Post Job Free
Sign in

Electrical Engineer Project

Location:
Lagos, Nigeria
Posted:
March 12, 2021

Contact this candidate

Resume:

CURRICULUM VITAE

AGOR, Linus(Mnse)

Mobile: 081********, 090********

e-mail: adkvi3@r.postjobfree.com

With over fifteen (15) years of providing electrical engineering expertise, project management skills and accountability for design impact on cost in the specialized field of power systems designs/projects implementation”- within the multi-faceted projects environment of ABB Ltd/Oil & gas industry, my strength includes the combined resourceful skills, experience, knowledge and capability to manage relationships of diverse back-grounds to deliver value-added services of dependable professional quality within a technically challenging work environment. Very concoius of safety and mindful of relevant safety codes, regulations and industry standards during technical documentation reviews & project implementation(ANSI/NFPA70(NEC), IEC, API RP, ICEA, NEMA & IEEE/OSHA) etc. Works as a strong team player and a quick-learner who adapts easily to emerging technologies with true commitment to the pursuit of personal excellence that ensure high level of synergy among team members. Job Title: Project Engineer (Electrical scope)

Objective: To be aacountable for the delivery of a project within resources much less than baseline budget. TRAINING AND CERTIFICATION

Registered Member: Council for the Regulation of Engineering in Nigeia-COREN R.20,851).

Certified Corporate Member of the Nigerian Society of Engineers-NSE (No 22425).

B.Eng – Electrical & Electronics Engineering: Federal University of technology – Owerri.Certification for Estimating costs & preparing budgets for engineering projects (2005).

Obtained Adkol Consults (Lagos) certification for Industrial partnership in 2003.

Obtained Tom Associates (Lagos) certification for Basic management process.

SAP – ABB In-house SAP Consultant Certified for the use of SD & PS modules.

PMP – Certification In Progress - Currently registered with J.K Michaels for PMI lectures/Exams. PROFESSIONAL EXPERIENCE

From: April 2019 to date

Employer: Four-Link Nigeria Limited – GRA, Port Harcourt.

Project Name & Location: QIT Electrical master plan Implementation. Eket.

Project features: Design reviews of HT switchgears, RMUs/Transformers & LV cables systems: QA/QC (Independent commissioning services, SSHE Co-ordination).

Client: Mercury Engineering for ExxonMobil Producing, Nigeria, Un-Limited.

Positions held: Lead Electrical Engineer.

Detailed Tasks as Accomplished: (a) Contractors’ equipment submittals Reviews (reviewed contractor’s project materials quantities for completeness & correctness & for compliance with the owner’s project requirements (OPR) and basis of design (BOD)

(b)Engineering Reviews (Project Quality scrutiny – reviewed design/construction documents for compliance with required standards & codes of practice): General design document reviewed & verification of compliance to specifications was ascertained; deviations from the standards/codes (GP) were identified, and intent document is realized through non- conformance closure exercises). Finally, commissionable items & commissionable activities with their commissioning inspection and test plan checklists were developed as required. ABB Nigeria limited - Plot 259 Etim Inyang Crescent, Victoria Island – Lagos 2011 - 2016: Electrical Engineer:

(A) Designs, technical & inter-discipline interfacing.

Reviewed project technical documentation and specifications in comparison with design data, drawings and BEME for HVAC and LVAC systems.

Established compliance of project documentation with project requirements: (verifications to meet safety requirements of relevant standards & codes: NEC, ANSI/NFPA70, ICEA, API RP 14F etc), Conduct project risk review to identify associated risks and propose mitigation measures to limit liabilities and consequential damages thereof.

Developed scope of responsibilities and baseline plans for projects along agreed performance targets by establishing required key results areas for subcontractors and junior engineers.

Evaluated total work scope; Carried out technical coordination and interfacing with other disciplines.

Advised specifications and sizes of power and control cables for connecting transformers from 11kv indoor switchboards. Generate cable schedule and routes between control room and switchyard.

