CURRICULAM VITAE
KARTHIKEYAN.J
F*,Abhi shrushti,Mahadevan nagar,
+91-893******* IAF Road, Selaiyur
adl3lu@r.postjobfree.com Chennai-600073
INTENTION:
There has been a significant increase in Mechanical both at National and International level. I would like to move into areas that are becoming important these days with an opportunity.
-To become a part of such an organization working with problem solving approach.
-To widen my technical familiarity, gain experience & to prove my competence across.
CAREER OUTLINE:
-Ability to lead team towards the results with a good plan and timely systematic execution.
-Positive commitment to employer & a good Listener.
-Able to organize and manage the meetings effectively.
-Charming and Friendly approach, relate easily to a variety of people from all backgrounds.
-Adaptability to any situation and able to preserve confidentiality at all times.
-Excellent comprehension and practical application of new system and technology.
-Punctual, well-mannered, aggressive and embassy.
SHOP FLOOR CRITERIA UNDER CONTROL
-Mobile Production & Assembly Shop
-Production Operating engineer
-Vehicle Assembly Production (TCF Shop)
-Assembly Function in Passenger Car Domain
PROFESSIONAL EXPERIENCE:
CURRENT EMPLOYER:
Designation
Organization
Place
Discipline Area
Scope
Period
SI NO
Senior Engineer
RENAULT-NISSAN Automotive India Pvt Ltd.
Oragadam,
Chennai
Vehicle Assembly Production (TCF Assembly shop)
Assembly of passenger cars
Sep 2011 to till date
1
ROLES & RESPONSIBLITIES:
●Achievement of TCF Vehicle Assembly production SQCT targets
●Line Balancing and Job Allocation for Mixed model assembly
●Hourly monitoring of Main line output and OEE improvement
●Hourly monitoring of zone wise defects DPHU (defect per 100 unit) and reduce defect trend
●Analysis of Quality Complaints and implement countermeasures through QRQC, GK diagnosis and 3 GEN principles
●Preparation of Daily Production reports & review of OEE Gap analysis reports
●Progress Monitoring of CFT and QC circle projects
●Establish Vehicle repair & rework standards and Quality Reaction standard
●Improve Line Balancing through Assembly Process Elemental Analysis, Time & motion study, Job observation
●Preparation of Standard Operation sheets (SOS), Operation Requirement Table (ORT) and GK Control Items
●Establish Lean Production system concepts and Implementation of (Nissan Alliance Production Way) APW global GK standards
●Implement Uninterrupted Material flow systems on the main line
●Review of BOM and Creating Part specification codes
●New vehicle project Launch: Monitoring of ET, PT1, PT2 trial concerns and validation of Rout causes & Countermeasures
●Preparation of proto concerns reports and Rejection/Rework Costing reports during trials and implement the corrective & preventive action
●Co-ordinate with other departments and reviewing the quality concerns
●Handling of 4M changes & Layout design (DCN, Revision of BOM, and Revision of POS…)
●Prepare periodic Autonomous Maintenance schedule for Engine Docking Equipment, Undocking Lifter, Lifting Equipments.
●Implementation of Safety, quality, cost & OEE improvement kaizen
●Cost reduction by reducing wastage and consumption of consumables.
●Manpower handling and to maintain 5’S activities on the shop floor.
●To monitor & maintain product quality in manufacturing process as according SOP.
●To solve machine and Quality related problems.
●To prepare production report, check sheets for machine
●To fill up WIP report, hourly production reports.
●Involvement in continuous improvement through KAIZEN & POKA-YOKE activities.
●Analysis of wastage & it’s possible controls.
●Coordination with maintenance department for machine maintenance.
●Customer interaction to resolve the concerns on daily basis QRQC
PREVIOUS EMPLOYER:
Designation
Organization
Place
Discipline Area
Scope
Period
SI NO
Production supervisor – Assy.
NOKIA
India (P) Ltd
Sriperumbudur
Chennai
DSNM Mobile Phones Operations
Operations & Logistics
Dec 2007 To Sep 2011
2
Job Disciplines
Main Responsibility Areas:
-Manages and leads people/activities within one team (52 Operators).
-Has Key operators (Degree holders) as subordinates.
-Plans their Professional Development & Evaluates the performance of the team.
-Plans the resourcing and hires the people for a manufacturing shift.
Scopes & Impacts:
-Accountable for quality and accuracy of own output along with contribution to teamwork.
-Errors may have impact on function/project/customer.
Key Tasks:
-Administrating systems and reports daily activities.
-Implemented 4 kaizen for avoiding rejections, Mismatch & Safety.
-Maintaining Unit and module after the R&D phase.
-Makes decisions affecting own work within set parameters, elevates others. Reviews priorities with supervisor.
-Achieving Zero defect with effective CFT / New Project Implementation.
-Evaluate the people through RTVQ (real time visual qualification) for every models.
-Follow up the KPMT tool (Kanban production monitoring tool) for keeping materials ready for production.
-Monitoring the production through Real time monitoring & Cognos monitoring tool.
The Notable Accomplishment
Some of the successful stages, which made my employer gain enough confidence, are
-Involved in preparation of training of Operators/Key Operators,
-Key member in converting the Offline VAS activity into Online activity,
-Played a major role in implementing one piece flow/Lean System on Shop,
-Trained in Control Plan preparation & Involved in PFMEA preparation/implementation.
-
PREVIOUS EMPLOYER:
Designation
Organization
Place
Discipline Area
Scope
Period
SI NO
Operating Er
- MFG.
Axles India Ltd
Sriperumbudur
CNC Operation
Automotive
Industry
July’05
To Dec’07
3
Job Disciplines
Operating Engineer of the Production line - Responsible for
-Working in various type of CNC machines & Get the output by Train up the ITI holder.
-Achieving targets with 100% Utilization of Man power (ITI Holders).
-Achieving Zero defect with effective CFT members.
-Conducting training to operators 3C & 6S Implementation.
Following TPM, TQM, KANBAN, CPCK, Quality aesthetics and certifies.
Achievements
-Proved rejection PPM reduced by implemented hydraulic piston for holding components one more sides in Machining centre at CNC machining & drilling centre.
-Implemented POKE-YOKE system in PINION GEAR Assembly.
-Best Operating engineer reward for the Month of February ’09.
-Implemented & Maintaining TPM, TQM, 3C & 5S in Working Area.
COMPUTER FAMILIARITY
Good in MS – Office, AutoCAD 2010,Pro-E.
EDUCATIONAL QUALIFICATION
Qualification
Institution
Year
% Of Marks
S NO
Mechanical Engineering
SCSVMV University- Kanchipuram
2014
78.5%
1
Diploma in Production Engineering (DPE)
Thiagarajar polytechnic college – Salem
2005
94.5%
2
SSLC
Sindhi hindu hr. sec. school, Salem
2002
85.5%
3
PERSONAL DETAILS
Father Name : Mr. M.Jayamani.
Date of Birth : 24th May 1987
Marital Status : Married
Languages Known : English, Tamil
Permanent Address :F4,Abhi shrushti,Mahadevan nagar, IAF Road, Selaiyur, Chennai-600073
Mobile No : +91-893*******
DECLARATION
I hereby declare that I have given a true portrait of myself for your kind consideration. If I am provided with a chance to work for our Firm, I sublimely oblige that, I will perform my duties with sheer skill and sincerity.
Thank You,
With Regards,
J.KARTHIKEYAN.