COVER LETTER
Greetings!
I am writing to express my interest in the Quality Assurance/Quality Control in your esteemed organization. My attached resume highlights my experience and qualifications that closely align with the position description.
Career Objective
To undertake a challenging career opportunity in the Power, Fertilser and Cement anwhere I can utilize my broad training, skills and experience acquired over past 5.8 years across the Power & Fertiliser industry in key roles such as Quality Assurance/Quality Control Engineer. Multi-skilled and diligent team player and leader, I possess strong technical and problem solving skills with the ability to work at heights, in confined spaces, remote areas and challenging conditions. Confidently I would make a great addition to your team. I offer my 100% flexibility with proven track record of achievement in consistently promoting and adhering to workplace safety regulations. Physically fit and energetic, I am willing to complete a current Medical Certificate and undertake Drug and Alcohol Screening.
Curriculum Vitae
DEEPAK SINGH SOLANKI
Nationality : Indian
E-mail address : ***************@*****.***
Tel (MOB) : +919*********
Tel : +919*********
Skype Id : Deepak_kota09
OBJECTIVE:
A growth oriented and challenging career in an organization of very good repute, ethics and excellent work environment where I can exploit my technical skills and abilities to the fullest and optimize my personal and professional growth.
SUMMARY OF EXPERIENCE
Around 5.8 years of experience as a Quality Engineer in the field of construction,power,fertilizer and chemicals l,cement industries. Worked under the projects.
Encotec energy India Pvt Ltd
Cenlub Industries limited (Centralised lubrication System)
Dhar cement works (WHRB BOILERS)
Chambal fertilizer and chemicals ltd
2X660MW SUPERCRITICAL BOILER RAJASTHAN
EDUCATION:
B.E IN MECHANICAL ENGINEERING
University Of Rajasthan
Shankara Institute Of Technology,
Kukas,Jaipur,Rajasthan. [2004-2008]
Board Of Secondary Education,Rajasthan,India.
JLN Govt. Sr.Sec School,Bhimgangh Mandi,Kota
Kota,Rajasthan [2003-2004]
Matriculation, Rajasthan, India.
Tarey Secondary School, Kota
Kota,Rajasthan. [2001]
ADDITIONAL QUALIFICATION:
ASNT LEVEL II (RT,UT,DPT,MPI )
CSWIP 3.1,Issued by TWI Certification Ltd,UK
[Customer No. 712886]
EMPLOYMENT HISTORY:
Encotec energy India pvt ltd
Cenlub Industries Limited (Centralised Lubrication System) :12.04.2019-Till
Ayoki cembols erectors pvt.ltd. : 06.06.2018– 31.03.2019
Industrial radiographic services pvt ltd. : 01.11.2013– 30.12.2017
KEY SKILLS:
Familiar with projects Quality manuals, Quality assurance Inspection and Test plans,Procedures& Method statements
Establishing, implementing and maintaining the quality management system
Familiar with international codes and standards.
Familiar with Construction quality plan implementation
Performing in process and complete inspection of piping and components.
Experience in Test pack Preparation
Experience in Interface with Engineering department
Good knowledge in material Inspection.
Managing Clients complaints and initiating corrective actions
AREA OF EXPOSURE:
Quality Management:
Co-coordinating all Inspection(s) with the Sub-Contractor and client at site.
Prepare detailed records and reports for all Inspection(s) conducted at site, and maintain the Quality Control
Establish and conduct regular Quality Control meeting with the Sub-contractor and Clients.
Correlate, prepare and issue the Field Inspection Notice to the Client and co-ordination.
Co-ordinate and conduct Inspection(s) with any third party agencies wherever required.
Maintain all relative Site Inspection(s) records, for handing over to Client upon attaining completion.
Responsible for all Inspection(s) at site, including witnessing, recording and reporting the results and resolving problems arising.
Assurance of the Quality Control System wherever required.
Material:
Familiar with the inspection of incoming materials, review of MTC’s.and certification requirements of the vendor supplied Piping materials.
Coordination with client for approval of vendor’s documents, procedures and ITP.
Review of material test certificates, purchase order, data and reports for compliance with client requirements.
Familiar materials SA106 GR-B, A335-P11, SA335-P22, SA335-P91, A312-TP304L, A358-304L, A312-316L.