Carried out site measurements, take-off materials, evaluated man-hours and prepared cost- estimates for electrical baseline budgeting.

(B) Planning and coordination.

Initiated and facilitated project kick-off meetings for project risk reviews and project scope reviews.

Evaluated & Identified project resources, planned & supervised the implementation of assigned projects as in below examples.

ABB Electrical Systems/Powerlines: Nov. 1999 – Feb. 2010. Senior electrical engineer:( 5 years in design: 2005 - 2009)

Reviewed all assigned LV electrical design projects and produced drawings for factory assembling.

Attended discipline meetings and prepared minutes of meetings.

Provided technical support/prepared man-hour estimates when necessary for installation dept.

Instructed & supervised subordinates. Provided technical support to graduate engineers to enhance their professional advancement.

Ensured familiarity with requirements of the Health, Safety and Environment as it pertains to team daily activities.

Performed other duties and responsibilities associated with the position as was appropriately assigned.

Project engineer, ( 3 years of project: 2002-2004)

Reviewed scope of work, read and interpreted blue prints of control & protection systems.

Initiated & developed Autocad draft configuration of the power system single line drawing.

Prepared shop drawings and finally as-built drawings for transmittals to fabrication and assembly.

Coordinated, and supervised indoor manufacture of power switchgears and met quarterly/annual production set goals

Developed and implemented outdoor project schedules - (Site plan, cable layout tracking and reporting progress both administratively and in the filed). Project estimator, ( 3 years in estimating: 1999-2001)

Estimated cost of distribution networks, equipment, cables, motors; panel erection.

Severally carried out site survey for measurements/material take-off for cost-estimating.

Coordinated and directed daily routine communications (Documents, e-mails, phone calls etc), prepared and analyzed reporting data for management, accurately for timely decision-making.

[D] GEC Alsthom T & D Nig. Plc: Feb. 1994 – Nov. 1999 Commercial/Trainee engineer:(1994 - 1999)

Other Skills:

Communication – Established constructive relationship/liaise with internal and external stake holders at all levels via telephone & email and maintained an unbroken chain of information flow to ensured effective communication via actively listening and probing questions.

Planning and organizing – Adept in work prioritization, balance work, team support and ad-hoc responsibilities in a timely and professional manner to avoid/deal with work pressure.

Problem solving – Generate probing questions, identify alternatives & resolved in-depth queries in a methodical manner independently and with internal and external parties to find appropriate win-win position to improve bottom line.

Team Player – Listen to colleagues, nurture good rapport and enjoys sharing knowledge and encouraging development of others to achieve specific team goals. Other projects executed: 2017 – 2019.

Employer: Four-Link Nigeria Limited – GRA, Port Harcourt. Project Name & Location: QIT Laboratory consolidation (LABCON); Eket. Main project features – Civil & Electrical works: Planning, organizing, Negotiations, coordinating & managing Mhrs, Materials & equipment. Client: Fezinat Services Company Limited Port Harcourt for ExxonMobil-E&PS(GREF). Positions held: Lead Electrical person & Site Manager. Detailed Tasks as Accomplished :Construction supervision & Mgt representation; Prepared power point presentations for project work items cost justification & negotiation meetings. Prepared pre-construction deliverables documentations (i.e. work execution plans

& procedures). Prepared work method statement for all electrical tasks and supervise the preparation of civil scope work method statement e.g. excavations, scaffolding etc.; Project status: As at moment, 100% of first phase milestones have been achieved, safely, no one got hurt with zero time injury.

Certification:

I, AGOR Linus, herby certify that to the best of my sincere knowledge and character up- keep, this CV correctly describes me, my qualifications and my experience. I understand that any willful mis-statement described herein may lead to my disqualification or dismissal, if engaged.

Hobbies/ Interests etc:

Reading self-help books, writing, jogging, Lawn tennis, computers, cooking, house repairs, travelling and swimming.

Reference:

(1) Jerry .I. Anih (2) Engr David Unokan.

Construction Manager NETCO PMT construction Engineer 080******** 080********



Contact this candidate