Post Job Free

Resume

Sign in

Power Plant Piping

Location:
Kollam, Kerala, India
Posted:
March 18, 2021

Contact this candidate

Resume:

MOB: +919*********

YESUDASAN RICHARD

adkz27@r.postjobfree.com

PIPING SUPERINTEDENT Offering 20 years of experience in oil and gas pipelines and pipeline facilities, such as pumping units, compressor stations, tank farms including offshore platforms

EDUCATION & CREDENTIALS

Diploma In Mechanical Engineering

Certifications & Other Courses:

MSA-SUVI-SYSTEM: - Training course for the preparation of fusion joint and handling of pre-insulated pipe handling and fit up 10 days training conducted by ALSTORM Kuwait. KOC.

Awarded job performing certificate from ADCO.

T-Bosiet. Vantage No.168806 from Brunei. PTW from Brunei shell, ADCO, GASCO, Dolphin Energy, KOC and KNPC.

COMPETENCIES MATRIX

Supervises and coordinates activities of workers engaged in maintenance of oil and gas pipelines and pipeline facilities, such as pumping units, compressor stations, tank farms, and rights-of-way.

In-charged in the punch-listing, conformity and line colour coding and Hydrostatic, pneumatic testing and NDT testing.

Supervised thirty (30) skilled men in the installation of inline piping from ” 0 up to 48”0 and accessories.

Blinding, removal, cleaning, re-installation, hydrostatic testing and de-blinding of shell and tube exchangers, re-boilers, condensers.

Pneumatic and hydrostatic testing on piping and tank respectively including air and water flushing on completed lines.

Giving signals to the crane operators and riggers for lifting and hoisting of assembled spool and giving instructions for lashing it temporarily for the further welding works.

Installation of stainless cryogenic process, utility carbon steel aluminized, cement lined spooled piping and pump well column Alloy steel and Duplex and ss.

Fabrication of stainless cryogenic process piping from 36”0 down to ”0, also utility Carbon steel aluminized and cement lined piping.

Prepares special and standard pipe support types, size and locations on piping isometric drawing based on project standard specifications.

Fabrication and periodic maintenance of piping systems carrying water,steam,chemicals and fuel in heating, cooling, lubricating and other process piping system

Prepares pipe cutting sequence schedule for process piping to minimize wastage of materials.

Prefabrication and erection of pipe spools & supports

CAREER CONTOUR

PETROFAC, NSH, KUWAIT from 20th March 2018 to 22nd December 2018 AS A PIPING SUPERINTENDENT EMP#901434 For clean fuel project KNPC MAB1.

Planned and established work schedules, assignments, and production sequences to meet project goals, as well as organized production operations and activities with other departments.

Evaluated safety procedures and regulations and executed disciplinary actions.

Oversaw system fabrications, installations and layouts for specifications.

Ensured uniform hardware purchasing and standardization of materials for system specifications.

Incorporated field foreman's daily reports into the labor and equipment coordination and progress achievement assessment.

Maintain and updated data, such as timeline progress, production, and cost records, and prepare management reports and weekly updates.

Directly support project and construction management with planning and utilization of proper means and methods for all construction activities

Handling test packages and distributing the work to supervisors.

HIESCO KUWAIT from Oct.1st 2017 to Dec.22nd 2017.

EQUATE SHUT DOWN WORK.

SAIPEM, ENI, KSA SAUDI ARABIA from Oct 17th 2016 to 20th April 2017. AS A PIPING SUPERINTENDENT For Rabigh II Naphtha and Aromatics project

Monitored construction activities to ensure quality and safety standards were adhered to while achieving maximum work efficiency.

Handling test packages and distributing the work to supervisors.

Supervise daily piping and structure activities

Manage teams of work crews

Maintain high level of safety work environment

Responsibility for collection of materials from Vessel to Platform

Reporting work progress to site engineer and unit manager.

ADININ WORKS & ENGINEERING SDN BHD BRUNEI from 20th June 2015 to 31st July 2016 AS A PIPING SUPERVISOR For Brunei Shell in offshore platforms

Planned work activities ensuring that isometric drawings, p&id's, equipment, and materials were available to execute project in a timely manner.

Ensured that work crews were knowledgeable of work procedures and specifications.

