Resume:

RESUME

RAMESH P

Andal illam E-mail: adl1qq@r.postjobfree.com

1.C Brayant nagar 9th Street West Skype ID: ramesheee2009 Tuticorin-628008 Mobile : -

Tamilnadu, INDIA. India : +917*********

Abu-Dhabi : +971-*********

POST APPLIED FOR SENIOR ELECTRICAL ENGINEER

CAREER OBJECTIVE

To involve and work in your concern as much as I can and to utilize the level best of my capacity towards productivity, thus producing the highest results. And also I wish to work as a team in a challenging environment and demonstrate high commitment to achieve milestone.

EXPERIENCE (Over Eight Years in relevant field)

Total Experience from Current Job

Company : Tecnimont Pvt Ltd

Period : 03-May-2019 to Still date

Position : Senior Engineer – Electrical

Project : ADNOC Takreer Crude Flexibility Project (CFP) Area : Ruwais – Abu-Dhabi

Client : ADNOC Takreer Refinery Abu-Dhabi

Company : Tecnimont Pvt Ltd

Period : 26th May 2017 to 02nd May 2019

Position : Senior Engineer – Electrical

(Sub-Station In-charge for main Process Plant)

Project : ADNOC-Crude Process Plant (CPP), Al-Dhabbiya Phase-III Surface Facilities Project- Abu Dhabi

Client : ADNOC Onshore & Offshore, Abu-Dhabi

Company : Tecnimont Pvt Ltd

Period : 10th February 2015 to 25th May 2017

Position : Senior Engineer- Electrical

(DHDT Plant & Process Plant Sub-Station Operation & Construction in-charge)

Project : BPCL IREP (Integrated Refinery Expansion Project), Kochi. Client : BPCL, Kochi, Kerala.

Company : Tecnimont Pvt Ltd

Period : 1st August 2013 to 31st December 2014

Position : Electrical Engineer

Project : 1200 MW DGEN MEGA Power Plant. Dahej, Gujarat Client : Siemens Germany

Company : Tecnimont Pvt Ltd

Period : 20th January 2012 to 31st May 2013

Position : Electrical Engineer

Project : Delay Cooker Unit (DCU), Mangalore, Karnataka. Client : ONGC Petrochemical Ltd

Company : Tecnimont Pvt Ltd

Period : 21September 2011 to 20th January 2012

Position : Electrical Engineer

Project : Cooker Hydro Treating Unit (CHTU)

Client : ONGC Petrochemical Ltd

Over View of my Carrier:

Construction, Commissioning & Maintenance Work:

I am working as Senior Electrical Engineer in Tecnimont Pvt Ltd from Sep-2011 to Still Date totally 8 Years 3 Months Experience in Various Projects including UAE. I having a much experienced in Construction, Commissioning, Shutdown Maintenance Job, & Tie in Jobs. Currently I am working under ADNOC Refinery Projects, as a Subcontractor for New Crude Flexibility Project, located in Ruwais.

JOB RESPONSIBILITIES:

Maintenance:

Preparing the Schedule for Shutdown Works and to identify the Pre-shutdown activity.

While Plant Operation Monitoring the Peak Load of the transformer & Switchgears.

Ensuring the Permit before start the activity.

Spare material inventory list monitoring & suitable material ordering as per requirement before the shutdown activity start-up.

Monitoring the load current of each transformer and switchgears.

Obtain LOTO system before starting the maintenance work.

Battery & UPS charger monitoring on Daily Basis (any interruption or Tripping, & Acid Level).

HV Switchgear Voltage Fluctuation Recording and taking the right action to reduce the fluctuation.

Field Motor Winding Temperature, Bearing Temperature monitoring, Motor Speed & Noise Test.

Assigning a Group for Greasing of Pump and Motor bearing.

Field Lighting circuit fault identification & rectification.

Earth resistance value checking in certain period of interval. Construction

Preparation of Method Statement (MS), Job Safety Analysis (JSA).

Preparation Material Approval Request (MAR) for Project Material.

Preparation of Material Request for Procurement Department.

Verifying the drawings and Estimate the project Quantity.

Technical Bid Evaluation for Project Material.

Cost Bid Evaluation as per the project Budget.

Manpower Requirement & allocation in priority basis.

Executing the Cathodic protection system for underground pipes, storage tanks & Concrete Structure as per the vendor standards

Installation of Power Transformer & Distribution Transformer & Generator & oil Filtration for transformers.

GIS Panel Installation & HV, LV Panel Erection, Battery Bank Installation and Commissioning.