Codes and standards familiar with:
ASME B31.1, B31.3
ASME sec V, IX,
PROFESSIONAL WORK EXPERIENCE:-
13.04.2019 –till Designation : Welding executive
Employer :Cenlub Industries ltd
Clients : Simens/Doosan Skoda power/
Project : complete Lube oil System
Write and review of the welding documents like WPS, PQR,WPQ
Conducting Welder Qualification Test.
Checking of line and stracture fit up before welding and give the clearance for welding.
Monotoring the electrode backing oven and its handling followed by according to electrode manufacturer recomdation.
Monotoring of production of welded pipe lines.
Root cause ananlysis of welding defects which is generate during welding and try to overcome from that.
RT film interpretation of welded pipe lines.
Visual inspection of pipes and lube oil tank.
Hydro test of pipe lines.
06.06.2018–31.03.2019 Designation : QA/QC ENGINEER
Employer : Ayoki cembols erectors pvt ltd
Client : Ultratech cement limited
Project : Dhar cement works
Inspection of fabrication and erection of stracture and plate work of bucket elevator,TA Duct, RA Duct, Conveyor gallery,Cyclone, Down comer Duct Raw mill bag house, Reject Bin,Silo etc.
Review of Field quality plan,WPS & PQR as per project specifications
Witnessing of WQR Qualification and certification of welders as per ASME Sec IX
Inspection of incoming material and fabricated equipment
Review of NDT Report and witness RT, UT, DPT, & MPT Inspection
Monitoring on going welding activities according to Welding procedure and qualification records.
Involved in stage and final inspection of fabricated items Fit Up inspection,Dimensional inspection,welding inspection
01.12..2016–10.02.2017 Designation : QA/QC ENGINEER
Employer : industrial radiographic services pvt ltd
Client : Onshore construction company pvt ltd
Project : Chambal fertilizer and chemicals limited III, Brown field project
Review of Project Specification and Welding control procedure.
Witnessing PQR and WQT and preparing the documents of the same.
Ensuring that the welding equipments and machines are in proper condition andcalibrated.
Checking whether the welding is done as per applicable WPS and that thequalifications of the welders are valid ID card.
Monitoring the fit-up, production welding and noting down the parameters andensuring that the welding is done as per the WPS parameters.
Monitoring the welding consumables during the storage as well as usage.
Checking inter-pass cleaning and inter-pass temperature during welding.
Offering NDT for the completed joints.
Review of NDT Reports.
Monitoring Repair welding as per the procedure.
To recommend and analyze the weld repairs as per the applicable specifications.
To make proper records of the various stages of welding and inspection andmaintain the documents as per the quality management system for propertraceability.
Doing visual inspection of completed joints and submitting daily weldinginspection report.
Raising NCRs for the non-conformed items which are not following thespecification.
In–charge of witnessing and reviewing documents for WPS, PQR and Welderqualification test.
Offering the NDT Inspection like RT, UT, MT, PT and hardness test after PWHTand verifying its results.
Corrective and preventive actions to all non-conformances reported by theSupervisors after checking.
Maintaining the records for PQR, WPS and Performance Qualification ofWelders (WQT).
Weld joints inspection before, during and after welding.
Monitoring the welding activities as per project specification and procedure.
Witnessing the preparation of Test Coupon for Procedure Qualification andwitnessing of destructive & non-destructive testing, as per project specificationand procedure.
Witnessing welder qualification test and qualifying welders for different basemetals, thickness and diameter ranges according to project specification andprocedure.
Controlling assignment related to welding and consumables.
Reviewing Filler Wires and Electrodes of WPS according to ASME Section II,Part C and also checking while welding.
Monitoring welding activities before, during and after welding operations.
Responsible for material receiving inspection and prepare reports.
Controlling the welding of joints according to Drawings and Checking diameter, Thickness, in welding Progress Report.
Carry-out Welding Visual Inspection and Preparing daily welder performancestatus.
Coordinating NDT activities, sub-contractors’ inspection activities, preparing andupdating daily NDT and repair status.
Responsible for Welding repair Analysis.
Reviewing Welding Procedure Specification and Welder Qualification.