Supervised performance of hydro-testing, piping installation in pipe racks as well as underground.

Trained foremen and general foremen to plan and allocate manpower based on earnable hours and unit rates.

Planned and scheduled equipment purchases and rentals. Purchased company provided tools required for pipe fitting and rigging.

Scheduled material deliveries.

-Turnaroud 5 number in offshore platform.

AL HUSSAM GENERAL CONT. EST. ABUDHABI from 20th November 2006 To dece.30th 2014. AS A PIPING SUPERVISOR For oil field and power plant

3 Years in Asab ADCO,-Over all Supervising of removal of Old pipe line and installation of new line from wellhead to RDS.

2 Years in Water Desalination and power Plant with FISIA, DEWA at Jebal Ali. 2 Years in Taweelah Dolphin—Al Ain –Fujairah Pipe line project and expansion project. And, we had maintenance work like pump and valve maintenance in Taweelah Dolphin Company.

Handling permit applications

Supervise daily piping and structure activities

Manage teams of work crews

Maintain high level of safety work environment

Supervising a team consisting 4 Nos of foremen 6 Nos. Fabricators,4 Nos.Welders, 10Nos.Fitters,5 Nos..Riggers for piping erection work.

Responsible for all logistics works regarding collection of materials from the yard to the work site

Reporting work progress to the project manager on daily basis.

UNITED GULFCONSTRUCTION CO. KUWAI from JULY 20TH 2004 TO 30TH JULY 2006 AS A PIPING SUPERVISOR For chilled water plant KOC

Supervised in the fabrication for a chilled water plant in KOC Kuwait, spooled piping and installation of above and below ground pipelines, also in charged in hydrostatic/pneumatic testing of all installed piping and vessels.

D.S.D. BAHARIN From April 2000 TO Nov.2002 AS A PIPING SUPERVISOR For cock calcimine project Alba jetty

Cock calcimine project in Alba jetty and a desalination project. Organizing day today work with workers and avail them needed materials

Explain the drawings and clarifying doubts from the workers

Carry out safety walk in the site and make sure the works are going as per the safety instructions.

C.C.CABU-DHABI From 21ST September 1998 TO SEPT 1999 AS A FABRICATION SUPERVISOR For expansion project in ADNOC Ruwais Refinery

Expansion project in ADNOC Ruwais. Coordinate day today work

Making requisition for the materials according to the requirements of the site

Follow up of orders and expediting in connection with purchase department

Availing all the materials needed by the fabricators and fitters

POONG LIM INDUSTRIAL CO.LTD (UNDER FLUOR INTERNATIONAL LTD. KUWAIT From 12TH MARCH 1997 TO 30TH AUGUST 1997 AS A FABRICATION SUPERVISOR For Equate project.

Equate project in Kuwait. Cutting pipes as per the drawings with all kind of latest cutting machines. Pipe bending with the pipe bending machine

Making threads for the pipe as per given measurement

Drilling plates and walls using power tools

MATRIX CONSTRUCTION CO. (UNDER KELLOGG CONSTRUCTION LTD. ABUDHABI from September 1995 TO September 1996 AS A FABRICATION SUPERVISOR For Diebold necking project GASCO

Diebold necking project in GASCO Ruwais. Clean pipe units and flush system

Fabricate sections of pipe system

Making request for the pipes and valves as per the required measurement and type

PERSONAL SNIPPETS

Date of Birth: 21-April-1970

Linguistic Abilities: English, Hindi, & Malayalam

Address: Vilayilazhuthue, Koivila, Kollam DT, Kerala-India

Driving licence: India

Nationality: Indian

Marital Status: Married

Contact No +047*-*******..

Skype Id yesudas.richard

Email adkz27@r.postjobfree.com

PASSPORT DETAILS

Passport number: K 8443141, Place of Issue: Abu Dhabi

Date of Issue: 14.11.2012, Date of Expiry: 13.11.2022

DECLARATION

I hereby declare that all the furnished above are true to my knowledge and belief and I am liable to be disqualified, if anything found wrong.

[Yesudasan Richard]

Team Leadership

Workforce Scheduling

Logistics

Communication

Health & Safety

Construction, Fabrication and

Erection Offshore Platforms

Shut down work



Contact this candidate