Post Job Free
Sign in

Construction Manager

Location:
Center, TX
Salary:
200k
Posted:
March 13, 2021

Contact this candidate

Resume:

Anthony J. Gibbs

**** ** ***

Center, Texas *****

Home Cell: +1-281-***-****

E-mail: adkvng@r.postjobfree.com

Profile: A Senior Construction/Completions Manager with over 30 years’ experience in the Oil & Gas industry ranging from fabricator, front line supervision, test engineer, construction coordinator, construction field engineer, lead piping engineer, mech./pipe completions engineer, site fabrication manager, construction delivery manager and site manager. Strong practical experience in both the field and office with an exceptional track record in achieving project objectives and leading my teams as a site safety leader (SSL). Interested in construction manager or project manager role to use years of combined knowledge from practical design through to start-up of plant.

Skills:

Knowledge and understanding of all phases of the Oil & Gas industry offshore as well as onshore. (Engineering, Fabrication, Construction Project Coordination, and Supervision of Completions activities).

Constructability input to engineering design and engineering resolutions of topsides platforms in line with pertinent codes and standards.

Pre-commissioning/commissioning and start-up of topsides platforms and onshore plants.

Experienced in the coordination and supervision of multiple discipline trades and diverse cultures.

Evaluation and supervision of specialist contractors and sub-contractors. (i.e. fibreglass pipe, N2He sensitive leak testing, chemical cleaning, hot oil flushing, flange management, and machining)

Excellent managerial, communication and people skills.

Computer skills consist of MS Excel, Word, Power Point, & Access. PDMS 3D Review Models. Navigation of WINPCS and Documentum data bases. JMS (job card management system) input and operator.

Agile ways of working utilizing SCRUM, KanBan etc.

Career History:

Fircroft Group 2017 - 2020

Construction Delivery Manager/Site Safety Leader

PMT for BP GPO Trinidad GEP (Galeota Expansion Project)

Responsible for managing $400MM EPCI contract for the upgrade and expansion of the existing crude oil plant to include a 50k BPD Produced water, a 15k BPD condensate handling units and a new vent/flare system to dispose of <10k tonnes/yr. CO2.

Responsibilities included:

Monitor and co-ordinate all construction related activities performed by the contractor and sub-contractors0.

Focal point for all construction related issues associated with the contractor's scope of work.

Ensure contractor's and sub-contractor’s compliance with project HSE standards through regular safety inspections and involvement in contractor's site safety audits

Monitor contractor's and sub-contractor’s compliance with project quality and environmental standards

Review, comment upon and accept all construction and quality plans and procedures

Review and monitor contractor's and sub-contractor’s construction progress and their compliance with their schedule

Monitor contractor's resource usage on the project in comparison to that agreed under the

contract.

Attend weekly progress meeting with contractor's site construction team

Approve the execution of additional works under the contract and confirm costs presented by the contractor for this additional work

Assess and approve contractor's claims for milestones achieved

Fircroft Group 2014 - 2017

Construction Engineer/Manager/Site Safety Leader

PMT for BP GPO Trinidad Juniper Project

Responsible for managing EPCI contract for the fabrication and delivery offshore of a 5,000 ton gas receiving topsides and 6,000 ton jacket.

Responsibilities included:

Monitor and co-ordinate all construction related activities performed by the contractor.

Focal point for all construction related issues associated with the contractor's scope of work.

Ensure contractor's compliance with project HSE standards through regular safety inspections and involvement in contractor's site safety audits

Monitor contractor's compliance with project quality and environmental standards

Review, comment upon and accept all construction and quality plans and procedures

Review and monitor contractor's construction progress and their compliance with their schedule

Monitor contractor's resource usage on the project in comparison to that agreed under the

contract.

Attend weekly progress meeting with contractor's site construction team

Assess and approve contractor's claims for milestones achieved

Moody International Americas Inc. 2013 - 2014

Site Fabrication Manager

PMT for BP GoM-GPO Thunder Horse Water Injection

Responsible for the fabrication and delivery offshore of a 250 ton Cartridge Filter Module for the Thunder Horse Water Injection Project.

Responsibilities included:

Monitor and co-ordinate all construction related activities performed by the contractor.

