Post Job Free

Resume

Sign in

Aramco Qc

Location:
Norfolk, VA
Salary:
28
Posted:
May 07, 2021

Contact this candidate

Resume:

Resume

Name: Andres D. Maghanoy

Desired Position QA/QC Inspector

QA/QC Mechanical Inspector/Mechanical Supvr.

Sr. MECHANICAL INSPECTOR (STATIC & ROTATING)

Mech’l Inspector / Jobs Scheduler Controller.

Piping Static / Rotating Equipment, Package

HSE/ Safety Inspector

Nationality: Filipino

Date of Birth: November 30, 1963

Mobile # +1-757-***-****

Email adl8kt@r.postjobfree.com.

adl8kt@r.postjobfree.com

Home Address 1: USA. 3706 SYLVAN LAN Virginia Beach VA23453. USA

Education: Mechanical Engineering

Misamis University Ozamis City

1980 to 1986

High School Holy Trinity High School -1976-1980

Elementary School Midsalip Central School 1970-1976

Training & Seminars Oil Drilling Tech. May.2001

Asia Pacific Drilling Tech.

Philippines.

Loss Prevention Work Receiver

Southern area industrial Training Division

Saudi Aramco Abqaiq K.S.A

02/03/2008 License # 46894

Computer Literate: Word & Excel/Outlook

Professional Affiliation: Approved Saudi Aramco

Sr.QC Mechanical Inspector

Static & Rotating Equipment

SAP # 70008504

Approved Saudi Aramco

QC Mechanical Supervisor

SAP # 70008504

ASME MEMBER # 103441163

MEMBER SECTION: 040500

EASTERN VIRGINIA

Familiar Standards, Code ASME Sec, 1, 11, V, V11&1X

Including Saudi Aramco STD. ASME B31.3.1&31.8. API 686

ASME B31.1 Power Piping.

TRAINING AND SEMINAR ATTENDED

ASIA PACIFIC WELL DRILLING SPECIALIST.

MAY 7, 2001 TO MAY, 19, 2001,

Basic Introduction of Drilling Technology

Hydrogen Sulphide (H2S) S.C.B.C. Training

Basic Rig Orientation Safety Awareness

Basic First Aid Training.

OSHA - IBOEHS OSHA Construction Industry Safety and Health

Certificate-32-601******

Certificate of Completion–ISO 9001:2008 Quality

Oracle Primavera P6- Computer Aid Construction Project Management

Certificate – No.AM016856

DMV Driver License # B67254030

Class - D

Restriction- C

Certificate -Quality Management –ISO-9000

Operation Management Foundation.

Certificate No: Activity #: 100*********

SUMMARY

Quality Assurance Skills and Qualifications:

Technical Knowledge, Thoroughness, Communication, Planning, Project Management, Risk Assessment, Analysis, Resource Management, Timeliness, Product Testing, Writing, Scheduling, Computer Literacy, Organization.

Responsibilities for planning and production schedules, work orders, and staffing tables to determine personnel and materials requirements, and material priorities. Develop and distribute production schedules and work orders to departments.

QA/QC Inspector

4811 Commerce Dr, Power Mechanical Inc

Newport News, VA 23607 Boiler Specialists. Newport News

Phone: 757-***-**** VA 23607 4811 Commerce Dr.

Sept.04-2020 at Present

Responsibilities / Duties

Reads and interprets materials, such as work orders, inspection manuals, and blueprints, to determine inspection and test procedures. Analyzes and interprets sample data.

Inspection of new Installs and positions new or replacement parts, components, and instruments.

Estimates and records operational data. Completes necessary procedures to satisfy licensing requirements and indicates concurrence with acceptance or rejection decisions. Confers with vendors and others regarding inspection results, recommends corrective procedures, and compiles reports of results, recommendations, and needed repairs.

Cleans and maintains test equipment and instruments to ensure proper functioning. Tests and measures finished products, components, or assemblies for functioning, operation, accuracy, or assembly to verify adherence to functional specifications.

Inspects materials, products, and work in progress for conformance to specifications, and adjusts process or assembly equipment to meet standards. Starts and operates finished products for testing or inspection.

Reads dials and meters to ensure that equipment is operating according to specifications. Collects samples for testing, and computes findings.

Marks items for acceptance or rejection, records test results and inspection data, and compares findings with specifications to ensure conformance to standards.

Discards or rejects products, materials, and equipment not meeting specifications.

