P.SHUNMUGARAJAN,
adl0he@r.postjobfree.com, adl0he@r.postjobfree.com
To accept the challenges and to execute them efficiently by using my skills and abilities to the best of my knowledge. To work for an esteemed organization and in competitive environment. This would contribute toward my professional and personal growth. Course
Board / University
School / Collage Year % age / class
S.S.L.C State board Sri Ramakrishna
High School,
Tisaiyanvillai
1989 -
1990
89
D.E.E.E Tamilnadu State
Board
Sankar Institute
of Polytechnic,
Tirunelvelli
1990 -
1993
80
PLC
Programming
Directorate of
Technical
Education
PSG College
Coimbatore
2001
PROFESSIONAL OBJECTIVE:
ACADEMIC PERFORMANCE:
Company Name
Designation
Duriation
Indian navy station.
INS Kattabomman
Switch Board operator Apr 1993 to Aug 1994
India dying mills,
Erode
Electrical supervisor Nov 1994 to Feb 1995
Electrical control
corporation,
Coimbatore
Electrical supervisor Feb 1995 to Jan 1998
Flow link systems P
Ltd, Coimbatore
Senior Engineer-
Maintenance
Feb 1998 to Nov 2007
Lakshmi Ring
Travellers Cbe Pvt
Ltd, Coimbatore
Asst. Manager Maintenance Nov 2007 to 25.03.2021
Activities in Electrical controls Corporation, Coimbatore ( Industrial electrification contractor and electrical consultancy)
Erection of 22KV/11KV transformer yard
Erection of in door and outdoor transformer
Erection of MV panel
Erection of Generator
Erection of Generator control panel
Erection of capacitor bank
Erection of VCB
Erection of SSB, DB and MCCs
EXPERIENCE DETAIL:
JOB DESCRIPTION
Erection of earth electrode
Installation of office equipments
Erection of Textile machinery
Erection of Foundry machineries
Electrification of food processing machinery
Electrification of hotel equipments
Design of lighting circuits
Design of earthing systems
Design of panel boards and installation
Design of cable selection for various loads and machinery
Design of lightning arrestor.
Activities and achievements in Flow Link Systems
Planning and Execution of preventive maintenance work
Follow up of daily maintenance work.
Maintaining records for daily, monthly power consumption in Foundry.
Monitoring Execution of daily, weekly, fortnightly, monthly, Quarterly, yearly maintenance as the per the instructions given in the manual.
Raising of indents for spares and consumables
Arranging for service from machine suppliers/Manufactures when required by us for Machine service and machine up gradation.
Follow up of materials send for servicing outside by us.
Preparing minutes of meeting when breakdown attended by Service Engineer.
Co- Ordination with service Engineers during machine installation and service.
Following the regular consumables in machines.
Giving instructions to sub-ordinates to attend the electrical problems.
Replace of defective / worn out electrical parts as precautionary measure.
Maintaining machine history card for each machine
To attend the erection & breakdown of all plant machinery& equipment of foundry
Maintaining power supply in foundry
Maintaining power house MV panel, Gen Set, Control panels, Transformers, AC, and UPS.
Telephone and EPABX maintenance work
Pollution control board related field works.
Statuary equipments testing and certification follow up work.
TNEB liaison work .
Department related ISO documents and other data entry works.
House keeping in their area of activities.
o Installation of Induction melting furnace
o Installation of sand mixer
o Installation of air compressor and related pipe line work o Installation of knockout and sand reclamation machine o Installation of heat treatment furnace
o Installation of shot blast machine
Achievements in Flow Link Systems
o Execution of 1000KVA power capacity machine shop up to production o Electrical design of machine shop
o Panel and cable design of machine shop
o Lighting design of machine shop to get 250Lux
o Design and fabrication of CO2 mould crusher
o Design and fabrication of skip charger
o Cost cutting by preventive maintenance
o Cost cutting in air compressor by arresting air leakage o Electrical motor loss controlled by providing load side capacitor o Power loss controlled by optimizing the transformer secondary voltage by OLTC Activities Lakshmi Ring Travellers Cbe Ltd
Planning and Execution of preventive maintenance work
Follow up of daily maintenance work.
Maintaining records for daily, monthly power consumption in Foundry.
Monitoring Execution of daily, weekly, fortnightly, monthly, Quarterly, yearly maintenance as the per the instructions given in the manual.
Raising of indents for spares and consumables
Arranging for service from machine suppliers/Manufactures when required by us for Machine service and machine up gradation.
Follow up of materials send for servicing outside by us.
Preparing minutes of meeting when breakdown attended by Service Engineer.
Co- Ordination with service Engineers during machine installation and service.
Following the regular consumables in machines.
Giving instructions to sub-ordinates to attend the electrical problems.
Replace of defective / worn out electrical parts as precautionary measure.
Maintaining machine history card for each machine
To attend the erection & breakdown of all plant machinery& equipment of foundry
Maintaining power supply in foundry
Maintaining power house MV panel, Gen Set, Control panels, Transformers, AC, and UPS.
Telephone and EPABX maintenance work
Pollution control board related field works.
Statuary equipments testing and certification follow up work.
TNEB liaison work .
Department related ISO documents and other data entry works.
Coordination of 5S implementation work
Coordination safety implementation work
Coordination of Kaizen implementation work
Omega moulding machinery maintenance.
House keeping in their area of activities.
o Installation of Induction melting furnace
o Installation of sand mixer
o Installation of air compressor and related pipe line work o Installation of knockout and sand reclamation machine o Installation of heat treatment furnace
o Installation of shot blast machine
o Fabrication of mould boxes
o Fabrication of horizontal type pattern storage racks o Fabrication of vertical type pattern storage racks o Fabrication of vacuum champers for vacuum molding o Fabrication and installation of MS sodium silicate over head tank o Installation of omega moulding machinery
Achievements in Activities Lakshmi Ring Travellers Cbe Ltd o Execution of 500KVA power capacity textile ring traveller plant up to production o Electrical design textile ring traveller plant
o Panel and cable design textile ring traveller plant o Lighting design to get 250Lux using induction lamp o Diesel consumption reduced in ladle pre heater by cleaning the diesel nozzle maintenance
o LPG consumption reduced in molding coating burner by nozzle maintenance o Electrical power saved in stopper rod oven by thermal sealing o Control the liquid metal by fixing crane weigh scale. o Design and fabrication of sand sieve
o Cost cutting by preventive maintenance
o Cost cutting in air compressor by arresting air leakage o Electrical motor loss controlled by providing load side capacitor o Power loss controlled by optimizing the transformer secondary voltage by OLTC o Control the pattern shop dust by installing dust collector o Cost saving by implementing air compressor loading unloading pattern o Cost saving by installing VFD in air compressor
Name P.SHUNMUGARAJAN
Fathers Name R.Periyasamy,
Permanent Address 11. Sri Sudalai Andavar Koil St, Tisaiyanvillai,
Nellai Dt,
Pin 627 657.
Contact Address P.Shunmugarajan,
7/75C1 Lakshmi Gardens,
Near LMW Foundry,
Uthupalayam, Arasur Post
Coimbatore 641 407.
Personal Data Date of Birth : 01.05.1975
Age : 45
Sex : Male
State of Domicile : Tamilnadu
Nationality : Indian
Marital Status : Married
Two female child
Passport No R4439734 Valid up to 24.10.2027
C License No C 21835 Valid Up to 14.04.21
I here by declare that all the above furnished details are true to the best of my knowledge.
P.SHUNMUGARAJAN
PERSONAL DETAILS
DECLARATION