Post Job Free
Sign in

Project Power Plant

Location:
Hyderabad, Telangana, India
Posted:
March 14, 2021

Contact this candidate

Resume:

Flat No-***, Laxmi Residency,

Near Spring Valley Water Tank,

Spring Valley, Kondapur,

Hyderabad 500084

Telangana, India.

Mobile No. +919*********

Email : *.************@*****.***

SUDHAKAR BABU GADAM (STRUCTURAL STEEL DEATILING CHECKER/ PROJECT LEAD/COORDINATOR)

OBJECTIVE

To devote myself to a promising career and challenging profession in the field

Of Structural Steel Detailing.

EDUCATION

Completed DM/Mechanical apprenticeship from Hindustan Aeronautics Ltd.,

Hyderabad in May 1999 with 72 percent.

Completed DM/Mechanical from Govt. I.T.I. Musheerabad,

Hyderabad in July 1996 with 63 percent.

Completed S.S.C. from Good will public school, Hayathnagar,

Hyderabad in March 1994 with 76 percent.

SKILLS

OPERATING SYSTEM: Windows 8

PACKAGES:

Autocad 2016 2D & 3D Modeling (Auto lisp)

Tekla Structures 2017 & 2018

Bocad 21

Pdms 12

Navisworks Simulate 2016

Microsoft Excel 2013

EXPERTISE

Off-Shore & On-Shore Steel structures

Conventional buildings

Residential buildings

Industrial structures

Oil & Gas Platforms

HRSG Structures

Raw material handling systems

Metal Stair cases

AM, FM and TV towers

Miscellaneous: Ladders, Handrails, Guardrails and Gratings Etc.

CODES & STANDARDS

AISC

AWS

BS

CISC

IS

Euronorm

API

Petronas

JOB DESCRIPTION

Day to day coordination with client.

Referring Design GA drawings, Client Specifications, Vendor drawings, Standard Connections /Weld joint detailed drawings, Fabrication methods/sequences, Material availability/Substitution etc.

Performing requirement analysis for manpower and other resources required to meet the project schedule.

Coordinating with HOD and getting the required manpower and other resources for execution of the job within the stipulated time.

Briefing the project requirements to Checkers and other team members to ensure that the team had complete awareness on technical and schedule requirement of project.

Work Planning and distribution to different teams.

Preparing delivery schedules in line with project schedules.

Monitoring the progress and delivery in line with the planned schedules.

Submission of weekly progress report to client.

Raising RFI’s to client, reviewing RFI clarification status and coordinating with client for closing the pending RFI’s and clearing the work front for the detailing team.

Clarifying Team member doubts/queries

Preparing the check list to suit the project requirement and getting clearance from customer for implementation in the project.

Ensuring the quality of the deliverables.

WORK HISTORY

1.Avineon India Pvt. Ltd., Hyderabad.

I have been working at this company since December 2007.

Present designation is an assistant manager at civil & structures department.

2.Capacity-plus India Pvt. Ltd., Rajajinagar, Bangalore.

Worked as a Senior Engineer (Project Lead) from June 2007 to November 2007.

Raising RFI’s, Tekla model checking, Erection and shop drawings checking of Conventional steel buildings with respect to AISC & CISC codes and standards.

3.Mold-Tek Technologies Pvt. Ltd., Hyderabad.

Worked as a Checker cum Team leader for 17 months in the period of October 2005 to May 2007. Checking of Structural steel buildings erection and fabrication drawings with respect to design drawings on AISC codes and standards. Also worked for Sharon Stairs Inc. (U.S.A.) Work involves in metal stair cases Approval, Erection and Shop drawings as per I.B.C, U.B.C & California building codes.

4.Srikanya Industrial Corporation, Hyderabad.

Worked as Senior Cad Engineer and Site supervisor for 5 Months in the period of April 2005 to Sep 2005.

Steel Buildings. Detailing of Trusses, Louvers and Gables, Preparation of erection and Fabrication drawings with CAD on Indian standards.

5.Sai Structurals, Hyderabad.

Worked as Cad Engineer for 5 years in the period of March 2000 to March 2005.

Work involves analyzing and detailing of structural steel elements, Preparation of erection and fabrication drawings of Conventional steel buildings with CAD on AISC standards.

Creation of Typical and As-built 2D & 3D drawings of BTS Construction Sites. Developing erection and generating fabrication drawings of AM, FM & TV Towers.

ON SITE PROJECT HISTORY :

PROJECTS HANDLED :

1. Title : KOC WKO PH2

Client : NOV, DUBAI.

