Seeking challenging career with progressive organizaton that provides an opportunity to capitalized my technical skills and abilites in the eld of constructon and fabricaton engineering
Work Experience :
2011-2020 Aboitz Constructon Inc./AEV Building Banillad, Cebu City, Philppines Fabricaton/Constructon/Piping Supervisor
Length of service: 9 years
ABOITIZ CONSTRUCTION INC. former METAPHIL which is specialized in various elds such as steel fabricaton and erecton works; constructon works of various plants such as mining, petrochemical, power, food food processing, and other types of plants equipment and facilites, reclamaton projects, pier, wharfs, power plant and others. It is also recognized natonwide eecient risks manager of process critcal constructon works by insuring quality, reability, integrity, and safety. It is also craters various client’s in Dubai, Australia, Papua New Guinea, Calidonea, Chile, USA and other countries natonwide for diferent steel Fabricaton.
Responsibilites:
Understanding the project in terms of scope, milestone, and methodology.
Coordinatng work among the trade supervisors assigned to ensure productvity is maximized.
Deploying of area targets.
Reviewing operatons to promote safety and eecient utlizaton of labor, plant, and materials.
Ensuring labor force is instructed in methods of working to comply with company procedures, method of statements, and safe working practces. Carrying out safety toolbox talks as directed by the safety oecer.
Assistng in the preparaton of works instructons and method of statements for works. Giving feedback comments or changes required to the descripton of the actvites.
Organizing for and construct the works in accordance with the weekly programmes.
Ensuring materials are controlled, stored, and used to avoid waste. Signof Requisiton and Issue Slip.
Ensuring Site Daily Logs are prepared as directed.
Analyzing variances whenever noted on site for the following and be able to document such as variances if infuenced by unforeseen site conditons:
1. Manpower actvity
2. Equipment utlizaton
3. Fuel consumpton for equipment
4. Variance of manpower loading and equipment
loading
Monitoring and preparing weekly and monthly reports for submission to the project superintendent inputs relatng to his assigned trade on the following:
1. Potental variance order as seen on site relatng to the AFC drawing being referred Constructon and
Fabricaton.
2. Constructon and fabricaton problems.
3. Work requirement.
Ensuring rect caton and closing issued Correctve Acton Request for Efectveness (CARE) raised internally.
Maintaining good relatonships with the Client’s
representatve,
Maintaining good industrial relatons practces to comply policy and avoid undue confict with the labor force,
Conductng weekly work and safety coordinaton meetng to be attended by all domestcs and nominated subcontractors in his assigned area.
Coordinatng with Engineering Group or the Project Superintendent for early resoluton of technical queries of subcontractors of various disciplines.
Coordinatng with various works disciplines for early resoluton of problems that will be encountered.
Conductng weekly walk-thru together with all subcontractors. Project Assignments:
1. Project Name: PPX and PE3 Expansion (Fabricaton and Erecton such as Piping and Structural)
Client: JG Summit
Address: Simlong, Batangas City, Philippines
Year: 2019 – 2020
2. Project Name: Kiln upgrade in New Cement Mill (Fabricaton and Erecton of Bag Filter and other Structure
and Piping and Installaton of Belt & Chain
Conveyor.
Client: RCBM
Address: Norzagaray, Bulacan, Philippines
Year: 2018 – 2019
3. Project Name: LIMA Outlets Project (Civil Works, Plumbing, Structural, and Fire Protecton)
Client: LIMA Land
Address: Lipa City, Batangas, Philippines
Year: 2017 – 2018
4. Project Name: 3 units Boiler 55 MW Coal Fire Thermal Power Plant (Structural, Piping, and etc,)
Client: Mitsubishi Corporaton
Address: Balingasag, Misamis Occidental, Philippines Year: 2016 – 2017
5. Project Name: Ship Fabricaton, Assembly and Erecton Client: Hanjin Heavy Industries and Construton
Address: Subic, Zambales, Philippines
Year: 2015 – 2016
6. Project Name: Fabricaton of DOW LHC-9, 8 units Ethelyn Furnace
Client: TECHNIP, Texas, USA
Address: Arpili, Balamban, Cebu, Philippines
Year: 2014 – 2015
7. Project Name: Fabricaton of Structural Steel Grinding Cement Mill, Feeding Hopper, & Gallery Pan Conveyor
Client: PEG South East Asia
Address: Arpili, Balamban, Cebu, Philippines
Year: 2013 – 2014
8. Project Name: Fabricaton of Stober Damper Diverter, Guilloten Damper and Bypass Stock System
Client: NEM Power System, Mong Duong, Vietnam
Address: Arpili, Balamban, Cebu, Philippines
Year: 2012 – 2013
9. Project Name: Fabricaton of 6 units Process Tanks Client: RIVS Company
Address: Arpili, Balamban, Cebu, Philippines
Year: 2012 – 2013
10. Project Name: Fabricaton of 7 units Liquid Cracking Furnace and 5 units Gas Cracking Furnace
Client: TECHNIP-DAELIM, Sandara, USA
Address: Arpili, Balamban, Cebu, Philippines
Year: 2011 – 2012
2007-2011 Aboitz Constructon Inc./AEV Building Banillad, Cebu City, Philppines QC Inspector
Length of service: 4 years
Responsibilites:
To prepare and supervise implementaton of Projects Quality Program covering speci c Quality Plan for each phase of actvites and the corresponding test and inspectons to be conducted acceptance criteria.
