STEPHEN TOLULOPE OMILABU (PMP)
Contact Details
Cell no: +234 706-***-**** / Email: adl0f9@r.postjobfree.com Address
6B, Alake lane, Ojota, Lagos
EDUCATIONAL BACKGROUND
YEAR SCHOOL ATTENDED QUALIFICATION
2020 National Teachers Institute (NTI) PGD, Education 2017 Federal School of Surveying, Oyo, Oyo State PGD, Geographic Information System
(GIS)
2016
University of Ibadan, Ibadan, Oyo State MSc, Structures and Materials Engineering 2012 Federal University of Agriculture Abeokuta, Ogun State
B. Eng., Civil Engineering
2006 Sped International Secondary School, Oyo, Oyo State SSCE CAREER CHRONICLES
DATE COMPANY PROJECT ROLE RESPONSIBILITIES
Jan’ 2020
– till date
Ibile
Broadband
Limited
Project 1:Lagos State Rice Mill
Project- Provision of ICT
Infrastructure
Key Project Deliverables
• Installation of ELV system at the
Administrative building, Service
building, factory buildings and
warehouses (FGS, RM, Main)
• Provision and configuration of
computers and printers
• Erection of 60m communication
tower and provision of internet
Project team Lead • Define strategic plans,
roadmaps, and priorities for
the team.
• Leads meetings and manage
project team (and vendor) to
execute work and achieve
deliverables with the aid of
Microsoft Project software.
• Managing relationship and
communication with project
stakeholders, Line manager
(project sponsor), project
team, and vendors
• Preparation and presentation
of project progress reports to
project Stakeholders using
Microsoft office applications.
Stephen Tolulope OMILABU is a process-oriented high achiever with highly developed spatial intelligence committed to providing high quality and efficient solutions to environmental and engineering challenges with practical experience in Project Management, Construction Contract Management and Geographic Information Management.
Page 2 of 5
• Led Project Team to carry out
Audit of LASEMA (Push-to-
talk) Digital Communication
Network project sites and
presented findings to the
Management.
Sept ’17
– Dec’
2019
CIBA
Construction
Company Ltd.
Project 1: Lagos Bus Services Ltd
(LBSL) Bus Reform Project:
Development of Depot, Oshodi
(2017 – 2019)
Key Project Deliverables
• Rehabilitation of the Central
Workshop, and demolition works
• Construction of Depot Offices,
Franchise building, Gate house,
Utility building, external toilets, and
supply of office furniture
• Construction of perimeter fence
• Construction of drainages and roads
• Construction of diesel dispensing
canopy, underground diesel storage,
33,000 litres elevated braithwaite
water tank, underground water
tank, water treatment plant,
industrial borehole, and elevated
bus wash.
• Supply of two 500kVA generators,
transformers, installation of fire
hydrants, and other M/E
installations
Project 2: Lagos State 32 Metric
Tons/hour Rice Mill Project, Imota
(2017 – to date)
Key Project Deliverables
• Phase 1: Site preparation and
demolition works, Earthworks (cut
and fill), construction of Main
Warehouse building, concrete roads,
and drainages, retaining walls,
external perimeter fence, Drill tower,
and Fire station building.
• Phase 2: Construction of Finished
Goods Storage, Rice Mill, Service
building, Plinths, pile foundations and
RC silo bases (16), Dryers (parboil
and harvest), Hot water tank base,
Boiler, Husk yard, Effluent Treatment
Plant, Administrative building, VIP
building, Staff quarters, RC water
Contract
Management
Team (CMT) Lead
• Led the CMT to solicit for bids,
select vendors, define
contracts, and ensured that
contract specifications are
met.
• Managed RFIs, change
requests and other project
documents.
• Led the Project Team to
prepare the Project
Management Plan and created
baselines.
• Managing, Monitoring, and
Controlling project execution
with the aid of Microsoft
Project software.
• Prepared and presented Bi-
monthly project progress
reports using Microsoft Office
applications, and monthly
reports on status of project
deliverables to the project
Stakeholders
• Managed relationship and
communications between
project team, technical
consultants (FAO and Buhler)
and other stakeholders. All
information was
systematically stored for easy
retrieval.
• Closing of completed project
phases.
Page 3 of 5
tanks, Trailer park; supply of 500kVA
generators (2), LT & HT Panels, 11 KV
transformers; installation of fire
hydrants, industrial boreholes, and
street lights
Project 3: Lagos State Industrial
Park Project (2018 – to date)
Key Project Deliverables
• Construction of 42 number
Warehouses
• Construction of RC roads and
drainages.