Checking and controlling of consumables used in welding to ensure compliancewith WPS & Controlling Procedure.
Checking dimensions of materials to ensure that they are in compliance withrequirement on thickness of plate / pipes.
Inspecting quality standards for incoming raw materials (plates, formed andmachined components) to the required specifications.
Review of Inspection Test Plans and implementing inspection accordingly.
Responsible for maintaining records.
Ensure high operational standards and safe working of all personnel at all times.
Inspection of material and welding consumables as per Project Specifications.
Visual inspection of welding as per standards are identified at each stage anddirected for rework.
Issue NCRs for violation found during inspection.
Periodic check on existing inspection equipment for safe, reliable and continuedoperation.
Responsible for the preparing of the Test Packages and testing of materials.
01.06.2015 – 30 .11.2016 Designation : QA/QC ENGINEER
Employer : Industrial radiographic services pvt ltd
Client : L&T MHPS GROUP OF BOILERS
Project : 2X660MW SUPER CRITICAL BOILER, UNIT VI
RRVUNL CHHABRA RAJASTHAN
Materials received are as per the approved of client’s specification, necessary certificate and documents are received and complied with the project specification.
To ensure the welder qualification as per the code and standard.
Maintained welder qualification record, welding procedure specification and PQR.
To ensure JCC card for the welder before start the job for production joint
And maintain daily welding report (DWR)
To ensure the NDT test is require for the joint
Reviewed register for all repair and for penalty shots taken for percentage radiography.
Preparation of radiography schedules, interpretation of films, also preparation of handing over documents for the project.
Control the consumables for welding storage / issue / usage.
Visual inspection of fit-up joints prior to the welding, during welding & after welding
Identifying the root causes of the welding related problems and taking the corrective and preventive actions.
Coordinate the job with the Client for Quality Control.
Preparation of “Request for Inspection” (RFI) as per ITP.
Preparation and monitoring of Non-Conformance reports (NCR).
Co ordination with client for making regular inspection.
Preparing all paper work(documentation)by using MS Office, filling, maintaining all records up-to-date, keeping backup copy (hard & soft) and bring-up’s, bring forward & reminders to my superiors.
Preparing Weekly/Monthly progress report.
01.02.2014– 01.04.2015 Designation. : WELDING INSPECTOR
Employer : INDUSTRIAL RADIOGRAPHIC SERVICES PVT LTD
Client : BGR ENERGY SYSTEM
Project : 2x660 MW,Kali Sindh Power Project,Unit II
RRVUNL JHALAWAR
Qualifying the welders as per approved WPSs.
Witnessing of welding activities during the construction and fabrication of the project.
Ensure that consumable handling procedure is followed.
Electrode selection as per client
Check storage of filler materials.
Visual inspection of weld Visuals.
Adopting the regular procedure to reduced distortion
Arranging the client inspection every day and making daily progress reports.
Conducting Toolbox talk for welders, fitters & grinders also.
Calibration of welding rectifier and DC generators
Calibration of portable oven and electrode baking oven
Welder qualification record and shall conform to approve welding procedure specification.
Ensured all welders have their job clearance card prior to start welding as per project requirement.
Prepared visual inspection reports and maintain records as per client requirement.
Performed continuous in-process welding surveillance in both fabrication and erection. Issued Surveillance and Non Conformance Reports for Discrepancies observed.
Computer Skills
Touch Typing : Excellent
OS Environment : Windows XP/Vista/7/ 8.
Software : MS office 2003, 2007, Excel,Internet
Language
English Oral: Excellent. Written: Excellent
Hindi Oral: Excellent Written: Excellent
Personal Information
Permanent Address : DEEPAK SINGH SOLANKI, HOUSE NO.158/167
STREET NO.3,SARASWATI COLONY,ROTEDA ROAD
KOTA JN.RAJASTHAN, 324002
D.O.B : 9 th OCTOBER 1984
Marital Status : MARRIED
Passport Number : L3646268 Expiry Dt: 13.10.2023
DECLARATION
I hereby declare that the above particulars furnished by me are true to the best of my knowledge and belief. I assure you, if I am given a chance, I will execute my work to the fullest satisfaction of my superiors.
Place: KOTA DEEPAK SINGH SOLANKI