Perform periodic site inspecton.
Help develop quality planning processes and procedures.
Create and maintain reports and other monitoring systems for quality actvites.
Perform test and otherwise measure and analyzed products and process as dictated by their rm’s quality policies and procedures.
Responsible for ensuring that the products within quality standards and speci catons.
Review plan drawing.
Inspect materials received according to data sheets, drawings, and speci catons.
Evaluate mill cert cates to proper code, standards, and speci catons.
Prepare Welding Procedures Speci caton (WPS) and Procedure Quali caton Record (PQR) America (ASME/AWS) and Australian Standards Conduct Procedure Quali caton Test (PQR).
Prepare Inspecton Test and Plan (ITP).
Conduct Welders/Welding Operators/Tack Welders
Quali caton Test.
Prepare Welders/Welding Operators/Tack Welders
Quali caton Record.
Conduct dimensional and visual inspecton on lay-out, cutng, and t-up.
Witness and conduct Non-Destructve examinaton (NDE) of the following:
1. Visual Test (VT).
2. Liquid Penetrant Test (PT)
3. Magnetc Partcle Test (MPT).
4. Ultrasonic Test (UT).
5. Radiographic Test (RT).
Conduct inspecton of paintng.
Conduct on line checking and punch listng of completed system.
Witness compressive test of concrete materials.
Witness mechanical test of steel materials.
Prepare materials for Mechanical Testng (PQR & WQT).
Facilitate calibraton/veri caton of monitoring and measuring devices.
Project Assignments:
1. Project Name: Fabricaton of 6 units Waste Heat Recovery Client: ONQUEST, Australia
Address: Arpili, Balamban, Cebu, Philippines
Year: 2010 – 2011
2. Project Name: Kool Adventure Camp (Civil Works, Structural Architectural Works)
Client: RAFI
Address: Cansomoroy, Balamban, Cebu, Philippines
Year: 2010 – 2011
3. Project Name: Installaton Wharf Fender, Concrete Foundaton and Repair Pier Column Foundaton
Client: TADECO
Address: Panabo City, Davao del Norte, Philippines Year: 2010 (6 months)
4. Project Name: Warehouse Renovaton and Constructon of New Administraton Building
Client: Philippine Foremost Milling Corporaton
Address: Lapuz, Iloilo City, Philippines
Year: 2009 - 2010
5. Project Name: Modular Fabricaton Building Constructon Client: ACII
Address: Arpili, Balamban, Cebu, Philippines
Year: 2008 - 2009
6. Project Name: Fabricaton of 35 units Flotaton Cells Nui Phao Mining
Client: Metso Minerals, Australia
Address: Basubas St., Tipolo, Mandaue Ciy, Cebu, Philippines Year: 2007 - 2008
7. Project Name: Fabricaton and Pre-Assembly 15m dia. Thickener, 24m dia. Tailing Thickener 3
Units 15m dia, CCD Thickener and 17m
Clari er
Client: Outotec, Sydney, Australia
Address: Basubas St., Tipolo, Mandaue Ciy, Cebu, Philippines Year: 2007 – 2008
8. Project Name: Fabricaton of Stacks and Ducts
Client: TECHNIP, USA
Address: Basubas St., Tipolo, Mandaue Ciy, Cebu, Philippines Year: 2007 - 2008
9. Project Name: Fabricaton and Pre-Assembly 42m dia. High Rate Pre-Leach Thickener Akyem
Client: Outokumpo Technology Pty. Ltd.