(Deputed to KUWAIT for project coordination from 21- Dec-2019 to 06-Jan-2020)

2. Title : KOC WKO PH2

Client : NOV, DUBAI.

(Deputed to KUWAIT for project coordination from 01- Oct-2019 to 16-Oct-2019)

3. Title : KOC WKO PH2

Client : NOV, DUBAI.

(Deputed to KUWAIT for project coordination from 28- Jul-2019 to 09-Aug-2019)

4. Title : Sustainability Pavilion

Client : Cleveland & Bridge ME, DUBAI.

(Deputed to DUBAI for project coordination from 07- Sep-2018 to 30-Nov-2018)

5. Title : Centrale De Martigues (France)

Client : Eurotech Engineering International Co. Limited (Thailand)

(Deputed to Bangkok for project coordination from 21- Oct-2009 to 20-Nov-2009)

1. Title : Burj Crown,

Client : Cleveland & Bridge, Dubai.

Application : Steel structural Buildings.

(Working as Civil & Structural Lead Checker from 03-2021 to till date)

2. Title : Petrofac Zadco,

Client : Petrofac, Chennai.

Application : Oil & Gas As-Built.

(Worked as Civil & Structural Lead Checker from 07-2020 to 03-2021)

3. Title : Petrofac Fadhili,

Client : Petrofac, Chennai.

Application : Oil & Gas As-Built.

(Worked as Structural Lead Checker 03-2020 to 07-2020)

4. Title : Petrofac Jazan,

Client : Petrofac, Chennai.

Application : Oil & Gas As-Built.

(Worked as Lead Checker from 02/2020 TO 07/2020)

5. Title : KOC WKO PH2

Client : NOV, Kuwait.

Application : INLET, HIGF & PIPE RACKS Designing, Modelling & Detailing.

(Worked as project coordinator from 06/2019 TO 01/2020)

6. Title : SRU Petrofac

Client : Petrofac, Mumbai.

Application : Pipe racks Modelling & Detailing.

(Worked as Project lead from 05/2019 TO 11/2019)

7. Title : Sustainability Pavilion

Client : Cleveland and bridge, Dubai.

Application : Monument structure Modelling & Detailing.

(Worked as Project Coordinator from 08/2018 TO 04/2019)

8. Title : Evonik ME6

Client : TTJ, Singapore.

Application : Technological Structure.

(Worked as project Lead from 06/2017 TO 09/2018)

9. Title : Batching Plant & Flying Bucket

Client : TTJ, Singapore.

Application : Industrial Structures.

(Worked as project Lead from 10/2017 TO 10/2018)

10. Title : Singapore Government Hospital

Client : Yongnam, Singapore.

Application : Government Hospital.

(Worked as Lead Checker from 04/2017 TO 07/2017)

11. Title : ALISONS

Client : Petrofac, Chennai.

Application : Oil & Gas As-Biuilt.

(Working as Project Lead from 04-2016 to 09-2017)

12. Title : ARORA FINISHING STRUCTURE

Client : TTJ Holdings Limited, Singapore.

Application : Chemical Factory.

(Worked as project Lead from 04-2015 to 08-2016)

13. Title : AOTC

Client : AOTC, Dubai.

Application : Pipe racks.

(Worked as project Lead from 06/2016 TO 10/2016)

14. Title : ALISONS

Client : ALI & SONS, Dubai.

Application : Pipe racks.

(Worked as project Lead from 04/2016 TO 08/2016)

15. Title : Aurora- UMR_Main Piperack

Client : TTJ Holdings Limited, Singapore.

Application : Chemical Factory..

(Worked as project Lead from 01-2016 to 04-2016)

16. Title : TAMPINES TOWN HUB

Client : TTJ Holdings Pvt. Limited, Singapore.

Application : Residential & Recreation Centre.

(Worked as project Lead from 11-2014 to 06-2016)

17. Title : IIT HYDERABAD

Client : TTJ Holdings Pvt. Limited, Singapore.

Application : Civil Building.

(Worked as project Lead from 10-2013 to 05-2014)

18. Title : MARKET STREET FUNNEL

Client : Yongnam Engineering pvt. Ltd, Singapore.

Application : Commercial monument.

(Worked as project Lead from 08-2013 TO 07-2014)

19. Title : MOVING ROOF

Client : Yongnam Engineering pvt. Ltd, Singapore.

Application : Singapore sports complex.

