Post Job Free

Resume

Sign in

Iti Maintenance Manager

Location:
Mumbai, Maharashtra, India
Salary:
12 CTC
Posted:
May 06, 2021

Contact this candidate

Resume:

CHANDRASHEKHAR KUMAR

Flat No ****, Wing-G, Prima, Lakeshore Greens, Phase-2,Palava City, Dombivali East, Thane, Maharashtra 421204

Contact: +91-902*******, Email: - adl6w6@r.postjobfree.com

(Operation & Maintenance) – TELECOM INDUSTRY, EXP: 14 Yrs. Working as a Field Maintenance Manager(FMM) at Alcatel-Lucent(Nokia Networks) Mumbai.

Seeking challenging assignments across the Industry

PROFILE

Technically competent Switch Engineer with nearly 14 Years of career success in managing operation, maintenance, reliability, project and process management in the field of Land Line/Wire Line Communication, Wireless Communication (Switching).

Currently spearheading as Field Maintenance Manager, at Nokia Networks past employee as an Engineer maintenance in Indian Telephone Industries Ltd. (ITI Ltd) Mumbai, a Govt. of India undertaking under Ministry of Communication & IT; capable of defining and enforcing process parameters to maintain desired yield and quality norms.

Demonstrated expertise in defining and execution of new applications (memory expansion) added to the existing switching system, handling Switch Performance Analysis and Network Traffic Analysis and Manual Testing of Digital Switching System.

Thrive in a deadline intensive environment, multi-task, perform under pressure and meet deadlines. Ability to use sound judgment & decision-making skills and effectively perform in a self-directed environment.

Skilled in managing the human, financial and material resources in meeting predetermined/ cyclical deadlines, to plan and manage Work Programmes and to lead, motivate and provide effective guidance to a team of professional and support staff.

Technical Skills

Operating Systems

Windows 9X/NT/XP, UNIX

Languages

C, VHDL, ALP (PIC), CHILL

Wireline Technology: TDM switches, APC, SDC, HDM, Power plant works, DC rectifier, Battery Sets, AC/DC earth, MDF Test, PRI and BRI Lines test etc. works on E1(PCM)

Mobile Technology

CDMA, GSM, VoIP, Intelligence Network, Circuit switching, Packet Switching, IP switching, LTE, VoLTE, ISP

Protocols

SS7 (ISUP & TCAP), SIP, GPON,ICMP, IGMP,UDP,TCP, IPv4, IPv6, PPPoE, IPoE, SNMP, SNTP,DHCP

PROFESSIONAL EXPERIENCE

Presently Working in NOKIA Networks as Field Support Manager Since Oct.2014 to till date

Past Employee: - INDIAN TELEPHONE INDUSTRIES LTD, MUMBAI since 27th June 2007 to 06th Oct’2014

(A Govt. of India undertaking under Ministry of Communication & IT)

Engineer, Operation and Maintenance

Responsible for fabricating all types of cable connectors used in switch and its testing. Ensure strict observance of process parameters to achieve required yield within defined quality norms.

Implement preventive, planned and predictive maintenance to maximize operational life of machines and a focused approach on maintenance domain and minimized incidences of breakdown.

Map consumption pattern of spares and driving procurement initiatives to ensure availability of reasonable inventory thereof within defined parameters. Prepare daily report of switch and analysis.

Help in improving operational life and reliability of the equipment’s with regular condition monitoring and applying timely corrections.

PROJECTS UNDERTAKEN

Title

Poject name :(Alactel 1000E10)& Alcatel (1000MME10)

Clint: BSNL, MTLN & Tata Communication Limited(TCL)

Team size:2

Role: team lead

Period :- Dec 2009 to till date

Responsibility

Experience in operations & maintenance; service provisioning, Project Management, Integration Testing and validation for Alcatel OCB283 Switch.

Ensuring maintenance of complete network, inclusive of performance monitoring, day-to- day network operations, preventive & corrective maintenance

Monitoring all types of alarms and rectifying at hardware & software level.

Experience in 1000E10 (OCB-283) ALCATEL switch as Local, Tandem and TAX exchange.

Maintenance and Expansion of OCB-283 Exchange.

O&M station, Main control station, Auxiliary equipment control station, Trunk control station, RSU.

Providing second level technical support to BSNL /MTNL for maintenance for switch.

Memory and file expansion of Archive files.

Routine maintenance Tests to keep fault free working exchanges.