Address: Basubas St., Tipolo, Mandaue Ciy, Cebu, Philippines Year: 2007 - 2008
10. Project Name: Fabricaton and Pre-Assembly of 24m di. High Rate Thickener CCD Thickener 24 units Rougher
Flotatons Cell OK TEDI Mining Mine Waste and
Tailing Project 27m dia. High Rate Thickener
Client: Outotec, Sydney, Australia
Address: Basubas St., Tipolo, Mandaue Ciy, Cebu, Philippines Year: 2007 - 2008
2000-2005 Asephil Manufacturing Corporaton / Plaridel St. Alang-allang, Mandaue City, Cebu, Philippines
QC Supervisor
Length of service: 5 years
ASEPHIL MANUFACTURING CORPORATION which is specialized and expert in manufacturing, repair and reconditon of valves of LPG cylinder which include in various types of processing such as welding, annealing, hydrotestng, cooling, paintng, leak testng. It also craters the various Client’s in Caltex, Petron, Shell, Pryce Gas, Petronas, and etc.
Responsibilites:
Approve of all cylinders which is ready for quali catons for visual inspecton and which is repaired and for other processing and testng.
Approve in process producton by con rming required speci caton, conductng visual test and measurement tests and communicatng the required adjustments to the
producton supervisor.
Approve all nished products by con rming speci catons and conductng required test on each process.
Document and update inspecton results completng results and logs per process.
Keep measurement equipment operatng by following operatng instructons and calling for repairs.
Maintain safe work environment by following standards and procedures.
1997 - 1999 Tesco Services Inc. / Sheridan St. Mandaluyong City, Metro Manila, Philippines
Engineering Assistant
Length of service: 1.5 years
TESCO SERVICES INC. this company is working in engineering business actvites which involve telecommunicaton actvites, engineering consultancy, carpentry and fabricaton work.
Responsibilites:
Determines engineering requirements by conductng inspectons, survey, analytcal test, analyzing and
synthesizing data, maintaining control charts, determining root causes and preparing bid speci catons.
Preparing drawings, schematcs, diagrams, evaluatng the areas for speci catons and study the areas quali catons.
Conduct survey and interview each household, building administraton and industries which include for studying for identfying the building categories
Plot and drafs the nished survey and inspecton for the actual design.
Veri es engineering applicatons by conductng test inspecton and analyzing design of building quali caton for the telecommunicaton results.
1996 Aboitz Constructon Inc./AEV Building Banillad, Cebu City, Philppines Materials Engineer
Length of service: 1 year
Responsibilites:
Assist shipping and receiving unloading and checking materials.
Prepares orders by processing requests and supply orders and placing materials/tools and equipment with segregaton and properly arrangement according to each sizes and categories.
Sort and place all materials, tools, and equipment on racks or shelves according to organizaton standards.
Maintains inventory controls by collectng stock locaton orders, recording amounts of materials or items received or distributed through a computer
Also assist in countng of physical inventory.
Make Warehouse Receiving Report (WRR) and Warehouse Issuance Slip (WIS).
Responsible to provide issuance of materials, tools, equipment, and PPE’s to the workers by recording in borrowers card each worker.
Maintains safe and clean work environment by keeping shelves or racks and work area neat and organize warehouse and work area for orderliness at all tmes.
Education Atainnment :
1990 – 1995 University of San Jose-Recoletos
Bachelor of Science in Mechanical Engineering / Graduated Mechanical Engineer / PRC no. 0050958
1989 – 1990 University of San Jose-Recoletos
Cert cate of Computer Science / Undergraduate
1985 – 1989 University of Cebu
Secondary Educaton
Graduated
1985 – 1989 Subangdaku Elementary School
Primary Educaton
Graduated
Skills :
Microsof Oece (MS Word Excel, Power Point, Paint Brush, Internet, etc.).
Excellent in written and verbal communicaton.
Ability to work independently or as part of a team.
Proven leadership skills and ability to motvate.
Team building, problem solving and decision making. References :
Ric M. Ofqueria
Aboitz Constructon Inc.
Constructon Manager
Garlitu B. Baruc
Aboitz Constructon Inc.
Project Manager
Renante P. Gala
Aboitz Constructon Inc.
Sr. Supervisor
Ramon Rius
Aboitz Constructon Inc.
QSHE Manager
091782o9724
Vann Romulus C. Caballero
Aboitz Constructon Inc.
Sr. Supervisor
Christopher Y. Comandao
Aboitz Constructon Inc.
Sr. Supervisor