Post Job Free

Resume

Sign in

Power Plant Erection

Location:
Thoothukudi, Tamil Nadu, India
Salary:
30000
Posted:
April 30, 2021

Contact this candidate

Resume:

CURRICULUM VITAE

Contact. Nos.:

Cell No : 999-***-****

Home : 994-***-****

Personal Data:

DOB : 04.03.1974

Age : 46 Years

Sex : Male

Father’s Name: S.Subramanian

Nationality : Indian

Marital Status: Married.

Languages Known:

English & Tamil

Passport no. : R 9945229

Expiry : 23.04.2029

C License Details:

‘C’ license No: C 35759

valid up to : 04.11.2023

Issued by :Tamilnadu

Electrical licensing Board.

Total Experience:

18 Years in POWER PLANT.

(22 Years of Electrical

Experience in Total)

Objective

Seeking a challenging position involving development and implementation of my technical abilities in an environment, where I can grow along with the organization with great responsibility.

Nature Of Experience

Totally Twenty two years of working experience in Erection & commissioning in coal based power plant and waste heat recovery boiler (WHRB), steam Turbo Generator, LT&HT switchgears and all electrical accessories.

Education

DIPLOMA - Electrical & Electronics Engineering

Percentage 66.55 %

Sankar Institute of Polytechnic, Sankarnagar.

Tirunelveli.

S.S.L.C– GOVT Higher Secondary School, Tuticorin.

Percentage 83.6 %, Govt. High School.

SUBRAMANIAN.S

5N/446/1 NETHAJINAGAR,

TUTICORIN 628 008

Tamil Nadu, India

Email: adl2ck@r.postjobfree.com

. Mobile no : 822*******/ 999-***-****

Work Experience

previous Experience:

Name of Concern : Kumyang Electric Company,Abudhabi

Name of the Site : M/S Samsung Engineering Ltd,Abudhabi.

Location : CFP Project,Ruwaise.

Name of position : QC INSPECTOR (ELECTRICAL)

Duration : 10 months (From SEP 2019 to JULY 2018)

Preprevious Experience:

Name of Concern : QUESS CORP LTD, Chennai.

Name of the Site : M/S Sterlite Industries India Ltd,Tuticorin.

Location : 1 X 15 MW Power Plant, Vedanda group company, Tuticorin.

Name of position : SENIOR ENGINEER (ELECTRICAL)

Duration : 7 months (From OCT 2017 to May 2018)

Preprevious Experience:

Name of Concern : OPERATIONAL ENERGY GROUP LIMITED, Chennai.

Name of the Site : IND-BHARAT POWERGENCOM INDIA LIMITED, Tuticorin.

Location : 3 X 63 MW (189 MW) STEAM TURBINE GENERATOR POWER PLANT

Name of position : ENGINEER (ELECTRICAL)

Duration : 7 Years (6 Years 10 months) (From August 2010 to OCT 2017)

Preprevious Experience:

Name of Concern : HOFINCONS INFOTECH INDUSTRIAL LIMITED, Chennai.

Name of the Site : STERLITE INDUSTRIES INDIA LIMITED, Tuticorin.

Location : 1 x 15 MW STEAM TURBINE GENERATOR POWER PLANT

Name of position : ENGINEER (ELECTRICAL)

Duration : 3 Years 3 months (From August 2005 to Nov 2008 )

Preprevious Experience:

Name of Concern : MICROTEC ENGINEERING CONTRACTORS, Tuticorin.

Name of the Site : STERLITE INDUSTRIES INDIA LIMITED, Tuticorin.

Job Nature : Erection & Commissioning of STG POWER PLANT & WHRB Plant.

Name of position : TECHNICIAN (ELECTRICAL)

Duration : 3 Years 6 months (From Jan 2002 to June 2005 )

Preprevious Experience:

Name of Concern : M/s Sakthi contractors, Tuticorin.

Name of the Site : KILBURN CHEMICALS LIMITED, Tuticorin.

