Post Job Free

Resume

Sign in

Manager Mechanical Engineer

Location:
Pune, Maharashtra, 411048, India
Posted:
March 31, 2021

Contact this candidate

Resume:

CURRICULUM VITAE

To,

The Discipline Manager / HR Manager,

Respected Sir,

I would like to take utmost interest to put my candidature for the same. I hereby give brief information with respect to my qualification and practical experience for your appraisal and sympathetic consideration.

Personal Information:

Name : SHABBIR RAFIUDDIN SHAIKH

Address: Kondhwa Khurd,

Pune – 411048, Maharashtra, India.

E-mail: adla31@r.postjobfree.com

Skype - shabbir.shaikh310

Height: 176 cm.

Weight: 75kgs

Marital Status: Married

Nationality: Indian

DOB 22/3/1951

Health: Normal / Athletic

Language Known: English, Hindi, Urdu, Marathi, Arabic, Indo Bahasa, Swahili.

.Passport . : Yes - Exp- 14/6/2022

Qualification: Mechanical Diploma(Private Sector) + B.Com

Post Applied - Senior Position for Oil & Gas sector - Fabrication/Tank/Steel Structure/Mechanical construction.

I have more than 20 years experience of Fabrication &Erection of fuel tanks, piping, pressure vessels, equipments, steel structural for oil and gas, petrochemical, refinery, LNG, Power,sugar, cement,chemical, Wind power and Paper Mill project. I am well versed with all fabrication and erection activities and also possess good knowledge of engineering drawings for project handling.

Hope my practical experience and knowledge of welding ( NDT, DPT, UT, MPI and RT ) can serve your project / workshop requirements and gear up productivity. I have confident to handle all the discipline which are related to mechanical field independently.

I have deep knowledge of HSE requirements which are essentials for site construction. I am very much aware rules and regulations of NEBOSH, OSHA.I have certification of Qatar Gas for HSE.

Looking for new opportunity as a Senior Level OR Consultant for Heavy Fabrication / Tank / Steel Structure / Mechanical Construction .

Experience ( Abroad )

1) YANBU REFINERY - SAUDI ARABIA - Aug 2016 to Oct 2016

Worked with Yanbu Refinery as a Inspection Coordinator - Tank & Piping. (Shutdown ) Coordination with sub contractor and inspection dept while construction and stage-final inspection to release for commissioning team. verify punch list after attending points by sub contractor. Tank inspection carried out as per API 620, 650 and 653. insure tank foundation from inspection dept and handover letter from civil to mechanical, Reporting to construction manager, project manager on day to day basis. to verify welders qualification valid ID, Coordination with Technical consultant, Design dept, Support to HSE site supervisor to avoid Incidents / Accident / Near miss while construction at site.

2) PT OKI PULP and PAPER MILL - Palembang - Indonesia - Aug 2015 to May 2016 ( SAP NO - 01126612 )

Worked with PT OKI PULP & PAPER MILL as a Mechanical Engineer - Tank, Piping and Equipment Installation for Water Treatment, Pre treatment, Post treatment and De mineralization plant area- Total Tank Tonnes - 7500.

Job Includes - Supervision, Planning, Execution Scheduling Estimation, Coordination with HSE, Contractor, Supplier and Consultant, conducting daily meeting with all the discipline to avoid interfaces at site to smooth installation, insure tank foundation handover letter from civil to mechanical, reporting to project director, project manager and general manager on weekly basis, day to day reporting to construction manager, to check welders qualification valid ID, I was responsible to prepare preliminary inspection report and Punch list of Tank, Equipment and Piping before raise RFI to QA/QC Dept, weekly walk down with management to check work progress as per planning. I have supervised SS and CS Tank installation as per standard API 650, 620, 653, arrange Tank material, Equipment, Pipes to construction site as per installation plan, verify punch list item after attending by sub contractor, support to erection team for fire fighting system, preparation of Method statement and JSA. support to Boiler erection team to speed up erection activities.

Motto - Safety, Quality and Productivity.

3) Southern Engineering Co Ltd(Alpha Group) – Mombasa – Kenya ( June 2014 to July 2015 )

Worked with Southern Engineering Co Ltd as a Construction Manager – Tank and Piping in Mombasa workshop as well as project site Lake Turkana Wind Power Project for their client – Kama – Netherland.

Duties and Responsibilities – I was independently responsible for Supervision of heavy fabrication and site erection activities, Estimation, Planning, Execution, Scheduling, Supervision for Tank and Piping Installation, insure tank foundation handover letter from civil to mechanical and joint inspection with third party, Conducting interview for staff, skilled, unskilled and semiskilled, Conducting daily meeting, Co- ordination with HSE, QA/QC, Client relationship and Design Dept, Support to Design engineer for prepare pre - fabrication drawings for steel structure / Tank / Static Equipments as per International code ASTM, ASME, DIN100, API 620, 650, 653, Reporting to General Manager, Project Manager, Achieve weekly target and Milestone, Co Ordination with Third party inspection agency - Worley Parsons for Steel Tank inspection, Overall controlling manpower with Safety, Quality and Productivity. to ensure welders qualification valid ID, verification of punch list which is submitted by third party inspector, preparation of Method statement and JSA.

