OBJECTIVESTo play prominently in a highly motivated team driven by a shared vision to excel and win together; determined to be trail blazers in the conception, execution and delivery of assigned tasks, no matter the odds.
PERSONAL INFORMATIONDate of Birth: Feb. 10, 1986
Sex: Male
Nationality: Nigerian
Resident State: Lagos State
State of Origin: Oyo
LGA: Igbo-ora
Marital Status: Married
Languages Spoken: Yoruba Native Language,
English Fluently
French Beginner
Email Address: *****************@*****.***
Contact Number: +221*********
EDUCATION
September 2020 Quality in Construction https://www.futurelearn.com/certificates/o75njb7
October 2017 Project Management (PM)
September 2016 Occupational Health & Safety (OHS) Incident Handling
September 2016 Risk Assessment Training
September 2016 Health and Safety Induction
2009-2012 Lagos State Polytechnic
Computer Science (OND)
2002-2005 National Business and Technical Examinations Board (NABTEB)
Bricklaying Block laying and Concrete Masonry (O level and Trade Test)
PROFFESSIONAL EXPERIENCE (Eight Years’ Experience in Telecom)
Advanced Engineer RAN IE
Ericsson Mali (Remote Support)
United Nations (Danoffice IT)
LTE
May 2020 to November 2020
Verify the Survey reports quality to ensure all required information are captured as requested in the template.
creating of Site Installation Document (SID).
Verifying/Study the BoQ to confirm all the materials needed ordered accordingly.
Preparing of Materials Delivery Request (MDR) base on site configuration.
Sharing the SIDs with ASPs and Local Delivery Team (LD) and following up to ensure installations are done as recommended in SID and it’s Red mark for As-Built.
Updating Erisite accordingly with forecast Planned and Actual date.
Supporting ASP on any challenging facing related to installation, SID and Materials.
Set up/Manage and creating of SRS access for the mobile users.
Ericsson Dakar, Senegal.
Tigo (Rebranded to Free)
U900 130 Sites.
LTE 350 Sites.
New Site 400 Sites (End to End).
NSN Swap to Ericsson153 Sites.
Nov. 2018 to date.
Setting up the SDE tool (E/// Survey App) for ASP and give them adequate training on the usage.
Creating of Isignum for the ASP to enable them to have access to E/// tools.
Support to enroll VIP access (Symantec) with their Isignum account to enable them to generate one-time password (OTP).
Assign SDE Mobile role to the Survey Engineers on IDM
Carryout Technical Site Survey (TSS/LOS) Allocation on SDE to ASP and follow up on delivery on timeline.
Verify the Survey reports quality to ensure all required information are captured in the reports.
Validating of Site Installation Document (SID) done by the GSC-P Team.
Coordinate and supervise IE resources (Pakistan) to provide any support required in the completion of the SID
Verifying/Study the BoQ to confirm all the materials needed ordered.
Preparing of Materials Delivery Request (MDR) base on site configuration wise on streamline.
Verifying the materials kitted in the WH to ensure all materials requested in the MDR are Kitted/released to ASPs.
Manage the WH to ensure all materials are handling in a proper manner.
Sharing the SIDs with ASPs and Local Delivery Team (LD) and following up to ensure installations are done as recommended in SID and it’s Red mark for As-Built.
Updating Erisite accordingly with forecast Planned and Actual date.
Schedule a pilot site for each ASP with all the stakeholder to align on all the quality requirement to meetup the customer expectation and E/// standard.
Surprised visit to site to check the quality usage of materials given to ASP.
Supporting ASP on any challenging facing related to installation, SID, Materials or Access to the site.
Support the ASP with RasberryP software to enable them to make use of IMK tool to test if any alarms on site.
Joint visit to sites with customer to carryout ATP.
Advanced Engineer RAN IE
Ericsson Libreville, Gabon.
Airtel Modernization & Expansion Project.
Feb. 2018 – May 2018
• Validating of Site Installation Document (SID) done by the GSC-I Team
• Coordinate and supervise IE resources (GSC India) to provide any support required in the completion of the SID
• Verifying/Study the BoQ to confirm if all the materials needed ordered
• Preparing of Materials Delivery Request (MDR) base on sites solution wise and sent to customer for approval
• Verifying the materials kitted in the WH to make sure all materials requested in the MDR are Kitted/released to ASPs.
• Manage the WH to make sure all materials are in other according to the stock report
• Loading/Integration of Base Band 5212/5216
• Sharing the SIDs with ASPs and Local Delivery Team (LD) and following up for Red mark to Complete As-Built
• Updating SH accordingly with Planned and Actual date.
