MUJAHID USMAN
MOHALLAH SULTANIA KHEWRA
DISTRICT JHELUM (PAKISTAN)
Mob#: +923*********.
Email: adl9fq@r.postjobfree.com
Passport #: EG2856451
Career Objective
I am looking for a good position in the field of Electrical and automation in a prestigious company where previous skills and capabilities can be put to efficient use. I possess effective organizational skills and the ability to supervise a team and develop the final output. P ersonal Information
Father's Name MUHAMMAD IDREES Gender: MALE
Nationality : PAKISTANI Religion: ISLAM
Marital Status: SINGLE
Domicile Province: Punjab Medical Category: FIT
Date of Birth: 11-Sep-1992 Place of Birth: Khewra
Summary of skills
Inspection and site supervision for Electrical construction works which includes Testing, Installation and Commissioning of Electrical, Power and Control System.
Design review of Wiring Diagrams and VFD’s.
Developing documentation such as GA’s drawing of MCCs panels, DBs, datasheets, cable schedules and layouts.
Preparing specification for Control system (DCs Motor control Centre).
Configuration and Installation of ABB and Schneider VFD.
Project Engineering, Design activities like preparation of system and instrument specification, control schematic, Instrument studies, logic diagram, control room, field instrument Layout..
Project Commissioning & Installations
Installation, calibration and loop checking of the field instruments.
Technical Support for the Electrical team.
Develop, implement and drive the procurement strategies in order to meet cost savings targets.
Complex problem solving.
Organizational skills.
Active learner.
Innovative thinking.
Commissioning
L anguage Skills
URDU (Mother Tongue)
ENGLISH (Good)
Punjabi (Fluent)
Experience
Organization SINACO ENGINEERING (PVT) LTD
Duration: FEB 2018 to MAR 2019
Designation: Internee Electrical Engineer
Projects Description.
1. 18MW power plant FEB 2018 to MAR 2019.
Organization ICI SODA Ash Plant
Duration: April 2019 to till date
Designation: Project Engineer E&I
Projects Description.
1. Internship. July-16 to August-16.
2. DA-70KTPA Exp Project. April -19 to Nov-19.
3. Training center project. Dec-19 to feb-20.
4. RSB-4 14KTPA Exp Project. Feb-20 to Dec-20
5. LSA Phase-II 135KTPA Exp Project. Jan-21 to Till Date