Focal point for all construction related issues associated with the contractor's scope of work.

Ensure contractor's compliance with project HSE standards through regular safety inspections and involvement in contractor's site safety audits

Monitor contractor's compliance with project quality and environmental standards

Review, comment upon and accept all construction and quality plans and procedures

Review and monitor contractor's construction progress and their compliance with their schedule

Monitor contractor's resource usage on the project in comparison to that agreed under the

contract.

Attend weekly progress meeting with contractor's site construction team

Assess and approve contractor's claims for milestones achieved

Review and accept contractor's responses to site queries raised by their own construction team

Approve the execution of additional works under the contract and confirm costs presented by the contractor for this additional work

Focal point for hook-up and commissioning plans and procedures developed by client.

Focal point for interface with Contractors during storage, site transport, load out, installation,

and hook-up and commissioning of Cartridge Filter Module.

Moody International Americas Inc. 2009 - 2013

Mechanical Equipment & Construction Lead

PMT for BP GoM Mad Dog Rig Repair

Responsible for all equipment installation, preservation & material control aspects related to Company & Contractors supplied Equipment & Materials. Responsible for all construction activities in the field. Liaison and overseeing contractor’s preservation & material personnel for the fabrication & load out element of the Mad Dog Rig Repair drilling module.

Responsibilities included:

Interface with Procurement & Contractor on preservation & procurement issues

Represent BP on equipment installation, preservation, materials control and all field construction related matters in progress / weekly / site meetings.

Day-to-day monitoring of Contractors use & installation of equipment and materials.

Liaison with equipment supplier’s preservation teams in order to develop a rigorous site specific preservation program.

Advise on any Customs or Government department issues that arise.

Austen Maritime Services Pte Ltd. 2008 - 2009

Piping Engineer

PMT for Woodside Burrup Pte. Ltd.

Responsible for the Coordination, Engineering, and Supervision of activities on a 5,000ton LNG pigging & utilities platform from fabrication & pre-commissioning in Malaysia through to final offshore hook up and commissioning of the installation off the West Coast of Australia.

Responsibilities included:

Promoting project HSE objectives.

Ensuring contractor completes scope to the agreed schedule.

Responsible for overseeing full mechanical completion within hydro test reinstatements.

Ensuring full compilation of all test documentation to allow close out of MC packs.

Responding to engineering site queries, where applicable.

Providing engineering assistance to the construction contractor for resolution of issues, etc.

Witnessing and approving site acceptance tests.

Review and acceptance of contractor supplied procedures.

Attending project meetings as required

AOQC Moody Int. 2002- 2008

Topsides Construction/Completion Engineer (Mech./Pipe)

Completions Team for BP/AIOC

Responsible for the Coordination, Engineering, and Supervision of activities on 2 ea. 15,000ton production, gas compression and water injection platforms from constructability input at design through to final offshore hook up and commissioning of the installations in the Caspian Sea. I started the projects as lead piping engineer then moved to topsides completion engineer.

Responsibilities included:

Promoting project HSE objectives.

Responsible for overseeing full mechanical completion within hydro test reinstatements.

Ensuring full compilation of all test documentation to allow close out of MC packs.

Responding to engineering site queries, where applicable.

Providing engineering assistance to the construction contractor for resolution of issues, etc.

Review and acceptance of contractor supplied procedures.

Ensured the implementation of engineering procedures, work priorities and changes including performing regular audits to ensure compliance.

Ensure all construction discipline activities were achieved within schedule and compliant with health, Safety, Environmental and Quality requirements.

Identification, resolution and reporting of engineering related matters.

Liaise with the project Quality Manager, Contractor and Vendors to ensure Quality Control activities were integrated with production activities.

Liaise with the project Commissioning Manager to ensure smooth transition from mechanical completion / pre commissioning through to commissioning.

Brown & Root Energy Services 2001 - 2002

Process and Completions Group

Construction Project Field Engineer

- Pemex Cantarell EPC- 22 Project

Responsible for the Coordination, Engineering, and Supervision of activities on a major Production & Gas Compression complex, consisting of 4 ea. 8 pile platforms, 2 tri-pod flare knock-out platforms, 2 tri-pod flare tips, and 9 inter connecting bridges, from constructability input at design through to final offshore hook up and commissioning of the installations in the Mexico sector Gulf of Mexico.