Fortis Solutions Group Quality Assurance/Quality Control Inspector

2505 Hawkeye Ct, Manufacturing & Production Packaging

Virginia Beach,VA 23452 Global Vision Inspection / Smart Sheet

844-***-****

October 7, 2019 Until August 30-2020

Responsibilities / Duties

Responsible for final inspection documentation accurately and completely for all finished product. Work closely with Production to ensure timelines are met for product release based on expected ship date. Work closely with Production to investigate any discrepancies between the product and product documentation and ensure resolution prior to releasing material for shipment. Document all final inspection. Release Observations and report back weekly to Quality Management. Scan and maintain accurate records of all completed paperwork to support product release and aid in investigations. Proactively audit jobs while in production to verify that Quality checks are being completed properly. Pull samples for external complaints, investigate root cause, and develop corrective actions by working with associates across departments. Write SOPs for current processes as well as future processes that will be implemented. Focus on 1-point lessons which are visual in nature. Log all internal and external quality issues and maintain communication with customers to ensure that non-conforming product is addressed promptly. Review quality procedures and forms for effectiveness (Maintain Best Practices) and ensure revision control is properly executed. Develop training materials, conduct training, and maintain training records for all employees on quality programs. Complete functional testing as needed to meet customer requirements. Promote quality achievement, performance improvement, and regulatory requirements throughout the organization. Effectively interact with Engineering, Customer Service, Sales, Production, and the Purchasing teams to maintain product supply, introduce new products, and establish quality requirements and testing. Interface with regulatory agencies, committee members, and other organizational staff to formulate corrective actions. Establish/enforce procedures and required paperwork to ensure compliance with all internal and external (ISO, AIB, Customer, etc.) quality requirements. Perform internal quality audits, identify non-conforming items, create and implement corrective actions. Monitor performance by gathering relevant data and producing statistical reports. (KPI’s, Internal and external issues, etc. Additional duties as required.

STIHL Incorporated Machine Operator.

536 Viking Dr, Polymer Plastic Blow Moulding Quality

Virginia Beach, VA 23452 Awareness Gasoline Tank Production Line

May 13 2019 Until Oct. 30,2019

www.stihlusa.com

Responsibilities / Duties

Responsible for performing various tasks to set up, operate, monitor, troubleshoot and perform preventive maintenance on assigned. Also be responsible for inspecting parts to specifications and adjusting, or tool changes as necessary to maintain quality specifications. Sets up and operates a production machine in accordance with established procedures of STIHL and guidelines. Reads and interprets blueprints and diagrams to select position and secure machinery. Adjusts machine settings to complete tasks accurately, according to specifications and in a timely fashion. Has knowledge of commonly used concepts, practices and procedures within a particular field. Rely on instructions and pre-established guidelines to perform the functions of the job. Work under immediate supervision. Ability to work in a fast-paced, high-speed environment, follow standardized work and adhere to safe work practices in a continuous improvement environment Experience in a manufacturing environment. Perform necessary pre-operation activities to ensure proper equipment startup and operation on multiple pieces of equipment. Operate/monitor multiple pieces of equipment during operation to ensure quality production and minimal unplanned stops. Communicate with team members and support teams to ensure continuous production of the correct product at high quality levels with minimal wasted time and materials. Housekeeping and sanitation.

Saudi Aramco

Site Mechanical Superintendent (Pipelines)

PMT under SMP Wellhead SHAYBAH Oil & Gas Increment Project.

JATCO Dammam KSA Division OMPPD NAOUPD SHAYBAH

P.O Box 2173. Wellhead F/L-P/H-T/H & T/L Pipeline Tie-In Telephone # (+966 3) 833-6610

From. June 16, 2014 to Jan 11, 1019

Responsibilities / Duties

Responsible for ensuring safe and successful execution of construction activities in the area

Participate in Project Management Team. Supervise day to day within construction Including Piping Material Take off. Contractor / Craft labour during the execution phase. Providing a focus on safety, quality cost

And schedule. Interfaces with QA/QC personnel to address quality issue / progress. Provide oversight of contractor materials verification system. Ensure compliance with specification, procedure and plans. Monitor workforce productivities / progress related to schedule. Monitor

Environmental compliance, as required interfaces with contractor for filed level change, e.g.

Scope costs, etc. Verified post-site arrival of procured materials and equipment serve as liaison with site manager area Lead on Barriers / emerging issue. Provide pre commissioning

Mechanical oversight verification. Supervise the mechanical completion phase and transition

To the final hook up and commissioning phase. Punch List management via EPC contractor

Oversee installation, hook up and turnover of mechanical equipment scope at utilities plant.