(Worked as project Lead from 08-2013 TO 07-2014)

20. Title : MURAI CAMP

Client : TTJ Holdings Pvt. Limited, Singapore.

Application : Defense Secret store.

(Worked as project Lead from 07-2013 TO 03-2014)

21. Title : KWIK STEEL

Client : Kwik Steel, Dubai.

Application : CIRCULARE PLATFORMS & LADDERS

(Worked as project Lead from 12-2014 TO 04-2015)

22. Title : EXTERAAN ADHI

Client : Exterran, Dubai.

Application : Skid

(Worked as project Lead from 07-2014 TO 09-2014)

23. Title : EXTERAAN ZORA

Client : Exterran, Dubai.

Application : Skid

(Worked as project Lead 10-2014 TO 12-2014)

24. Title : MACEDON GAS PLANT

Client : THAI NIPPON, Thailand.

Application : Module

(Worked as project Lead 08/11)

25. Title : THAI HERRICK,

Client : THAI HERRICK, Thailand.

Application : Module

(Worked as project Lead 03/11)

26. Title : Qurayyah power plant,

Client : Eurotech Engineering International Co. Limited (Thailand)

Application : Outlet Duct

(Worked as project Lead 08/11 to 12/11)

27. Title : WASIT GAS PROGRAM

Client : Cleveland & Bridge, Dubai.

Application : Inlet Duct.

(Worked as project Lead 01-2012 to 04-2012)

28. Title : SULB-DR (AMA Bahrain)

Client : Cobe steel ltd. (Japan)

Application : Furnace Tower.

(Worked as project Lead 01-2010 to 10-2011)

29. Title : Centrale De Martigues (France)

Client : Eurotech Engineering International Co. Limited (Thailand)

Application : HRSG Structures.

(Worked as project coordinator at Thailand in October and November 2009)

30. Title : Zayeed University (Dubai)

Client : Cleveland Bridge and Engineering Middle East Pvt. Ltd.

Application : University.

31. Title : ANRAK

Client : Anrak alumina Refinary

Application : Aluminium Refinary Unit

32. Title : Tata steel plant

Client : L & T

Application : RMHS

33. Title : CGC

Client : CGC QATAR

Application : As built drawings of Oil & Gas platform

34. Title : Turkmenistan Block-1 Gas Development MCR-A Top sides

Client : MMHE (Technip) Malaysia

Application : Oil & Gas platform.

35. Title : Marginal Way (U.S.A.)

Client : Mandate Erectors (U.S.A)

Application : School Buliding

36. Title : Acalmar oils and fats ltd. Kakinada.

Client : Acalmar oils and fats ltd. Kakinada.

Application : Oil & Refinery Factory.

37. Title : Value labs

Client : P.L.Raju constructions, Hyderabad.

Application : commercial building.

38. Title : Hyderabad Convention Centre,

Client : Hyderabad Convention Centre, Hyderabad.

Application : Recreation center.

39. Title : Bethel Baptist worship center (U.S.A.)

Client : Rhocorp steel 2331

Application : Church

40. Title : West Minster, Canterbury of the Blue Ridge. (U.S.A.)

Client : SFCS Inc. Lynchburg steel and specialty co.

Application : Independent living apartments and parking garage.

41. Title : Smith field middle school (U.S.A.)

Client : Southern structural steel

Application : School

42. Title : Oak ridge elementary school (U.S.A.)

Client : Carolina steel co. (U.S.A.)

Application : School

43. Title : The Ross Film Theater (U.S.A.)

Client : Egger Steel Corporation

Application : Shopping Complex and Film Theater

44. Title : Free will Baptist church (U.S.A.)

Client : Chesapeak bay steel

Application : Church

45. Title : River creek country club-club house (U.S.A.)

Client : Century steel

Application : Club house

46. Title : CNU Residence hall (U.S.A.)

Client : American steel Inc.

Application : Residential building

47. Title : Southern Asian SDA church (U.S.A.)

Client : Century steel

Application : Church

48. Title : TV towers

Client : ECIL

Work : Erection and Fabrication Drawings.

49. Title : BTS Sites

Client : Tata cellular ltd.

Work : Typical and as-built drawings

DECLARATION

I hereby declare that the information given in this form is true and nothing is withheld. I further agree that if I am employed by the company and if it is found subsequently that any of the details furnished herein are found to be false and/or that I have suppressed any information, the company has every right to terminate my services at once.

Place: Hyderabad. Yours Faithfully

Date: 12th March 2021 (G.Sudhakar Babu)



Contact this candidate