A goal-oriented Electrical Engineer with over * Years of experience in Middle Management expertise in Project & Contract Operations Site & Construction Management and Team Management in the Construction Industry
Skilled at dealing with Conceptual Studies, Project Scopes, Installation, Design Review, Execution Report Submission, Client Coordination, Quantity Surveying, Billing, Testing and Commissioning of Electrical Distribution System (MV & LV).
Experience in Fiber Optic Cable Installation by Air Blowing Method, Splicing and Testing with OTDR
Completed CADD ARABIA Course in Fiber Optic Cable Testing and Splicing in Doha, Qatar (Valid Till- Nov’21 & Certificate No:CAFO2111191050)
Knowledge in Industrial and Constructional Safety; Installation, testing and commissioning of Indoor substations.
Knowledgeable in preparation of method statements, material submissions, Inspection test plans and all related documents to the project
Expertise in installation and commissioning of Street lighting works including excavation, cabling, earthling pole installation, maintenance and so on
Understanding of MEP division & other utilities (Fire Alarm system, Smoke detector, ventilation systems, plumbing and so on)
Experience in11 KV and LV networks and cables including Kahramaa shutdown and testing procedures
Maintained strong working relationships with clients at all levels' ascertained project objectives, requirements and budgets, provided clients with various construction options
Front Office Operations
Hospitality Management
MIS Reporting
Client Relationship Management
Quality Management
Cost Optimization/Budgeting
Problem Solving
Revenue Generation
Team Building & Managment
Nov’16 – Jan’20 with Mastro Qatar Co. Ltd. WLL, Doha, Qatar (11 KV Distribution 1st grade contractors delivering services on Kahramaa, Ashghal projects and so on) as Electrical Site Engineer
Project: Design and Construct New Orbital Highway and Truck Route P023-Contract 3
Client: Ashghal, Public works authority, Qatar
Main contractor: HLG-AL Jaber Engineering
Sub-Contractor for all Electrical & Street lighting works: Mastro Qatar
Key Result Areas:
Managing multiple, simultaneous project issues, including development of project estimates and bids, work scheduling, contractor hiring and coordination, material purchasing, contract negotiation, construction site supervision and inspection, quality assurance, change order negotiation and processing, permit acquisition and cost analysis
Participating in design, layout and execution of foundations, concrete forms, roofing systems, flooring, electrical rough-in, finish work, and custom fabrication
Contributing in Installation of Substation, transformer, circuit breaker and package unit
Inspecting work to ensure compliance with plans, specifications and relevant codes
Implementing and maintaining safety and quality control standards
Detecting some design flaws early during the construction and delivered a viable solution promptly
Coordinating with KAHRAMAA, clients, contractors and various other agencies to keep development process proactive 100% project completion on time while meeting timelines and budget requirements
Preparing shop drawings, as built drawings, single line diagrams, DB schedule and cable schedule
Providing customer services with troubleshooting maintenance issues, scheduling repairs and follow through to assure quality repair, timeliness and customer satisfaction
Guarantying continuous improvement in the project by Organizing resources both material and human through planning, Load Scheduling Maintain harmony among workers Adjust errors and complaints
Preparing BOQ and shop drawings with respect to the site coordination for the project execution
Documenting daily report and forwarding to the Client, Contract Manager/ General Manager
LUS-CP08A2-Infrastructure & Landscaping Works for Villas at Qetaifan Island
LUS-CP08A1-Infrastructure & Landscaping at Spine and Marina Roads Project
Client: QPM, Qatar
Main contractor: Midmac Contracting Company WLL
Sub-Contractor for Electrical Works-11kv Substations (MV/LV/FOC):Mastro Qatar
Highlights:
Provided hands-on direction in interpretation and modification of blueprints, layout work, equipment utilization and construction plans in addition to coordinating with senior management, clients, contractors, architects, engineers and vendors throughout project lifecycles
Created daily reports regarding production, project status and construction equipment, with additional responsibility for budget formulation and control issues
Provided comprehensive training in all aspects of construction document processing and follow-up, time management, and task coordination