Includes stewarding preservation, vendor coordination /interface, construction packages static

& rotating /piping. Including HTB Horizontal Thrust Boring and Directional Drilling. Inspects equipment, tools, and working conditions to ensure safety of workers engaged in construction and maintenance of overhead and underground power lines: Inspects safety belts, ladders, ropes, rubber goods, and tools and replaces those not meeting safety requirements. Observes crews at work and reports laxity in safety precautions, such as failure to use goggles, rubber gloves, and other safety devices. Examines conditions of ditches and tunnels and recommends use of braces to prevent cave-ins endangering workers. Investigate accident to determine causes and devise preventive measures. May Instruct workers I use safety equipment and safe work methods.

Petrofac International Ltd.

QA Engineer Rotary Equipment (Procurement)

QA/QC Mechanical Supervisor

July 30, 2012/ Nov 10, 2013 Static & Rotating Equipment

PetroRabigh Phase 11 Project Common

Utilities & Tank Farm Packages Rabigh

Saudi Arabia / PetroPCS & winPCS

Responsibilities / Duties

Total of 25 years worked as QA/QC professional out of which 15 years on Saudi Aramco Project as QA/QC Mechanical Supervisor / Inspector Fully conversant with Saudi Aramco

Requirements such as schedule Acquainted with international codes and standards.

Familiar with the Aramco QA/QC requirements. Responsible for the QC inspection of all equipment installation on job site as per client standards. Conduct inspection checking of orientation, alignment, location, dimension, elevation levelling pads for several equipment.

Verify in accordance with the final or latest revision shop drawing and specification.

Responsible for the assurance and control of quality for of the installation of equipment static and rotating. Ensure that the engineering and inspections recommendation are carried out in time manner. Specified and carried out inspection at supplier works as per the purchase order

Requirements, ITP and Test procedures and issued final inspection release reports after final inspection.

Petrofac International Ltd.

QA/QC Mechanical Supervisor

Jan.11.2011 – July 08, 2012 Static & Rotating Equipment / HVAC

Karan Utilities & Co-generation Project

Khrusaniyah Saudi Aramco Kingdom of

Saudi Arabia/PetroPCS & winPCS.

Responsibilities / Duties

Monitor the implementation of quality control procedure in accordance with the quality

Assurance and manual project specification. Administer QC reports. Non –conformance/

Corrective and preventive action and distribution as required. Assist when required with

The preparation of project quality inspection plan prior to approval. Supervise Sub-contractor

Quality activities. Supervise the preparation, Monitor of all QC RFI and validation records.

Maintain standard of quality and comply with company program in the area of discipline.

Formulate inspection and test procedure organizes client approval. Perform Quality personnel‘s performance review objectives are meet up. Provide monthly reports to project management team.

Petrofac International Ltd.

Sr. QA/QC Inspector Mechanical

Feb 24, 2009 – Oct 29. 2010 Static & Rotating Equipment / HVAC

4th Stabilization & Sweetening Train

Project .Karachaganak Petroleum

Operating B.V Republic of Kazakhstan.

Responsibilities / Duties

Inspect and ensure report in all stationary refinery equipment according to set of schedule

On stream as well during shutdown and turn around. Investigate and recommended measure

To increase the service life of equipment to maximum, consistent with safe and efficient operations. Inspect new equipment and facilities under construction for the purpose of ensuring compliance with the drawing, specification, code and standards. Ensure that the engineering and inspection recommendations are carried out in time and manner specified.

Maintain field record to provide complete history components inspection, condition and material changes including HVAC.

Sung Chang Engineering Co.Ltd.

Mechanical Supervisor / Inspector

Jul 27, 2006 – Dec 19, 2008 Static & Rotating Equipment

Abqaiq GOSP 3 Modification

Project, Saudi Aramco K.S.A.

APPC –PDH/PP PROJECT

SABIC JUBAIL Industrial City.

Responsibilities/Duties

Interpret technical specification codes and standards required in the installation of equipment.

Check all mechanical drawing as prepared by designers. Ensure designed integrity and construction quality in accordance to the specification and good engineering practice. Prepare detailed schedule of mechanical discipline base on over all schedule. Inspect and review material upon arrival. Inspect, test, and sample materials or assembled parts or products for defects and deviations from specifications. ... Discuss inspection results with those responsible for products and recommend necessary corrective actions.

Hyundai Heavy Industries

Mechanical Supervisor / Inspector

Jul 10, 2004- Apr 10, 2006 Static & Rotating Equipment

Saudi Aramco Co generation Project SGP

CGTG / HRSG & BOP Equipment

Saudi Arabia K.S.A.

Responsibilities/Duties

Installation inspection and commissioning of Frame 5 GE Gas Turbine / Generator Packages

Combine Cycle in Saudi Aramco Co- Generation Project AGP CGTG /HRSG & BOP equipment installation. Accepting or rejecting the materials purchase if is not complying

For project specification. Monitor manpower requirements, tools and equipment preparation, compilation and retention of records, ITP’s and reports.

