Post Job Free

Resume

Sign in

Plant Water Treatment

Location:
Gangarampur, West Bengal, India
Salary:
6 lacks
Posted:
March 01, 2021

Contact this candidate

Resume:

RESUME

SHIB SANKAR SARKAR

Contact Details:

Phone No.: 760-***-****

E-Mail - adkk6z@r.postjobfree.com

CAREER OBJECTIVE:

To gain a working exposure in your prestigious organization, which would add to my professionalism, required in the industry and will certainly improve my interpersonal skill and of course for better future prospect.

EDUCATIONAL QUALIFICATION

Passed H.S from West Bengal Board of Higher secondary Education with 41.00% marks in the year 1997.

TECHNICAL QUALIFICATION

Survey I.T.I from East Technical Institute Burdwan, Uchalan(West Bengal) with 64% marks in the year 2002.AUTOCAD 2D.

COMPUTER PROFICIENCY:

Proficient in MS Dos, MS Excel, Auto Cad2d.

Ms office.

Construction sr. survey Corse completed on dt- 2010 from NCVT

Survey

SUMMERY OF WORK EXPERIENCE:

Company: Gannon Dunkerley & Co. Ltd.

Designation: Surveyor

Period : Nov’07 on wards.

Company: G.I.B c/o Larsen & Toubro Ltd.

Designation: Surveyor

Period : April’04 to Oct’07

Company: Peace Survey Group c/o Larsen & Toubro Ltd.

Designation: Surveyor

Period : Mar’03 to Mar’04

WORKING EXPERIENCE:

PHED WATER TRETMENT PLANT SITE.BALURGHAT, D-DINAJPUR, (W.B).

Survey at the WATER TREATMENT PLANTS of GANNON DUNKERLEY & CO. LTD. at Balurghat, Gangarampur&Tapan, Block W.B. from 20.01.16 to till date as a Surveyor & covered following areas of work:-

Lay out of Intake well, Inspection well,10 m depth Infiltration gallery, perforated HDPE pipe laying for infiltration gallery,perforated HDPE pipe Out side filter media filling, Intake well to River adage access bridge for approach. Access bridge pile point laying, pile cap center line, pair Center line etc .

Open foundation, for Clear Water Reservoir, pump house, presser filter, admin bldg,sub - station bldg, staff quarter, chlorination bldg, over head reservoir,intake bridge. Under grounder reservoir, etc. Drawing done excavation profile, River profile, pre level, post level, lay out plan of over head reservoir. Area layout plan of W.T.P .All type survey & civil drawing done by Auto cad & all lay out done by

: Total station “JOHANA 802N, SOKIA CX105”. All level done by Auto level. To be continue.

PHED WATERTRETMENT PLANT SITE.BALLY,HOWRAH, (W.B).

Survey at the WATER TREATMENT PLANTS of GANNON DUNKERLEY & CO. LTD. at Bally, Jagacha,Block Howrah, W.B. from 01.12.13 to19.01.16 as a Surveyor & covered following areas of work:-

Layout of pile point,pile cap, open foundation, for clear water reservoir, pump house, clariflocculator, filter house, admin bldg,sub - station bldg, staff quarter, chlorination bldg, over head reservoir,intake bridge, intake jetty, etc. Drawing done excavation profile, river profile, pre level, post level, lay out plan of over head reservoir. Area layout plan of Water treatment plant . All type survey & civil drawing done by Auto cad .

:Total station “JOHANA 802N, SOKIA CX105”) .All level done by Auto level.

:

ULTTRATECH CEMENT PLANT SITE.DANKUNI HOOGLI,(W.B)

Total structure and Test pile layout at Dankuni ulttratech cement plant of the GANNON DUNKERLEY & CO. LTD. From 01.03.13

to 30.11.13

WORK:

CLINKER SILO, FLYASH SILO, CEMENT SILO, MILL BUILDING, ELEC-SUBSTATION, WAGANTIPPLER, WAGENLODING PLATFROM. LAYOUT & TEST PILE,SURVEY DRAWING & CIVIL DRAWING DONE BY AUTO CAD.

: TOTAL SURVEY WORK (Total station “JOHANA 802N, SOKIA CX105”)

SONAR BANGLA CEMENT PLANT SITE. SAGARDAGHI,MURSHIDABAD,(W.B).

