S. KENNEDY
Mobile: +91-944******* (India)
Tel.:+91-44-247***** (India)
E-Mail – *****************@*****.***
Aiming for assignments in Project Management with a leading organisation
- Dedicated to ensuring safe, durable and efficient machinery and tool equipment
Project Management Maintenance & Erection Design & Development
Process Improvement Contract Management Vendor Development
Plant Engineering Energy Optimization Team Management
Electrical Engineer with an experience of over 29 years in Installation & Commissioning and Testing for electrical projects
Last Employer – Technip, Abu Dhabi
Expertise in planning & controlling engineering design & development activities, procurement, skills in conceptualising and effectuating process initiatives to enhance efficiency
Draws on strong commercial experience to integrate projects into existing business processes; hands-on expertise in designing world-class systems and implementing processes that enable organisation to consistently meet and enhance customer satisfaction
Proficiency in handling Medium Voltage, Low Voltage, Control Panels installation & commissioning and Low voltage & Control panel design Engineering activities
Superb balance of technical know-how with workforce management and collaborative abilities
Adept in managing testing & commissioning activities; involved in-process inspection, team building and coordination with internal / external departments
Possess excellent analytical and problem solving qualities
SKILL SET
Steering the successful rollout of projects with accountability of defining scope, setting timelines, analyzing requirements, prioritizing tasks, identifying dependencies and evaluating risks & issues as per pre-set budget/resources
Managing end-to-end execution of projects from stage of tendering to handover including requirement analysis, finalization of technical specifications & setting up of component assembly lines as per budgeted norms
Reviewing blueprints, diagrams, schematic engineering drawings, layouts, technical specifications & cost estimates for erection & commissioning operations; analyzing contractor's order proposals & submittals
Identifying areas of bottlenecks & breakdown and non-conforming products; taking steps to achieve zero accident & customer complaints through the application of troubleshooting tools like root cause analysis
Identifying areas of obstruction / breakdowns and taking steps to rectify the equipment through application of troubleshooting tools
Preparing bill of material as per the project’s requirement
Anchoring installation & commissioning of heavy equipment and conducting tests & inspections to ensure operational effectiveness of plant & utilities
Carrying out overhauling work of equipment, modifications and major repairs to improve equipment efficiency
Involved in installation, performance trials, system layouts & checks of main / auxiliary machinery and preparing documents for the same
WORK EXPERIENCE
January 19 – July 19, Technip, Abu Dhabi – Senior Electrical Engineer
Role:
Worked as a senior electrical engineer pre-commissioning / commissioning / start-up of electrical equipment such as 415V switchgears, UPS systems, lighting system, high/low voltage motors, Chemical package units, etc.
Verifying the electrical engineering drawing submitted by various electrical vendors to meet project specifications
Highlight:
Testing/commissioning of Auto Transfer Logic for 3 incomer, 2 bus-tie, LV Switchboard
Testing/commissioning of IPCMS/SCMS communication
Testing/commissioning of Dry type transformers including lighting Distribution boards
Testing/commissioning of 3 nos. of 230V AC UPS and 1 nos. 110V DC UPS including batteries
Testing/commissioning of 6 nos. mono rails, 12 nos. HV motors (6.6kV), and 6.6kV/400V transformer.
Key Project Handled
Sulphate Reduction Plant – Yard – ZADCO
August 16 – March 18 Technip, Abu Dhabi – Senior Electrical Engineer
Role:
Worked as a senior electrical engineer pre-commissioning / commissioning of electrical equipment such as 11kV switchgears, 415V switchgears, sub-sea cables, UPS systems, etc.