Worked on Fiber Optic cable installation using Air blowing method and manual pulling method through HDPE ducts
Installed OTB and termination of FO cable using connectors and patch cards
Participated in Optical fiber Splicing Enclosure physical construction, fiber optic cable testing, Optical fiber cable splicing, Optical Source, Detector and provisioning Expert in managing tools like OTDR
Networked and data communication Thorough with specified data communications protocol concepts In-depth understanding about the optical fiber transmission
Created the FO Cable reports using OTDR software
Managed operations involving Reviewing test certificates, in-process inspection and coordination with the consultant
Developed and enforced company policies, procedures and project safety regulations and successfully completed assigned projects ahead of schedule
Received appreciation letter from consultant in current project for excellent performance
Dec’13 – Mar’16 with Encore Construction Consortium Pvt. Ltd., Chennai, India as Electrical Engineer
Project: TCS Project, Trivandrum - Kerala – India
Highlights:
Led a team to attend a program on Hybrid Wind and Solar System conducted by Power Grid Corporation of India Limited Gridtech2013 and won prizes in New Delhi
Participated in Site supervision, Manpower/Equipment/Machinery control, manages and Coordinate with Sub-Vendor
Managed profits and losses, technician hours, site budgets, maintenance schedules, and customer relations
Provided technical expertise and recommendation to government agencies, NASA Wallops Flight Facility, related to cable and harness
Contributed in external and internal electrical including substation (power, lightning, Earthling, ups, and so on)
Supported Installation, Design Calculations, Supervision and Maintenance of electrical works
Assisted in preparation of Electrical Wiring, Cabling, Panel erection, transformer and DB erection
Inspected all paperwork and ensure that all tooling and rigging is has been certified and is in compliance
Coordinated layout drawing for power, control, wiring, schematic, earthing of all building drawing, single line diagram and cable schedule, identical segment
Reviewed test results and identified root cause for hardware failures through design review and performed non-conformance dispositions
Participated in project electrical work plan development, executing, quality, operation and safety enhancements to firm’s product lines
Preparation of lightning & cable layout; Supported of technical project with multiple department & system workflow
Scheduled client’s meetings, conducted needs assessment, explained design concerns and cost-effective options, planned estimated and managed project from starts to finish
Prepared the material schedule with respect to the progress of execution and maintain the MIR and test certificates
Microsoft Office (Word, Excel & PowerPoint)
Adobe Acrobat DC
AutoCAD 2016
Windows 10, Windows 7, Mac OS X
2019: Master of Business Administration (Operations Management) from College of Engineering, Anna University
Distance Education, Chennai, Tamil Nadu with 62%
2013: Bachelor of Engineering (Electrical and Electronics Engineering) from Paavai Engineering College, Affiliated to Anna University from Namakkal, Tamil Nadu with 72.3%
2009: 12th (Science) with Computer Science from Kongu Matriculation and Higher Secondary School, Morappur, Tamil Nadu with 76.92%
2007: 10thfrom Kongu Matriculation and Higher Secondary School, Morappur, Tamil Naduwith 70.36%
Date of Birth: 15th July 1992
Languages Known: English, Tamil & Malayalam
Address: 121/195, Vaguthupatti (post, villa), Pappireddipatti (TK), Dharmapuri (DT)-635302, Tamil Nadu, INDIA.
Passport No.:N5791628 (Expires on 11/01/2026)
Driving License: TN29T20140003425 (Status (India) Expires on 06/04/2034)
Nationality: Indian
I do hereby declare that the particulars of information and facts stated herein above are true, correct and complete to the best of my knowledge and belief.
Place:
Date :
(NAVEENKUMAR ANNADURAI)
NAVEENKUMAR ANNADURAI
Achievement-driven and High Performance Management Executive istargeting assignment in Planning /Installation & Commissioning / Project Management & Project Co-ordination in an organization of high repute preferably in Engineering, construction and Contracting Sector. Location Preference: Gulf Country (Qatar, Dubai, Bahrain, Kuwait, Saudi Arabia, Oman)/ Singapore
Phone: +91-965*******, +974******** Email: ******.**********@*****.***
Profile Summary
Core Competencies
Work Experience
Previous Experience
Technical Skills
Education Qualification
Personal Details
DECLARATION