Advanced Engineer RAN IE
Ericsson Ramallah, Palestine (Remote Support).
Jawwal 3G & Expansion Project.
September 2017 – December 2017
• Validating of Site Installation Document (SID) done by the GSC-C Team
• Coordinate and supervise IE resources (GSC China) to provide any support required in the completion of the SID
• Verifying/Study the BoQ to confirm if all the materials needed ordered
• Preparing of Site Materials Request (SMR) based on sites configuration
• Preparing of BPS Request and sent to Supply team
• Preparing of Materials Return (MRN) for unused/Faulty materials
• Sharing the SIDs/SMRs with ASPs and Local Delivery Team (LD) and following up for Red mark to Complete As-Built
• Updating Erisite accordingly with Planned and Actual date.
• Uploading of SIDs/SMRs to Erisite
RAN IE Advanced Engineer
Ericsson Victoria Island, Lagos, Nigeria
Smile/Natcom LTE 4G Project.
October. 2015 – September 2017
• Creating of Site ID’s on SDE Tool (new Ericsson TSS Tool).
• Allocating of Site to ASPs on SDE Tool.
• Supporting ASPs on site if any Technical issues or blockage/show stopper.
• Validating TSSR and Send to Radio Network Design (RND) department to confirm the proposed height of RF Antenna.
• Collation of Line of Site Report (LOSR) from ASP’s and send to Transmission Network Design (TND) Department to confirm if there’s line of Site.
• Submitting TSSR to Customer to verify the Quality of the Report.
• Preparing of CURF and sent to customer to issues ITP to Tower Vendor.
• Preparing the AUTOCAD drawing for the site layout and proposal.
• Preparing the TSSR report and documents for SMILE/NATCOM Project.
• Creating of Site Installation Document
• Update of SID with As-Built changes
• Delivery of Final As-Built to Customer
• Manage RSSA and GSC India IE resources as required to fulfill the above.
• Coordinate and supervise IE resources (RSSA and/or GSC India) to provide any support required in the completion of the SID
• Quality Checks to ensure accuracy and completeness of all information within the SID
• Creating of Preliminary and Final variants of the SID to facilitate site approvals and the installation & integration of RBS and transmission equipment for every site in the network rollout
• Technical Site Survey report
• Line of Sight Survey Report
• Radio Network Design site parameters spreadsheet
• Transmission Network Design site parameters spreadsheet
• Microwave Link Budgets
• BoQ
Advanced Engineer (RAN IE)
Ericsson Addis Ababa, Ethiopia
Ethio Modernization/New Site Project
April. 2015 – August 2015
• Preparing the AUTOCAD drawing for the site layout and proposal.
• Preparing Low Level Design (LLD)
• Getting Low Level Design (LLD) Approval from Customer
•Preparing the TSSR report and documents for Ethio.
• Creating of Site Installation Document
• Release the Installation Document to Implementation Team
• Creating Materials Request (MR) and punch on SAP
• Update of SID with As-Built changes
• Delivery of Final As-Built to Customer
• Creation of Preliminary and Final variants of the SID to facilitate site approvals and the installation & integration of RBS and transmission equipment for every site in the network rollout
RAN Installation Engineering Team Lead/Manager
Ericsson Victoria Island, Lagos, Nigeria
Smile LTE 4G Project.
March. 2014- April 2015
• Preparing the AUTOCAD drawing for the site layout and proposal.
• Preparing the TSSR report and documents for SMILE LTE evaluation.
• Creation of Site Installation Document
• Update of SID with As-Built changes
• Delivery of Final As-Built to Customer
• Manage RSSA and GSC India IE resources as required to fulfill the above.
• Coordinate and supervise IE resources (RSSA and/or GSC India) to provide any support required in the completion of the SID
• Quality Checks to ensure accuracy and completeness of all information within the SID
• Creation of Preliminary and Final variants of the SID to facilitate site approvals and the installation & integration of RBS and transmission equipment for every site in the network rollout
• Technical Site Survey report
• Line of Sight Survey Report
• Radio Network Design site parameters spreadsheet
• Transmission Network Design site parameters spreadsheet
• Microwave Link Budgets
• BoQ
Freelance Installation Engineer
Comptoir Commercial Du Benin (ASP)/Ericsson Benin
C/56 Tokpa Hoho- Cotonou Benin.