Bus-Duct Installation.

Monitoring of Earthing & Lightning Works.

Power cable laying based on cable schedule and trench section drawings

Power cable termination for panels & motors

Installation of DCS panels, Instrument cable laying and termination

Installation of instruments

Carry out inspection on installation, testing of various equipment’s in Sub-Station and Distribution system

Plant lighting (Indoor, Outdoor) works as per the hazardous classification

Co-ordinate internal and client inspection for completed jobs

Doing the Loop tests for motorized valves and other electrical circuits

Splicing of FO cables.

Tracing the faults in control circuits.

Commissioning of Transformer, Panels, Lighting Circuits and Motors. RESPONSIBILITY IN CURRENT JOB (ABROAD):

THAKREER, RUWAIS (RRW) - CRUDE FLEXIBILITY Project- ABU DHABI. My responsibilities in this project as Senior Electrical Engineer to Estimate & Control the project cost. Also Preparing the Material Request and getting the Quotation from the vendor and to confirm the material specification’s meeting the project requirement & Finalising the Supplier and Evaluating the Technical Bid Document and generating the Purchase Order through our Procurement Team. Total Cost of the project value is $72 Million Dollar USD /-

As a Construction Point of View, recruiting a competent person through the interview and assigning the job in a right position and monitoring his performance through the progress achievement. As a Senior Engineer I monitoring a weekly progress and Monthly Progress achievement against the Planned Qty and I getting a good Productivity in my Project.

Projects Handled in (ABROAD):

1)THAKREER, RUWAIS (RRW) - CRUDE FLEXIBILITY Project (03-May-2019 to Till Date) Total Cost of the project value is $72 Million Dollar USD /-. Scope of this project Erection of the transformer 44 No’s, Generator- 4No, &Testing, Commissioning of the transformers and generators Total Steel erection of this project is -76 Ton & Cable Laing of HV, LV & control Cables-2283 KM & PA System, Fire Alarm & Smoke Detection. Also Commissioning Activity for Smooth start up.

2) Al-Dabbiya Surface Facilities Phase III CENTRALISED PROCESS PLANT.

(26-May-2017 to 2-May-2019)

Total Cost of the project value is $69 Million Dollar USD /-. Scope of this project included Main Process Plant & 15 No Onshore Clusters and 6 Power Skid and Water Wells.

Major scope of the Project Erection of the transformer 64 No’s, Generator- 2No,

&Testing, Commissioning of the transformers and generators, 220/33kv GIS Erection & 15 no HV VSD Panel & VSD Transformer Erection, Bus Duct Erection & Total Steel erection of this project is - 89 Ton & Cable Laing of HV, LV & control Cables-2179 KM

&750 no’s on Motor Solo Run & Plant Commissioning with Vendor as a Assistance. Projects Handled in (INDIA):

3) BPCL IREP (Integrated Refinery Expansion Project), Kochin Refinery Phase III Project

(11- Feb-2015 to 25-May-2017)

Total Cost of the project value is $30 Million Dollar USD /-. Scope of this project included 5 Units, CDU – VDU, DHDT, VGO, DCU, FCCU. As a Senior Lead Engineer for DHDT Unit (DELAY COOKER HYDRO TREATING UNIT) performed below scope of work.

Major scope of the Project Erection of the transformer 52 No’s, &Testing, Commissioning of the transformers, 4 no HV VSD Panel & VSD Transformer Erection, Bus Duct Erection & Total Steel erection of this project is - 92 Ton & Cable Laing of HV, LV & control Cables-1522 KM Light Fixture installation around -5400 no’s &520 no’s on Motor Solo Run & PA system installation & Commissioning, also Plant pre- Commissioning with our Testing Team.

4) 1200 MEGA WATTS DGEN MEGA POWER PLANT SIEMENS GERMENY. DAHEJ, GUJARATH (1st August 2013 to 31st December 2014)

Total Cost of the project value is $42 Million Dollar USD /-. Scope of this project included 3 x 400 MW Power Plant.

The Main Source of the Power Plant is GAS by using this GAS Turbine & Steam Turbine Generators a Power and it is transmitted to the Grid System, I am as a Senior Lead Engineer for One Unit -503 performed below scope of work. Major scope of the Project Erection of the transformer 2 No’s, &Testing, Commissioning of the transformers, & IPBD Bus Duct Installation,& Cable Laing HV, LV & control Cables of around 700 Kilometres and also glanding termination of HV Motor, Dry Type Transformers and also Raising RFI and interacting with client to resolve the issues .and Earthing Work and Punch Point Closing.