Job Nature : Maintenance work.

Name of position : TECHNICIAN (ELECTRICAL)

Duration : 3 Years 1 months (From August 1998 to Sept 2001 )

Preprevious Experience:

Name of Concern : Siva Guru Enterprises, TTPS. Tuticorin

Name of the Site : Tuticorin Theramal Power Station, Tuticorin.

Location : 5 X 210 MW Tuticorin Thermal Power Station.

Name of position : SUPERVISOR (ELECTRICAL)

Duration : 1 Years 6 months (From Jan 1996 to JULY 1997)

First Experience:

Name of Concern : Kumar Enterprises, Tuticorin.

Job Nature : Erection of 230 KV Switch yard, Tuticorin

Name of position : SUPERVISOR (ELECTRICAL)

Duration : 6 Years ( April 1993 to Mar 1996 )

Roles & Responsibilities:

Erection and commissioning of Turbine Generators up to 70 MW .

Maintenance of several types Protection Relays& circuits (Digital& Analog). In the make of AREVA, ALSTOM, MICOM RELAYS, GE RELAYS.

Erection and commissioning of 230 KV Switch yard with 7 Nos. of BAYS with station traformer.

Erection and commissioning of SF6 breakers upto 2000Amps, Vacuum Circuit Breakers

up to 3150 Amps and Air circuit breakers up to 4000 Amps.

Erection and commissioning of All LT and HT Electrical motors (AC &DC).

Erection and Control maintenance of Nitrogen Fire Fighting System of Transformers.

Erection and commissioning of Transformers up to 90,000KVA (90 MVA).

Maintenance of D-O-L, Star-delta, Soft Starters with DCS controls.

Erection and Maintenance and Service of VFD Drives With Remote control..

Good knowledge of Electrical drawings.

Good knowledge of Preparing Job Planning for Run time and shutdown time.

Good Knowledge in Preventive Maintenance Inspection of Electrical Equipments.

Overhauling & Maintenance of Several Type of Motors.

Power & control wiring for all types of starters & Panels.

Quick Learning ability of complicated drawings and circuits.

Provide effective and efficient service to you.

Achievements & Awards:

Successfully Dismantled & Fault Rectification was done in VACON Make 690 Volt, 800 Amps VFD Drive and its Running now successfully after the Rectification of ASIC board, Rectifier Module, IGBT Module, Cooling Fan Control Board.

Awarded by STERLITE INDUSTRIES for Dedicated job in 17,000 KVA Generator Transformer including NGR. ( VEDANTA CERTIFICATE ATTACHED)

Successfully Erected a 17,000KVA (17 MVA) Transformer for 14.5 MVA Generator Protection.( working as a Barrier Transformer between the Grid and Generator)

Protection Circuit control wiring was done & Drawings submitted to STERLITE INDUSTRIES for the TRANSFORMER.

Erection and commissioning was Done for CTR Transformer Fire Protection system with Nitrogen cooling system.

Successfully commissioned Auto synchronizing relay (VA TECH) with check synchronizing relay.

Co-operated in Testing of Transformer with T&R (Transformers & Rectifiers) testing Engineers.

Co-operated in Testing of Metering & Protection equipments (Generator protection relay, frequency protection relay, CT, PT, Lightning arrestor, VCB, etc.,) with Power Consultant Engineers & AREVA Testing Engineers.

Planning was done for Annual shutdown and completed the Jobs as per the planning in 2006 & 2008, and Breakdown Maintenance was done properly in Sterlite industries Power plant.

Planning was done for Annual shutdown and completed the Jobs as per the planning in 2010 & 2012, and Breakdown Maintenance was done properly in IND-BHARATH Power plant.

Declaration

I here by declare that all the information mentioned above is true to the best of my knowledge.

Yours Sincerely,

Date : 16.04.2021

[S.SUBRAMANIAN]

Place : Tuticorin.

-



Contact this candidate