Post Job Free

Resume

Sign in

Manufacturing Engineer Assembly Line

Location:
Kochi, Kerala, India
Posted:
May 03, 2021

Contact this candidate

Resume:

Rahul Surendran Manufacturing Engineer *

+919*********

adl36k@r.postjobfree.com

linkedin.com/in/rahulsurendr

Kerala, India

1.Profile Summary

Objective: To become a goal oriented and energetic team leader in motivating participants with enthusiasm and encouragement and demonstrate my meticulous administrative skill in manufacturing engineering for personal and company growth

Strengths: Leadership, goal oriented, strong-willed, creative, problem solver, fast learner

●M.E. (Tool Design) with 4 years of experience in supporting Product Development, New Product Introduction and Quality Assurance

●Hands-on experience in assisting suppliers in design, development and commissioning of Large Assembly lines, fixtures, Mould and Press Tools

●Strong abilities in creating/ reading/ interpreting engineering drawings

●Proven skills in enhancing production process and quality, optimizing resource & capacity utilization while curtailing costs & expenses

●Excelled at delivering projects following APQP & PPAP guidelines and productivity improvements through Lean Manufacturing

●Possess excellent communication, relationship management, team building and analytical skills

2.Academic Detail

Year

Degree

Institution

Grade

2016

M.E. Tool Design

Central Institute of Tool Design (Osmania University), Hyderabad

CGPA 7.60

2013

B.E. Mechanical

Sona College of Technology (Anna University), Salem

CGPA 8.12

2009

HSE

Jawahar Navodaya Vidyalaya, Kannur

% 82.80

3.Skill Set

Tooling & Machine Development

New Product Development

Process Improvement

Operation Management

Quality Control & Assurance

Auditing & Compliance

Risk Management

Lean Manufacturing

Six Sigma Methodology

Stakeholder Engagement

CAD/CAE software’s & SAP

Training

4.Certification & Training

Year

Certificate

Abbreviation

Institute

2021

Line Balancing – Timer pro professional (no certification)

Timer Pro

ACSCO

2020

Lean Six Sigma Black Belt

LSSBB

HCG Int.

2020

Design and Development of Medical Devices

ISO 13485:2016

Udemy

2020

Medical Device Risk Management

ISO 14971:2007

Udemy

2018

Safety Management Auditing Technique

SMAT

Whirlpool

2018

Certified QMS Internal Auditor

ISO 9001: 2015

DQS India

5.Work Experience

S. No

Organisation

Responsibility

1

Whirlpool of India, Pondicherry

*

(Jan’17 Sept’19)

*

Senior Tooling Engineer

(senior executive)

*

Division Process Engineering

*

Business Washing Machine

1.Developing, analysing and managing Manufacturing/ Assembly/ Automation Projects.

2.Engaging in creative problem solving to address operational issues including: ergonomic/ safety, efficiency improvements, process bottlenecks, quality concerns.

3.Manage projects to ensure efficient and cost-effective systems and processes to produce quality products.

4.Providing the application, procurement, processing, installation and capability for new equipment.

5.Providing manufacturing technical support in process control and internal certification.

6.Coordinating the purchase and application of machine tools, controls and related equipment to ensure the latest technology is being used to increase efficiency and economy of operations.

7.Implementing projects with standard APQP process, process flow, Layout design, PFMEA, control plan, work instruction and checklist.

8.Evaluate projects and prepare feasibility studies to define desired results, assess value proposition and determine project plans.

9.Improve space utilization in the shop floor.

10.Develop and implement assembly processes in line with Whirlpool standard processes.

11.Designing/ Develop tools and fixtures.

2

Rane Die Cast Limited,

Hyderabad

(May’16 Oct’16)

Manufacturing - Intern

Division Manufacturing

Business Automobile Pressure Die Casting parts

1.Die Design Kaizen & documentation (PTC Creo)

2.Casting flow analysing (Software – Adstefan)

3.Casting defects data collection

4.PPAP documentation support

3

Hyderabad Dies & Molds, Hyderabad

(Nov’15 Apr’16)

Tool Designer - Intern

Business Tooling design & Manufacturing

1.Injection Mould designing (Unigraphics NX)

2.Mould flow analysing (Software - Autodesk Moldflow)

3.Mould matching & trial

6.Reward & Recognition

Year

Award

Category

Organisation

2012

1st prize, National level

Best Computer Aided Engineering Report for Supra racing car competition (Role –Author, CAE Lead)

SAE India

2011

2nd prize, International level

Sustainable product design contest (educational catg.)

Solidworks Corp.