LG Construction (Arabia) Ltd.

Mechanical Supervisor / Inspector

Nov 25, 1994 – Jul 1, 1999 Static & Rotating Equipment

Saudi Aramco Project

Abqaiq Saudi Arabia K.S.A

Responsibilities/Duties

Liaise closely with QA/QC coordinator and QC personnel to ensure that all executed works

Have been inspected to and comply with the client specification and requirements

Liaise with other discipline for interfacing activities. Prepare all working procedure as necessary for project execution as per client requirements.

Cog far /Imprregilo SIRTY Libya

Mechanical Supervisor / Inspector

Nov, 16, 1993 to August, 28, 1994 Static &Rotating equipment

SIRTY Oil SIRTY Govt.

SIRTY Libya

Responsibilities/Duties

Liaise with client inspector and materials control department on material inspection, Raise Non - conformance reports (NCR) if there is any deficiency. Carry out site inspection, location and dimensional marking seating and visual inspection. Installation alignment 1nspectional test.

Cathay Metal Corp. Production Quality Inspector

July, 15, 1990 to March, 19, 1993 Rolling Plant (1& 2)

Cathay Rolling Plant

Nova QC Philippines

Responsibilities/Duties

Approve incoming materials by confirming specifications, conducting a visual and measurement test, and rejecting and returning unacceptable materials

Approve in-process production by confirming required specifications, conducting visual and measurement tests, and communicating the required adjustments to the production supervisor. Approve all finished products by confirming specifications and conducting required tests. Return products for re-work if needed and complete documentation to confirm re-work. Document and update inspection results by completing reports and logs

Keeps measurement equipment operating by following operating instructions and calling for repairs? Maintain safe work environment by following standards and procedures and complying with legal regulations. Coach and mentor junior employees; seek opportunities to grow leadership in others. Update job knowledge by participating in educational opportunities, reading technical publications, attending seminars, watching industry videos, etc. Accomplish organization mission by completing related results as needed

Monitor and expedite the installation of cooling pumps. Inspection for the installation

Of compressor unit. Maintain field records to provide complete history components inspection, condition and material changes. Monitor and expedite the installation of cooling pumps. Inspection for the installation of compressor unit. Maintain field records to provide complete history components inspection, condition and material changes.

Fahad Al FAIZ Trading cont.co. Junior Equipment Inspector

July, 24, 1987 to Dec, 4, 1990 Rotating Equipment

Saudi Electric Co. Hail K.S.A

Hail Saudi Arabia K.S.A.

Responsibilities/Duties

Responsible to organize, implement, conduct and manage the QA/QC programs as per the company quality policy and contract specification requirements of the project. Coordinate the document controls of technical submittal, drawings and etc. To work as a front line engineer and to coordinate with all inspection, monitor the required test and record inspection and tests made as per PQP and contract specifications and attainment of quality requirement. Review drawing and documents prior to commencement of various works. Activities include welding inspection, review of welding procedures and welder qualifications. Assists in QA/QC review of sub-contractor Inspection and Test Plans (ITP) and Method Statement. Perform surveillance of materials control, witness on various test such as hydrostatic test, Pneumatic test and etc., to ensure compliance with project requirements and specification. Check before welding the groove if it is in the accordance with the WPS/ API – 1104.Checking the roundness or difference in thickness of the tack weld and pipe fit-up inspection, including pipe thickness & pipe interval. Inspection of the welding rod use in the tack weld before proceeding in full welding joint. Be sure that the joints to be weld are cleaned by power brush or grinder. Check the welding condition including welding equipment, welding specification, and shield use. Check the inter pass temperature, the number of root pass required. These include the external inspection of welding joint – inner and outer pipe offset, under cut and crack & any discontinuities on the welding joint after welding. Liaise with client’s representative for conducting of day to day inspection of the project. Prepare daily and weekly production report and weld mapping.nspection in overhauling of flash drum tanks. Doing dye penetration test of all welding

Joint components of all tanks. Coordinate with testing commissioning coordinator for all

Testing and commissioning works.

UNDER TAKING:

I hear by certify that the above data and information contained herein are true and correct

To the best of my knowledge and belief

Andres D.Maghanoy

Junior Planning / Scheduler

Sr.QA/QC Inspector Mechanical /Site Superintendent

Static & Rotating Equipment. / Package.

Wellhead F/L-P/H-T/H & T/L Pipeline

HSE Safety Officcer/Inspector

References:

1.Pastor,Gerry Pabellar

757-***-****

2. Ray Basinga

adl8kt@r.postjobfree.com

702-***-****

3.Rogelio Mndoza

adl8kt@r.postjobfree.com

757-***-****



Contact this candidate