Verifying the electrical engineering drawing submitted by various electrical vendors to meet project specifications
Hook up and commissioning of electrical equipment
Highlight:
Testing/commissioning of Auto transfer logic of 11kV switchgear and 11kV diesel generator
Testing/commissioning of Auto Transfer Logic for 3 incomer, 2 bus-tie, LV Switchboard
Testing/commissioning of IPCS communication
Testing/commissioning of 2 nos. of 230V AC UPS and 1 nos. 110V DC UPS including batteries
Testing/commissioning of 12 nos. mono rails, galley equipment, potable water cooler unit, pedestal crane and entire lighting system
Key Project Handled
Forward Mounted Base – Offshore Platform – Qatar Petroleum
March’15 – April ‘16 Technip France, Abu Dhabi – Senior Electrical Engineer
Role :
Worked as electrical PMC in Ruwais Refinery for the project Group III Base Oil Production Facilities
Verification of electrical engineering drawings and documents to meet project specification and standards
Project Execution, testing and commissioning of various electrical equipment
Attending project meetings with Ruwais Refinery personnel
Key Project Handled
Ruwais Refinery, Group III Base Oil Production Facilities
Training to client for various electrical equipment such as HV/LV switchgears, UPS, etc.,
Nov’07-Jan’15: Skema spa, Italy as Manager – Engineering Services and Commissioning (Skema LLC, Abu Dhabi)
Role:
Spearheading a gamut of tasks pertaining to reviewing engineering (control & protection circuits) drawings
Leading the preparation of engineering drawings such as single line diagram, general arrangement, schematic diagram, SAT/FAT procedures, etc., as per the data sheets provided by clients
Anchoring pre-commissioning, commissioning, start-up activities and offering services for the supplied switchgears
Chairing technical clarification meeting with various clients
Highlight:
Deftly organised Switchgear training to client at Skema spa, Italy & Abu Dhabi
Preparation of logics as per control diagrams on Intelligent relays (GE, Siemens & Schneider)
Hands on experience in On shore / Off shore Installation, testing & commissioning of low voltage / high voltage switchgears, electrical equipment
Key Project Handled:
SBM-Talisman – Mopustor YME field re-development project
Nexen Petroleum – Golden Eagle Project
ConocoPhillips Petroleum company – Jasmine Development project
AGIP KCO – Kazakhsitan experimental projects
Tengizchevroil – Sulphur foaming facilities sub-stations
GASCO – On shore Gas development Phase III
Petrofac – Laggan Tormore Project
Technip – Satah full field development project
Technip – ADMA OPCO flares modification/Revamping project
Sudelettra, Nigeria
Jul-04-Sep’07: Toshiba Plant System and Services Corporation, Tsurumi Office, Yokahoma, Japan
Role:
Steered the preparation of scope of work, division of work, deviation and clarification for the overseas jobs
Prepared:
oSystem design description for LV Switchgears, cabling, grounding a& lighting for overseas projects basis the design
oPreliminary design for switchgears, Cabling, grounding and lighting
oPreliminary design for LV switchgears and Distribution boards
Engaged in price evaluation and vendor correspondence for the overseas projects
Handled vetting of LV switchgears drawing as per the requirements
Liaised with Design Department for the material requirement & preparation of drawing as per the site condition
Collaborated with Lehmeyer International (Client’s Engineer) for getting approval
Key Projects Handled:
2 x 300 MW CCPP, Kerawalapitiya, Sri Lanka
2 x 700 MW Thermal Power Plant (Coal Fired), Jimah, Malaysia
2 x 700 MW CCPP, Port Dickson – 2, Malaysia
2 x 125 MW CCPP, Hanha Chemical, Korea
3 x 300MW CCPP, Nhon Tranch, Petro-Vietnam, Vietnam
2100 MW (3 x 700) CCPP, APPDCL, Karimnagar, India