I supervised and handled successfully semi automatic system for fabrication work in workshop also deep knowledge of searing machines, press break machines, hydraulic machines and CNC profile machines.

I have designed and supervised fabrication of Jigs & Fixtures for Steel Tank construction.

I completed my assignment successfully without any Near miss, Incident and Accident at construction site. Accepted challenge to Tank installation on Hill. Tank has been installed 500 meters height from sea level on Hill. I have personally supervised HSE requirements at site.

4) Inco International – Dubai ( March 2013 to Jan 2014)

Worked with Inco International as a Senior Mechanical Engineer - Tank & Piping in AL BASRAH IRAQ for their client Samsung Engineering Co Ltd – Owner – Luke Oil Mid East Ltd.

Job includes - I was responsible for planning, Execution, Scheduling, Preparation of Tank wise manpower bar chart, Attend weekly meeting with management, Arrange construction equipment for tank erection, support to sub contractor for fire fighting installation, Co ordination with QC Dept and Client QC inspector at the time of stage wise inspection, Support to HSE officer to avoid Incident / Accident at construction site and weekly target achievement as per given schedule. to check welders qualification valid ID. I Supervised Water and Fuel tank as per API 620 and API 650.( Total Tonns-7500 ). I was responsible for Quality / Safety and Productivity and also responsible to verify punch list item before raise RFI by sub contractor to inspection dept, insure tank foundation handover letter from civil to mechanical, preparation of Method statement and JSA.

5) Petrol Steel Co Ltd (Rotary Engineering and Rafid Group Joint Venture-Saudi Arabia) Dec 2009 to May 2011

Iqama # 228*******

Worked as a Fabrication Superintendent ( Tank age/Piping/Equipment/Steel Structure ) with Petrol Steel co for their client Saudi Aramco and Total Refining Petroleum Project ( SATORP-Package-6 )

Job includes- planning, controlling work force, Execution, Scheduling, achieve target for

estimated plan, support to HSE/QC/Client to avoid interface, Conduct weekly meeting with all staff to achieve weekly target, support to shop/site engineer, supervisor and foreman for productivity, weekly report to General Manager/Construction Manager/Project Manager, co ordination with, QC and Engineering Dept, support to Logistics dept for sourcing of rental Equipment’s for construction site and workshop according to work load, finalising monthly rent with supplier as per type of machinery, Responsible for Tank Age fabrication ( Total Tons - 8000 ) and transport to construction site according to erection sequence.

I supervised and handled successfully fully automatic and semi automatic system for fabrication work in workshop as per International standard ASTM, ASME, DIN 100, also deep knowledge of searing machines, press break machines, hydraulic machines and CNC profile machines.

Co-ordination with HSE dept and sub-contractor for safe working activities at site, Attend weekly walk through with HSE dept and management to avoid Hazards, Incident and Accident at construction site, responsible for Facilities and government rules and regulations as per industrial low. Coordination with Design dept for changes minor issues as per site condition, to arrange welders test piece to get qualify for 2G, 3G and 6G position. check welders qualification valid ID before start welding on Tank.

While tendering my duties and responsibilities I have conducted interview for local employees for skilled, unskilled and staff candidates as per requirement of workshop and construction site time to time and selected right candidates for right job which has helped to improve workshop and construction productivity.

I am very much aware about HSE requirements of NEBOSH, OSHA and IOSH which are most important for construction site for all the field.

6) Hanwha Engineering & Construction CO ( Saudi Arabia ) July 2008 to Sep 2009 ( ID NO - HW - 2047 )

Worked with Hanwha Engineering & Construction co as a Lead Tank Supervisor in Saudi Arabia-Al- Jubail for their ETHYLENE AMINES PROJECT.

Job Includes- I was responsible for supervised Fuel and Water Tank Age, Piping, Steel structure & Equipments, providing support to HSE dept to prevent accident/incident/ injuries at construction site, co ordinate with QA/QC dept and sub contractor at the time of stage and final inspection, to attend co ordination weekly meeting with all other discipline to avoid interface each other to achieve final target and milestone and responsible for Safety, Quality and Productivity ( Total Tank age Tons - 9500 ) supervised Boiler package ( Thermax brand )44 tons capacity 2 units/Incinerator package/RO package/Equipments shelter, to submit daily report to discipline manager / Construction Manager / Project Manager. Assure welders qualification valid ID before start welding on Tank. verification of punch list item before raise RFI for Re inspection by sub contractor, preparation of Method statement and JSA.

While tendering my duties and responsibility I also conducted interview for sub contractor manpower skilled / unskilled as per site requirements for mechanical field. I have good command to select right candidates for right job. Ensure tank foundation handover letter from civil to mechanical, support to sub contractor for fire fighting installation, I was acting as a mechanical lead supervisor.