• Construction of Administrative
building, Clinic, Restaurant, Gate
house
• Construction of overhead braithwaite
water tank
Jan ‘16 –
Sept ‘17
HYDROARK
International
Ltd
Project 1: Nigerian Gas Company
(NGC): Survey and Engineering
Design of Ajaokuta – Obajana – Oben
Pipeline Right of Way (ROW)
Erosion Control Project (2016)
Key Project Deliverables
• Survey of NGC pipeline ROW
• Mapping of the pipeline ROW
• Presentation of information using
DTMs for engineering design
purposes
• Design of erosion control structures
for critical areas
Project 2: Newcross Exploration and
Production Ltd: Mapping of Oil
Delivery Lines, Portharcourt (2017)
Key Project Deliverables
• Survey of oil delivery lines (Ekulama
1 & 2, Awoba fields)
• Mapping of oil delivery lines
• Information presentation and closing
Project 3: SHELL Petroleum
Development Company of Nigeria
(SPDC): Mapping of Alero Creek,
Opuama, Delta State (2017)
Key Project Deliverables
Project
Administrator/GIS
Consultant
• Preparation of Project
Implementation Plans and
documents
• Directing project execution,
managed communications,
resolved issues within the
project team.
• Coordinated project progress
meetings, and managed risks
and changes to project plans.
• Prepared and presented
project status and variance
reports using Microsoft office
applications.
• Prepared and presented
project reports and designs to
the clients using Eiva marine
solution software, Power
point, ArcGIS, ERDAS
IMAGINE, Google earth, and
Surfer software.
• Prepared documents for
project closing.
Page 4 of 5
• Data collection and Mapping of Alero
creek
• Presentation of information to client
and closing
June ‘14
– Mar ‘17
JEHOGO AND
SAMSON
Associates
Project 1: Baptist College of
Theology: Construction of skill
acquisition building and school
chapel, Oyo (2015)
Key Project Deliverables
• Substructure works
• Construction of the frame structure
Project 2: Deeper Life Ministries:
Construction of Oluyole district
headquarters, Oluyole, Ibadan
(2016)
Key Project Deliverables
• Building substructure works
• Superstructure works
Project 3: Construction of 5-
bedroom Bungalow at Oyo State Low
Cost Housing Estate, Ojongbodu
(2016)
Key Project Deliverables
• Preparation of Survey document and
project design documents
• Site preparation and sand filling
• Substructure works
• Superstructure works
• Finishing
• Landscaping and external fence
Project 4: Construction of 5-
bedroom (All rooms en-suite)
Bungalow at Oko-Oba, Oyo (2016)
Key Project Deliverables
• Site preparation and earthworks
• Substructure works
• Superstructure works
• Finishing
• Landscaping and external fence
Project Manager/
Project Engineer
• Project planning, directing
project execution, controlling,
and monitoring, and project
closing.
• Managed communications
with vendors, chaired kick-off
meetings with project team,
and reported project progress
to stakeholders.
July ‘12 –
Oct ‘12
ADVANCED
ENGINEERING
CONSULTANTS
(AEC)
Ilupeju, Lagos
Project: Lagos Metropolitan
Development and Governance
Project (LMDGP)- (Financed by
World Bank Group): Road
Construction and Rehabilitation,
Resident Civil
Consultant
Engineer
• Quality control of project
deliverables.
• Project progress reporting
• Interpretation of plans and
specifications to project
Page 5 of 5
Ijeshatedo/Itire Communities
(Adeola, Araromi, Sarumi, Baruwa,
Itire, and babatunde streets)
contractors
• Project schedule and risk
management
March
‘11 –
Sept ‘11
DANGOTE
CEMENT
WORKS Ltd
(DCWL)
Ibese, Ogun
State
Project: Construction of Cement
Plant with installed capacity of 6
Million Metric Tonnes/Annum:
Phase I, Ibese
Key Project deliverables
• Construction of concrete silos using
slip forming
• Construction of rigid pavements and
drainages
• Construction of industrial buildings
(MCC, CCB etc)
• Construction of rotary kiln, water
towers and warehouses
• Rehabilitation of Ibese – Ilaro asphalt
road
Intern • Quality assurance and control
• Ensuring compliance with
safety regulations
• Work progress documentation
and reporting to the Project
Manager
• Managed the contractor to
execute rehabilitation of Ibese
– Ilaro asphalt road
July ‘10 –
Oct ‘10
NIDAVE
Construction
Company
Ibadan, Oyo
State
Project: Construction of 2500-seater
auditorium for Federal University of
Agriculture, Abeokuta
Intern
• Supervision of construction
works
• Ensuring compliance with
safety regulations
PROFESSIONAL MEMBERSHIP
2014 Till date NIGERIAN SOCIETY OF ENGINEERS (NSE) G16622 2014 Till date NIGERIAN ENVIRONMENTAL SOCIETY (NES) Associate member 2013 Till date NIGERIAN INSTITUTE OF MANAGEMENT (NIM) 206-***-**** Till date PROJECT MANAGEMENT INSTITUTE (PMI) 6321137 AWARDS
• FUNAAB Vice Chancellors’ Inter-Collegiate Competition: Silver Medal in Chess Team category (2011)
• Federal School of Surveying: Overall Best Graduating Student in Postgraduate Diploma (Geographic Information System - 2015/2016 Session). OTHER CERTIFICATES AND TRAININGS
• Health and Safety Practices in Construction Industry (LAFARGE Africa PLC) - 2018
• Proficiency Certificate in Management (Nigerian Institute of Management) – 2013
• Project Management Institute Nigeria: PMP Exam Boot Camp – 2020
• Project Management Institute: Project Management Professional (PMP) - 2020 REFEREES
Available upon request