750MW Jebel Ali Combined Cycle Power Plant, Dubai, UAE
Sep’01-Apr’04: Pioneer Wincon Ltd., Chennai, India as Contracts Engineer
Role:
Prepared design engineering for the control panels and testing & commissioning
Handled execution, testing and commissioning of 66/33KV sub-station at Aimangala, Chitradurga including erection of 12.5/16 MVA Transformer, 33 KV CT, 33KV PT, 33 kV LA.33 KV DP structures, 33 KV inter farm line, 33 Kv metering and protection yard with VCBs and GCBs Design and estimation for the projects
Executed factory inspections of all electrical materials such as Control Panels, Transformers, Breakers, CT, PT, Isolators, etc. required for the project
Drafted and maintained contract documents for contracts finalizing & closing
Prepared material bill of quantities and material procurement
Key Projects Handled:
MAHE at Chitradurga, India: Execution, Testing and Commissioning of 22KV & 11KV OHE lines, Sub-stations and point of supply
All Wind Generator Projects taken by the company in Tamil Nadu, India
Mar’01-Aug’01: Elsytech Engineers and Consultant Pvt. Ltd., Chennai as Site In-charge
Key Project Handled:
Cairn Energy India Ltd., Yanam (Oil Terminal)
Role:
Supervised the execution, testing and commissioning of 11 KV MV Switch Gears including 415V Power and Control Panel, laying of 3 C x 185 sq.mm XLPE Cables
PREVIOUS EXPERIENCE
Sep’98-Nov’00 Rotmax Engineering Enterprises, Chennai as Senior Electrical Engineer
Key Projects Handled:
Saint Gobin Glass Factory, Chennai
Saratha Motors
MRF Tyres, Tamil Nadu
Telecommunication Ltd., Arakkonam, India
Gypsem Ltd., India Fashions Ltd.
Kalpakkam Atomic Power Station (Partial Job)
110KV Switchyard at Arunachalam Sugar Mills, Thiruvannamali and Tamil Nadu
Chemical Products Ltd., Guduvanchery
Role:
Preparation of tender documents
Attending tender meetings with end client
Preparation engineering drawing for supplied systems like LV switchboard, cable trays and cabling
Execution of time management projects till to the satisfaction customer
Oct’95-Sep’98 Pandit & Co., Mumbai as Site Manager
Key Project Handled:
Eastern Railways at Lakhisheroy, Bihar, India
Role:
Preparation engineering drawings for signalling and control for route relay interlocking system for 7 stations
Commissioning/handing over activities of railway signalling
Installation of cabling, signalling system and other sub-systems
Nov’94-Sep’95 Zoom Developers Pvt. Ltd., Mumbai as Site In-charge
Key Project Handled:
Indian Oil Corporation
Installation of OFC cables
Feb’91-Aug’94 Primier Silcarb Pvt. Ltd., Latur, Maharashtra as Electrical Engineer
Installation and commissioning of 1MVA power transformer, capacitor banks, double pole power point and all the electrical major equipment
Maintenance of all the electrical and mechanical equipments
Mar’87-Feb’91 English Electric Co. of India Ltd., Chennai, India as Supervisor
Key Projects Handled:
62.5 MW Balco Captive Power Plant, NTPC at Korba, M.P., India
NLC 400KV Switchyard at Salem
Role:
LV and MV switchboard installation and commissioning
Supervision and commissioning activities of 220kV switchyard
Co-ordination with end user for daily site activities
Supervision of installation activities
Nov’84-Mar’87 Private Electrical Contractor, Chennai, India as Site Engineer
ACADEMIC DETAIL
1984 Diploma in Electrical Engineering from PAC Ramasamy Raja Polytechnic, Tamil Nadu
TRAINING CERTIFICATE
Offshore Training Certification -BOSIET – Safety
Minimum Industrial Training Certificate – MIST – Safety
H2S Training Certificate - Safety
PERSONAL DETAILS
Date & Place : 28th November, 1963
Languages Known : English, Hindi and Tamil
Current Address : 46, 3rd Street, Murthi Nagar, Chettiagaram, Chennai - 600077
Permanent Address : 46, 3rd Street, Murthi Nagar, Chettiaragaram, Chennai – 600077, Tamil Nadu, India