7) Chiyoda Technip Joint Venture ( Qatar ) Jan 2006 to May 2008 ( ID NO - 251******** )

Worked with Chiyoda Technip Joint Venture in Qatar as a Lead Steel Structure Supervisor for their Qatar gas QGX- LNG onshore facilities project. ( Total Structural Tons - 11000 Each Train )

Responsibilities and Duties:

Job includes- Providing support to HSE dept to prevent Incident, Accident, Injuries and Hazards at construction site, attend co-ordination meetings with all discipline representatives to avoid interfaces on site and provide work front to each other and arrange work front for each discipline, attend HSE and management walk through every week to avoid Accident, Incident, Injuries and Hazards at construction site, General supervision at site to support HSE dept, check the work permit for particular work at site, help sub-contractor to achieve weekly erection target, day to day work reporting to discipline manager, inspect steel material before erection, co-ordination with QC inspector and sub-contractor at the time of stage inspection and final inspection, field supervision.

Co- ordination with sub-contractor and Safety Dept. for smooth running productivity, safety leadership, co-ordination with engineering department and sub-contractor

regarding technical queries/site instructions/field design changes/additional and modification work. Finally to achieve project mile-stone/successful goal. I have conducted interview with sub-contractors HRD for Skilled, Unskilled and Staff candidates those were related to steel structure field.

I was acting as a Steel Structure Lead Supervisor for Train 4 & Train 5 and also was responsible for Safety, Quality and Productivity.

8) Saipem Contracting Company Limited,Nigeria - June 2004 to Oct 2005

Worked as a Lead Steel Structure Supervisor for their Gas Fire Boiler power plant 330 KV capacity project. (2 units)

Job Includes-- Authorized to sign work permit like Confined space entry, Hot work, Cold work. Support to HSE dept to avoid Accident, Incident, Hazards at construction site, General supervision at site, supervised steel structure, piping, Plate work, Assembly work and inspection for bought out items like valves, flanges, gaskets, elbows, sockets and stud bolts, co-ordination with HSE team and work force regarding safe work at site, co-ordination with engineering dept. regarding engineering drawings/field design changes and site instructions. Supervised Boiler including piping, baffle plates, site wall plates and HRSG Installation as per erection sequence.

9) Mannsmann Annlagenbau Arabia Ltd. Saudi Arabia ( ID NO - 478 )

Worked as a Steel Structure Supervisor for their Abqueq crude export capacity project (ARAMCO CONTRACT No. – 37163/00).I was responsible for fabrication of steel structure like heavy platforms, hanger supports, column, framing item, piping and erection activity in running refinery plant. I was authorized to sign work permit like confined space entry, Hot work and Cold work in plant premises for safety purpose, day-to-day reporting to discipline manager, co-ordination with engineering dept. regarding site engineering problems and drawing problems for fabrication of items, control the work force at fabrication shop as well as erection site. I was responsible for Safety, Quality and Productivity.

10) Sai Sadelmi (SOMALIA - Mogadishu )

Worked as Erection Engineer for their fuel tanks and water tanks construction for North power station project Mogadishu - Somalia. having responsibilities of quality work, time limit, labour control and safety. I supervised all the connections, fittings and assembly work, co-ordinate QC inspector at the time of inspection. I am very much familiar with Chicago fixtures which are essential to construct fuel tanks without Hydraulic Jack system, daily reporting to discipline manager. Supervised tank construction as per API 650 & 620 standard. Total Tons - 3500.

11) George Wimpey - Somalia

Worked as a Erection Engineer for Sugar plant erection at Juba Sugar Project.

I was responsible for Supervision, Planning, Execution, Scheduling and erection / Commissioning of steel structure, piping and equipment.

Experience - India.

1) Deccan Mechanical & Chemical Industries Ltd.

Works Manager / Senior Engineer - 9 Years.

2) Demech Erectors Pvt Ltd.

Senior Mechanical Engineer - 2 Years.

3) Simplex Engineering Works.

Fabrication In charge - 2 Years.

4) Ganesh Industries ( 2017 )

Technical Consultant - Fabrication - 1 Year.

5) Ambe Consultancy Services - Mumbai.

Technical Consultant - Overseas Recruitment - 1 Year.

6) Sheen Engineers ( 2018 to 2019)

Technical Consultant - Heavy Fabrication - 2 Year.

Job Includes - supervision, Planning, Execution, Scheduling, Coordination for Heavy Steel fabrication and erection activities of equipments, tanks, pressure vessels, piping, steel structural, gas, coal and oil fire Boiler, assembly work in shop as well as site. I have deep knowledge of fabrication of Sugar and Cement Equipments as well as Boiler installation. Conducting weekly meeting with concern dept, Achieve weekly target and final milestone, Safety/Quality/Productivity, Reporting to project director, General Manager/Project Manager.

Supervised in workshop as well as at site for various project like Oil & Gas, Refinery, LNG,Cranes & Conveyors, Material handling, Power, Cement, Chemical and Sugar Equipments, pressure vessels, Heat Exchanger, Column and Tower fabrication.

I have deep knowledge of mechanical equipment for cement, sugar, chemical and power plant and also experience of sugar project installation process and equipment sequence.

I have excellent command to control and handle all the fields which are related to mechanical activities. If you can give me a chance to work with your esteemed organization I can prove myself.

Thanks and Best Regards,

SHABBIR SHAIKH

+917*********



Contact this candidate