Responsibilities included:

Ensure the safety of all personnel on the project.

Supervise a group of construction leads, who monitor the fabrication subcontractor on a single or multi-discipline basis.

Monitor the progress of the work and resolve any issues that could cause schedule impacts.

Perform QA/QC function with respect to compliance to the specification and the contract.

Resolution of Technical Queries raised by the Fabrication or Hook-up subcontractor.

Interface with engineering to resolve TQ related to design issues.

Interface with Client to discuss issues and progress and all progress.

Review and sign off on system packages and ITR’s for Mechanical Completion (on-shore). Review and sign-off on system packages and ITR’s for Commissioning.

Perform constructability input for onshore fabrication and offshore hook-up.

Define test limits and turnover system boundaries.

Ensure latest copies of drawings and specifications being used by subcontractor.

Review change orders request based on the contractual obligations of the subcontractor.

Document all potential change orders and submit to Change proposal team for follow-up with the client.

Brown & Root Energy Services 1995 – 2001

Greens Bayou Fabrication Yard

Construction Supervisor

- Pemex Cantarell EPC- 01 Project

Responsible for the Coordination and Supervision of fabrication & completions of Topsides Gas Compression Facility module and the supervision of 110 personnel throughout the project duration through completion of load out.

- Exxon Diana/Hoover

Responsible for Coordination and Supervision of 25 frontline supervisors with 300+ personnel during construction activities associated with fabrication & completions of the 16,000 ton topsides Oil & Gas Facility through load out and offshore installation and hook-up complete.

- GBFY Yard Upgrades for

Exxon Diana /Hoover

Responsible for coordinating & managing the fabrication and installation of all yard upgrades utilities, bulk storage tanks, new skid ways and quayside that were being constructed.

-Duke Energy (Trunkline Oil and Gas Offshore Compression Facility)

Responsible for coordinating with engineering to develop man hour estimates of spool fabrication and erection to insure a real time schedule in accordance with project procedures, specifications, client milestones and completion dates.

-BP (Troika) Flowline Bulkheads

Responsible for coordinating, planning and fabrication of 78 Flowline Bulkheads, 3 Pipeline Tow Sleds, Buoyancy piping and 2 Towhead Risers.

S & B Engineering and Construction 1994 - 1995

Construction Field Coordinator

Responsible for several refinery shut down/turnaround projects.

Brown & Root Energy Services 1991- 1994

Supervisor

Responsible for fabrication of jackets, topsides production, drilling, & compression platforms. Involvement included constructability input at design through to onshore commissioning activities.

Belmont Construction - Texas 1988- 1991

Supervisor

Responsible as a front line supervisor for 3 Petrochemical projects, namely

Rohm & Haas Chemical, Mobil Oil Refinery and Fermosa Plastics

Self Employed (Construction & Remodeling) 1986- 1988

Started up a small residential remodelling company during down turn of the oil boom.

Carried out projects ranging from $250.00 to $30,000.00.

All-Star Fabrication and Erection 1984 - 1986

Shop Foreman

Started as fabricator and worked my way up to shop foreman.

Duties included estimating and execution of small fabrication projects.

Burn’s Fabrication 1982 - 1984

Apprentice

Education and Training:

Northshore High School/GED

Lee College

- Supervision and Management Course

- Halliburton Leadership Development

- JMJ/Safety Management System

International Business Management Institute

- Project Management Diploma

- mini-MBA Diploma

Other Training:

- Numerous Safety Training courses throughout career.

- Current Advanced Offshore Water Survival & HUET w/ Triton Simulator

- OPITO TBOSIET Exp. Feb. 01 2024

- BP’s Line Manager Capability Course

- Site Safety Leader (SSL)

- Agile Foundations (LinkedIn)

Personal Details:

Date of Birth: 29th Nov. 1965

Interests: Spending quality time at home with family, anything outdoors (hunting, fishing, camping). Enjoy travel and learning about different cultures.



Contact this candidate