MTN RAN Modernization, 2G & 3G Project BJ22 and BJ23
June. 2013- Till Nov. 2013
Design & Implementation Engineer Working as Freelance Engineer (IE)
Coordinating Technical Site Survey (TSS)
Tss report prepare with AutoCAD Design
Preparing Technical Site Survey Report (TSSR)
Create Site Installation Document (SID)
Supervise ASP on site to carry on the Installation According to standard
Site Design Document (SDD)
Update of SID with AS-Built Change
Delivery of Final As-Built SID to Customer
Planning weekly work schedule
Coordination with Acquisition Team
Cleanup for ATP
Freelance Installation Engineer
Intelligence Era Ltd. (ASP)/Ericsson Benin Republic
MTN RAN Modernization, 2G & 3G Project BJ22 Project
June. 2013- till Nov. 2013
Design & Implementation Engineer working as Freelance Engineer (IE)
Coordinating Technical Site Survey (TSS)
Preparing Technical Site Survey Report with Auto Cad (TSSR)
Site Installation Document (SID)
Create Site Installation Document (SID)
Site Design Document (SDD)
Update of SID with AS-Built Change
Delivery of Final As-Built SID to Customer
Planning weekly work schedule
Coordination with Acquisition Team
Installation Engineering Team Lead
Free Energy Resources Ltd. (ASP)/Ericsson Benin
MTN RAN Modernization, 2G & 3G Projects BJ21 & BJ22 Project
Sept. 2012- till June 2013
IE Engineer Team Lead
Performing Technical Site Survey
Preparation installation engineering drawing with Auto-CAD (drawing showing position of antenna & other equipment on site).
Preparing detailed civil works for equipment on sites.
Coordinate and Prepares the Site Installation Documentation (SIDs) of 2G & 3G sites
Producing C-modules using Ericsson proprietary PPT-SE tool
Tss report prepare with AutoCAD Design.
Preparing Site Installation Document (SID).
Create Site Installation Document (SID)
Site Design Document (SDD)
Update of SID with AS-Built Change
Delivery of Final As-Built SID to Customer
Site Installation Engineer
Installation of Antenna and RRUs
Installation of Feeders and Jumpers
Cleanup for ATP
Site Handler
Acceptance Coordinator (MTN BJ21 and BJ22 Project Ran Modernization+3G and Cabinet swap at Benin republic over 160sites BJ21 and BJ22)
Planning weekly work schedule
Coordination with Acquisition Team
Installation Engineer
Springcell Integrated Technology/Ericsson Nigeria
MTN Fy12 and Ran Modernization Project
Feb. 2012- to July 2012
AutoCAD Design.
Implementation Engineer (IE)
Preparation installation engineering drawing with Auto-CAD (drawing showing position of antenna & other equipment on site).
Preparing detailed civil works for equipment on sites.
Site Installation Document SID (MTN project Ran modernization and Fy2012 Nigeria I did 133 sites both 2G Modernization and 3G only)
Design & Implementation Engineer
Kolslab & Associates. Emmanuel Junction, off governor road, Ikotun, Lagos. Feb. 2011 to Feb. 2012
Design & Implementation
Architectural design with Auto Cad and Revit Architecture 2D and 3D
Foundation and Blinding
Casting and setting out.
Site supervision
Under Training Architectural & Structural Design
Famous Consultant. Oluyeye Street, mafoluku, Oshodi Lagos.
July 2008 to Dec. 2010
Architectural and Structural Design
Industrial Attachment (IT Technical College)
ADE-BIMS & Associate.
Toyin Taiwo Street, Kola bus stop Agbado Area Lagos state.
July 2003 to Oct. 2003
Architect and builder
SPECIAL ATTRIBUTESAbility to work with minimal supervision.
Excellent team player.
Excellent computational and analytical abilities
SKILLSProficient in the use if Microsoft Office Suites: WORD, EXCEL and POWER POINT, AutoCad 2020, SDE tool, Site Handler, Erisite
Working knowledge of RBS/BBS6000 Family, DUW, DUG, TCI, SIU, Base Band 5212 and 5216, Radio 2217/2219
LEADERSHIP POSITION HELD
Ericsson
Advanced Engineer
Ericsson
Installation Manager
Koslab & Associate
Implementation Engineer.
Sodmous Concepts Ventures
Site Manager.
HOBBIESReading Quran, listening to good music, watching live matches.
REFFRENCE
Name: Abimbola NWANKWONTA
Position: Customer Project Manager
Email: ********.**********@********.***
Name: Echezona Ozumba
POSITION: Country Operations Manager
Email: ********.******@********.***
NAME: Bolanle Opeyokun
Position: Head of CPMs HUB WAFs
Email: *******.********@********.***
Phone Number: +234**********