7.Reference

S. No

Personnel

Professional Detail

Contact Detail

1

Mr. Rajesh Ranjan

Six Sigma Coach,

HCG International

+91-932*******,

adl36k@r.postjobfree.com

2

Mr. K J Idhayachandar

Ex - Process & projects lead, GM-Production, Whirlpool Puducherry

+91-924*******, adl36k@r.postjobfree.com

3

Mr. Paresh Kumar Panigrahi

Manager Manuf. Engg.,

Ex-Rane group(now-BFL)

+91-828*******

Whirlpool Career Assignment in Detail

A.Problem Solving

Year

Problem Solved

Approach

Savings/ Year

2019

Reduction of Basket production rejections by 12%

PDSA

(Ishikawa diagram/ Kaizen - Poke-Yoke)

60.17 L

2018

Reduction of Cabinet Emboss Press Tool rejections by 14.5%

PDSA

(CAPA / Tooling correction)

72.2 L

2017

Reduction of drive insertion equipment rejections by 25%

DMAIC

(R&R/ Tooling correction/ SPC monitoring)

83.4 L

B.New Product Initroduction

Year

Project Type

Task

Highlight

2019

Top Load FA washing machine (Invertor - stain wash)

Process Flow Chart

Work Study (Method/ Cycle time)

PFMEA

Make vs Buy (identification, costing)

Work Instruction

Quality plan documents – Control Plan, In-Process-Verification-Plan, SMT Checklist

Nut runner & fixture facilitation

Work facility & Material handling

Low Cost Automation

Ensured first time right

Matched with regular productivity

2018

Top Load FA washing machine (stain wash)

Handled 30L on assembly line facilitation

2018

Kitting - Semi-Automatic w/m to South Africa

Process flow established with 70% of regular productivity

2017

Semi-Automatic w/m (Ace XL, Turbo dry)

Handled 15L on assembly line facilitation

C.

C.Process Gap Analysis & Improvement

Year

Project Type

Approach

Benefit

2018 – ‘19

Space utilization improvement at Packaging Area line 1

5S & JIT

(Layout change, Mezzanine floor, Assembly line extension)

Achieved 200%

2018

Productivity improvement at Top Load assembly line 2

5S & VSM

(Layout change, 8 waste elimination, out sourcing, LCA, Work balancing by Yamazumi)

Achieved 5%

Assembly line HC reduction 4%

2017 – ‘18

Productivity improvement at line 1 (Semi-automatic washing machine assembly line)

Achieved 14%

Assembly line HC reduction11%

Achieved record-breaking monthly production 1.5L

2017 – ‘19

Engineering change order

Documentation, facilitation, Quality assurance

53+ nos.

2017 – ‘19

Safety improvement

Kaizen

20+ nos.

D.COPQ Improvement

Year

Project Type

Approach

Benefit

2019

Finished Goods packaging

Preload-SPM implemented

Field strap failures 21%

2019

Motor to motor plate fastening assembly

Ergonomics improved/ New SMD-fixture/ Poke-Yoke by Electric Nut Runner

Assembly miss 1.5% and 100% SPC monitoring

2018

Motor pulley Nut fastening

New pulley / New Torque/ Ergonomics improved / SMD-fixture

Nut unfastening field failures 9.25%

E.Machine Development & Commissioning

Year

Machine

Tasks

Supplier

Cost

2019

Basket Grooving m/c

RFQ preparation

Design Verification of product & machine

Pre-acceptance checklist

Export/ Import doc handling

Stake holder Engagement

PPAP

PFMEA, Aspect-Impact, HIRA

Operator Training

Quality planning documents

Troubleshooting visits Support

Plantech, South Korea

0.11 M$

2018

Semi-Automatic Basket production m/c

Moss Alliance, Italy

2.35 M$

2018

Automatic Cabinet production m/c

Hana-Gns, S. Korea

2.88 M$

2017

Energy and Water Calibrating Test Rig m/c

Shikar Automation, Faridabad &

Mirhae Engineering, Pune

35L

2017 - ‘19

Weighing bridge 16x3, VVVF Panel 60/50, Genset 600, Compressor 300, Conveyor, Oil chiller 14KW

RFQ preparation, sourcing support

Utility Installation & Commissioning

1.28Cr

F.Audit & Compliance

Year

Internal Audit

Audited Function

2019

ISO 9001

Technology Centre

2018

ISO 9001

Human Resource Department

2018 - ‘19

Safety (SMAT)

Shop floor, JIT Bay, Hydrant Room

Revised Date: 26 Apr 2021 Faithfully, Rahul Surendran…



Contact this candidate