Taking backup in hard disc as well as in cartage.

Network Routing, Switching, and Charging Data Creation as per site specifically.

Subscriber Data Management.

Traffic Analysis and Overflow management, Exchange Data Backup Management.

Preparing CDR / detail billing tape.

Junction / circuit’s creation and make them to operational to different connected exchanges on CCS7 /R2MF signaling.

Capacity Expansion of OCB-283 exchanges.

Expert services to the customer for fault rectification in existing switches (OCB-283).

Debugging software fault with the help of TASC (Technical Advisor Support Center) team at ITI Limited, Palghat, (Kerala).

Creation of SS7 signalling link between exchanges.

Improving the CCR of the Exchanges.

PRI & BRI line testing.

PBX exchange work.

Trunk Line testing.

: Implementing new IN services in ALCATEL OCB 283 exchanges

Project Name: - Maintenance and Troubleshooting of Nokia ISAM 7360 FX-4 OLT (FTTH) JIO Mumbai .

Clint: JIO Mumbai

Team size:2+

Designation: - Field Maintenance Manager (FMM)

Period:- Oct’ 2016 to till date

Role: -

Software Up gradation of Nokia ISAM 7360 FX-4 OLT

Preventive maintenance of OLT

Rectification of alarms and faults

Planned Event and Node Backup activates.

Resolve customer related issues.

Performance checking of cards, Fans Etc.

Day to day activities.

Project Name: - Maintenance and Troubleshooting of Alcatel ADSL DSLAM’s, ISAM 7302, 7330 and Alcatel ADSL BRAS service routers SR-7750 in MTNL Mumbai Broad Band Network.

Clint: MTNL Mumbai

Team size:2

Designation :- Field Maintenance Manager (FMM)

Period :- Oct’ 2014 to till date

Role:-

Software Up gradation of Alcatel ADSL BRAS service routers SR-7750.

I am working on MTNL Broadband project for the equipment of Alcatel Switch DSLAM ISAM 7302, 7330 BRAS (broad band remote accesses server), and I also have Knowledge of GPON (giga passive optical network), FTTH, ADSL, VDSL and coper wire line.

Preventive maintenance of DSLAM using AMS (Access management server) 5520. Installation and commissioning OLT and modem, speed test using Okla on MDF

ISAM 7302 & 7330 is a L2 layer device which is used in ADSL for separate a voice and Data. It’s also called Multiplexer and DSLAM. All broadband user for coper wire line are connected through DSLAM. All user profiles are control by a DSLAM.

ITI (Indian Telecom Industries) Ltd, Bangalore-An ISO 9001:2000 Company

Project : Installation & Commission of ZTE CDMA Switch.

Designation : Engineer maintenance .

Client : BSNL

Location : Patna Bihar Circle

Period : Nov. 2008 to March. 2009

Responsibilities :

Installation of BTS, BSC & MSC Racks at the located sites at BSNL Exchanges.

Power up the Racks after checking the Voltages.

Connecting the BTS to BSC via E1 links.

RF testing for error or noise losses.

Commissioning of BTS racks with BSNL Executives.

Acceptance test of the installed BTS Sites.

Roles:- Maintenance of ZTE CDMA BTS .

Company :- ITI (Indian Telecom Industries) Ltd, Bangalore-An ISO 9001:2000 Company

Project:- Satellite communication networks work

Designation:- Engineer Maintenance

Clint :- Intelligence Bureau(IB)

Location :- Kolkata and North East, west zone of India

Period :- July 2008 to March 2010

Nature of works :- operation and maintenance of Satellite switch and faults .

Company:- ITI (Indian Telecom Industries) Ltd, Bangalore-An ISO 9001:2000 Company

Project: Laying of optical fiber cable of BSNL

Designation : Engineer Project

Clint:-BSNL

Location :- North East-II

Period :- June-2007 to June 2008

Roles:- Survey of routes, making estimate, issue of materials, work supervision, acceptance test offer(AT) cable joints work, measurement of works of billing, bill put-up, attending meting etc.

EDUCATIONAL QUALIFICATIONS

BE Electronics & Communications 2006

Rajeev Gandhi Technical University, Bhopal, MP; 72.65%

Higher Secondary 2000

BIEC Patna Bihar; 71.22 %

Senior Secondary 1998

BSEB Patna Bihar; 62.65%

Date of Birth: 6th May 1981



Contact this candidate