5) Delay Cooker Unit (DCU), ONGC MRPL, Mangalore, Karnataka. 20th January 2012 to 31st May 2013

Total Cost of the project value is $15 Million Dollar USD /-. Scope of this project included DCU.

As a Lead Engineer for DCU Unit (Delay Cooker Unit) performed below scope of work. Major scope of the Project Erection of the transformer 12No’s, &Testing, Commissioning of the transformers, 2 no HV VSD Panel, & Total Steel erection of this project is - 51 Ton & Cable Laing of HV, LV & control Cables-400 KM Light Fixture installation around - 1800no’s &260 no’s on Motor Solo Run & PA system installation & Commissioning, also Plant pre-Commissioning with our Testing Team as a Team Work. 6) Cooker Hydro Treating Unit (CHTU), ONGC, MRPL, Mangalore, Karnataka.

(21September 2011 to 20th January 2012)

Total Cost of the project value is $28 Million Dollar USD /-. Scope of this project included CHTU

As Lead Engineer for CHTU Unit (Cooker Hydro Treating Unit) performed below scope of work.

Major scope of the Project Erection of the transformer 18No’s, &Testing, Commissioning of the transformers, 2 no HV VSD Panel, & Total Steel erection of this project is - 80 Ton & Cable Laing of HV, LV & control Cables-820 KM Light Fixture installation around - 2300no’s &320 no’s on Motor Solo Run & PA system installation & Commissioning, also Plant pre-Commissioning with our Testing Team as a Team Work. ACADEMIC CREDENTIALS:

Bachelor of Engineering in Electrical and Electronics Engineering. (B.E) Anna university Tiruchirappalli

Theni Kammavar Sangam College of Technology – Theni Year -2008-2011. Class: First Class

Diploma in Electrical and Electronics Engineer. (D.E.E.E) State Board of Technical Education, Chennai.

J.A.C.S.I Polytechnic College – Nazareth.

Year: 2005-2008 Class: First Class with Honours.

Equivalency Certificate:

Also, I am obtained Equivalency for both Bachelor Degree & Diploma Certificate in Electrical & Electronics Engineering for UAE.

Driving Licence:

Applied for UAE Driving Licence:

File no: 316*********

Applied Date: 16-10-2019.

India Driving Licence (Tamilnadu):

D.L.No : TN69 201********

Expiry date: 08-09-2030

IT SKILLS:

MS- Project

Excel Basics.

PERSONAL DETAILS:

Date of Birth : 04-07-1990

Marital Status : Married

Nationality : INDIAN

PASSPORT DETAILS:

Passport Number : J6946771

Place of Issue : Madurai

Date of Issue : 05-08-2011

Date of Expiry : 04-08-2021

DECLARATION

I hereby declare that the details mentioned above are true to the best of my knowledge and belief.

Place : Thoothukudi Signature

Date :

(RAMESH PETCHIRAJ)

201925221-1184645 : الرقــم

التاريخ :

)معادلة درجة علمية(

م . ش / ٢٩٩٧/٤٣ / م ع / ٢٠١٩

٢٠١٩/١٠/٢٩م

رقم المستند

رقم التحقق 724434

قررت لجنة معادلة الشهادات بوزارة التربية والتعليم معادلة الشهادة التالية تفاصيلها : Bachelor of Engineering in Electrical and Electronics : اسم الشـــــــــــــــهادة Engineering

Anna University : المؤسسة المانحـــــة

Tiruchirappalli -

بلــــد الدراســــــــــــة : جمهورية الهند

Ramesh Petchiraj

//بالدرجة العلميــــــــــة: بكالوريوس في الهندسة تخصص الهندسة الكهربائية واللكترونيات الصادرة باسم السيد /

وقد أعطيت له هذه الشهادة بناء على طلبه دون أن تتحمل الوزارة اية مسؤولية تجاه الغير.

- استوفيت الرسوم على طلب المعادلة .

- كل كشط أو تغيير في هذه الوثيقة يلغيها .

- المعادلة لغرض الستعمال داخل دولة المارات العربية المتحدة . ملحظة:

أسماء أحمد الجابري

مدير إدارة معادلة الشهادات

ل تعتبر المعادلة صحيحة إل بعد تدقيق صحة كامل البيانات الواردة فى هذه المعادلة من قبل الجهة المستفيدة من خلل الدخول على www.moe.gov.ae :الرابط التالي



Contact this candidate