willingness to learn more.
• Motivating and good organizational skills.
Technical Skills:
• Microsoft Office (Word, Excel, PowerPoint)
• AutoCAD – 2D
• Typing Speed – 30 WPM
Additional Course:
• CSWIP 3.1 (Welding Inspector) TWI, The Welding Institute – UK ID Number -759086
Work Experience:
Pynat Corporation India Pvt. Ltd.
January 2016 to June 2016
Production Shift Incharge
• Discussing the production plan and executing the same
• Maintaining all production documents
• Monitoring the calibration and records
• Daily hand shake shift relieving
• Man Power Handling - Maintained a team of workers
• Implementation and practice of 5S
• Checking proper House Keeping at shop floor
• Wastage reduction/minimization and control
• Maintained continuous production with minimum stoppage GLOBAL PRINTING & PACKAGING CO. PVT. LTD., BENGALURU 27th July 2016 to 30th Sep 2018
QC Executive
• To test and verify various quality parameters of the Inward and outward materials as per AQL and the results are recorded and evaluated
• Quality Control objectives are maintained while coordinating the production procedures with the manager.
• Inspection of all production operations periodically and check the implementation of Standard Operating Procedure (SOP)
• Online inspection, Pre-Dispatch Inspection as per AQL (ISO 2859-1) and Preparation of COA is done on a daily basis
• Making sure that Quality Related Complaints are attended, investigated and resolved at the earliest as per the quality standards of the customer
• Continuous Improvement activities are practiced where attention is given to Quality Related Issues in production
ACE CRANES AND ENGINEERING LLC, AL HAMRA FREE ZONE, RAS AL KHAIMAH, UAE 10th Oct 2018 to 12th Nov 2020
QA/QC ENGINEER
Project Executed & Clients:
o BHGE-BAKER HUGHES – North Rumalia Project –Control Cabins Container. o BOUSTEAD CONTROL & ELECTRICS PROJECT – Wellhead Control Panels. o CUMMINS WORLD WIDE- Acoustic Enclosures.
o CUMMINS ECOMAR PROJECT – Custom Built Enclosures. o CUMMINS BAHRAIN BATELCO PROJECT – Custom built enclosures & Circular Double Wall Fuel Storage Tanks.
o KUWAIT NATIONAL PETROLEUM COMPANY (HUNTER)- Blast proof container rooms.
o STERLING & WILSON SWP –Ceylon Srilanka Project CSC Containers. o NPCC –MAB PROJECT- 40000 liters Circular Fuel Storage Tank. o NPCC –ONGC PROJECT- 25000 liters Rectangular Fuel Storage Tank. o CUMMINS QUSAHWIRA PETROFAC PROJECT - Circular Fuel Storage Tank. Duties And Responsibilities:
• Ensure that Qualified Welders, WPS & PQR are used to perform tasks and NDT (UT, RT, LT & MPI) requirements are fulfilled as per ITP.
• Inspection of raw material according to procurement order (P.O)/Project requirement and reviewing of mill test certificate (MTC).
• Stage wise inspections like.(fit up, directional orientation, Alignment, Joint preparation, root pass visual & NDT, Weld Visual, Final dimension & NDT) Inspection on welding for structural members and Fuel Tanks.
• Preparation of Fit up reports Weld visual Inspection reports, Hydro test reports, Test Packages, Punch list, NDT witness, ferrite test, PMI, Painting reports.
• Receiving RFI and attending inspections by coordinating with Clients.
• Witnessed, checked, monitor and inspect of hydro/pneumatic test pressure as per procedures codes and standards.
• Witnessing and conducting Testing like Salt Contamination (Bresel Patch Method and Elcometer 130), Surface Profile.
• Maintaining batch certificates for incoming materials for paints.
• Coordination with paint manufacture for technical queries.
• Coordination with Client Representative/Third party inspectors/Suppliers for inspection requirements of the project.
• Monitor the weather condition and checking the ambient Temperature, substrate temperature, dew point and relative humidity before and during the work and when necessary.
• Witnessing the Surface Preparation and paint mixing before coating application.
• Check Painting/Coating Application processes are carried out in accordance with Client approved procedures & specification. To ensure the Painting/Coating, Blasting as per the client specifications.
Personal Details:
Date of Birth : 28th October 1991
Father’s Name : Sheshappa Shetty
Gender : Male
Nationality : Indian
Marital Status : Single
Languages Known : English, Hindi, Kannada, Tulu and Tamil Hobbies : Playing Cricket, Browsing the web, listening to music DECLARATION:I hereby declare that all the above statements are correct to the best of my knowledge and belief based on my original documents. Place: UAE (Chethan N.S.)