Post Job Free

Resume

Sign in

Instrumentation Engineer

Location:
Kolkata, West Bengal, India
Salary:
6LPA - 8LPA
Posted:
March 02, 2021

Contact this candidate

Resume:

Dweepee Sengupta

Email : adkly4@r.postjobfree.com

Mob: 967-***-****

West Bengal, Kolkata-700008

Career Objective: An introspective, energetic Electronics & Instrumentation B.Tech Graduate with functional teamwork capabilities. Instrument Engineer with 1.5+ years of experience, was working with Yash Pakka Ltd. in Instrument department. Seeking to grow and grow with.

Academic Profile:

Was pursuing a job in Yash Pakka Ltd as an Instrumentation Engg. Have come across the May 2018-December 2019 Theoretical things in a very practical way.Got an exposure to learn new things and a practical knowledge about Instrumentation, tools, and many other branches. Industrial Training:

Vocational Training in Southern Generating Station at CESC Ltd, Kolkata May 2017-June 2017 Gained basic knowledge about the overview of a power-plant

Vocational Training at DCIPS Pvt Ltd, Kolkata. Gained very basic knowledge about the May 2016-June 2016 control system and instrumentation

Project:

● Thermal Power Generation May 2017-June 2017

Experienced and learnt how the thermal power generation takes place by the combustion of coal. Got industrial exposure and this practical experience will help in better understanding and enhancement of knowledge.

● Ash Handling System May 2016-June 2016

Got to know about the ash handling process

Gained knowledge about different valves and their flow processes.

● CEMS December 2018- June 2019

The successful completion of the Continuous Emission Monitoring System project for the powerplant stacks led to proper communication of the plant and the CPCB server and maintenance of the system was done whenever the emission level increased or decreased as per the norms declared by the CPCB.

● Asset Development and its update in the company’s System January 2019- March 2019 The continuous update of the Instrument inventory was successfully completed till date using the SAP platform and proper cost to company from the Instrumentation end was known.

● Pest Control System installation February 2019 – March 2019 The successful pest control lead to the greater productivity and mostly zero breakdown of the powerplant leading to greater efficiency.

● Contractor list update in the company data base June 2018- December 2019 Addition of internal and external contractor on a monthly basis to get a knowledge of monthly expenses for both the maintenance and project work of instrumentation, related to the improvisation of the plant productivity and efficiency was successfully completed till date.

● Process flow chart development and monitoring sheet preparation July 2018- December 2019 Preparation of flow of processes and Monitoring sheet was successfully completed for all the instrument and maintenance related activities taking place within the plant premises till date.

● QTF project May 2018- December 2019

The completion of the project for the washer region led to high productivity and less use of chemicals and improvement of the quality of the pulp. The observations of the project was elaborately announced and presented in the IPPTA forum. CLASS SCHOOL/COLLEGE STREAM BOARD/

UNIVERSITY

%/CGPA YEAR OF PASSING

B. Tech. (E&I) KIIT ELECTRONICS

ENGG

KIIT UNIVERSITY 8.16 2018

XII BBGHS SCIENCE WBCHSE 72% 2014

X BBGHS REGULAR WBBSE 88% 2012

● Electrical Drive taken in line with the DCS for the powerplant Dearator and Feed pumps Oct 2018 – December 2018 Both the analog and digital signals namely Speed reference, Speed increase, speed decrease, RPM of the pump and the motors was successfully implemented with the help of Electrical drives. Skill Set:

● Basics of SAP and have worked in the PM module

● Software Programming Language: Basic knowledge of ‘C’

● Have hands on expertise on control valves (temperature, pressure, flow, level, etc)

● Have worked on the transmitters (Pressure, flow, temperature, level, consistency (blade and moving type), etc)

● Have worked on RTD’s ( including the type used in Turbine) and Thermocouple

● Have worked on the DCS (Honeywell) along with the ferrule making procedure

● Have proper knowledge of making the techno commercial BOM as per the requirement cited. Roles and Responsibilities.

● Supervised the pulp mill and Powerplant on a regular basis and attended the problems /faults at the site along with Strategy development and preparation of joblist and supervision along with getting the work done during the plant shut within the stipulated periods as an Instrument Engg

● Consistency transmitter value set up, Flow, level, temperature, pressure transmitter installation, problem detection,Vibration probe installation at the turbine during the turbine shutdown, RTD, Thermocouple installation and overhauling to detect the problems and their tracings during the plant shut as an Instrument Engg and a trainee

● Control valve overhauling, removal of scaling, ordering of parts, compressor overhauling and maintenance which needed to be replaced during the plant shuts as an Instrument Engg and a trainee

● Work-order, Purchase-requisition, Asset update, etc preparation using SAP platform as an Instrument Engg and a trainee

● Took active participation in all the maintenance related activities with the plant premises as an Instrument Engg and a trainee

● Have been the Organiser for the KIIT FEST 2017

● Have been an active member of NSS from 2015-2018

● Have been the Organiser for the IMDF 2017

● Have been the Assistant Coordinator for the KIIT FEST 2016 Honours & Accomplishments:

● Successfully completed the training within the stipulated period and was the first member of the group to get the confirmation

● Successful completion of the CEMS project

● Successful completion of the Asset update in the SAP platform

● Successful installation of the pressure and temperature control valve of the deaerator

● Successful value set up for the consistency transmitter after running lab tests for a month

● Successful implementation of the Pest control system within the plant premises

● Successfully organised and conducted the Diwali Party for the plant

● Achieved 1st position in group song held on the eve of Sadbhavna Diwas 2016



Contact this candidate