At the CEMENT PLANT SITE, SAGARDIGHI, MURSHIDABAD of the GANNON DUNKERLEY & CO. LTD. from 01.03.10 to 31.03.13 as a Surveyor & covered following areas of work:-

CLINKER SILO, FLYASH SILO, CEMENT SILO, MILL BUILDING, ELEC-SUBSTATION, WAGANTIPPLER, WAGENLODING PLATFROM. COMPLET PLANT.,SURVEY DRAWING & CIVIL DRAWING DONE BY AUTO CAD.PRE LEVEL,POST LEVBEL,BOLT FIXING,BOLT BOX FIXING,PRECONCRETE REPORT.POST CONCRETE REPORT.

: TOTAL SURVEY WORK (Total station “JOHANA 802N, SOKIA CX105”)

PHED WATERTRETMENT PLANT SITE.RAJHUNATHGANJ,MURSHIDABAD,(W.B).

At the WATER TREATMENT PLANT SITE of GANNON DUNKERLEY & CO. LTD. at Raghunathganj in the Murshidabad district, west Bengal from (26.01.2008 - on wards), and have been carrying the responsibilities of survey works at W.T.P, INTAKE, O.H.R . Site

WORK:

Lay out of pile point, pile cap, open foundation, for clariflocculator, C.W.R, pump house, sub-station, staff quarter, admin bldg. out house etc. Survey work done by

TOTAL SURVEY WORK (1” SOKIA)

Survey drawing & civil drawing done by auto cad.

V.I.S.A STEEL PLANT, JAJPUROAD, ORISA

At V.I.S.A STEEL PLANT site of Gannon Dunkerley & Co. Ltd at Jajpur, Orissa from (01-11-07 to 22-01-2008) as surveyor & covered following areas of

Job:-

W.T.P, GROUND HOPPER, COAL HOPPER, CLEANER 1 & 2, DE DUSTING SYSTEM, DAYBIN, CONVEYOR BELT. Survey drawing & civil drawing done by auto cad.

:

TOTAL SURVEY WORK (1” SOKIA)

Previously worked at BHUSAN STEEL PLANT, DHANKANAL,ORISA.

AT BHUSAN STEEL PLANT site of LARSON & TOUBRO LTD. at Angul Orissa from 01.03.07 to 28/11/07 as a Surveyor & covered following areas of work:-

: S.M.S (STEEL MELTING SHOP), CAUSTER, KONARK FUNACE, BREAK OUT STAND.

: TOTAL SURVEY WORK (Total station “SOKIA 610”)

Previously worked at T.I.S.C.O. JAMSHEDPUR, JHARKHAND .

AT T.I.S.C.O. Site of LARSON & TOUBRO LTD. at Jamshedpur, Jharkhand from 01.03.06 to 25.02.07 as a Surveyor & covered following areas of work:-

:H-BLAST FURNACE, CAST HOUISE, DUST CATCHER, DRY SLAG PIT, SLAG GRANULATION PLANT, INBA, DEDUSTING SYSTEM, SAND FOUNDATION, THICKENER SUBSTATION BLDNG, PIEZOMETRIC BLDNG, PUMP HOUSE, COOLING TOWER, STOCK HOUSE.

Work:

Lay out of pile point, pile cap, open foundation, column, bolt & bolt box fixing, for all structure

: TOTAL SURVEY WORK (1” SOKIA).survey report, pre & post concrete report done by auto cad.

Previously worked at NALCO Damanjodi, ORISA.

AT NALCO Damanjodi site of LARSON & TOUBRO LTD. at Koraput, Orissa from 20-04-04 to 26.02.06 as a Surveyor & covered following areas of work:-

Lay out of all open & combined building foundation, column . lift foundation,high drain raft & wall.

: . All structure level,Line maintain BY AUTO LEVEL & TOTAL SURVEY WORK (1”SOKIA).Drawing done excavation profile,pre level, lay out plan by auto cad. Survey report, pre& post concrete report done by auto cad.

: TOTAL SURVEY WORK (1”SOKIA) AUTO LEVEL

Previously worked at NALCO Angul, ORISA .

AT NALCO Angul site of LARSON & TOUBRO LTD. at Angul, Orissa from 03-03-03 to 15-04-04 as a Surveyor & covered following areas of work:-

Ash pond site Layer wise compacted earth filling, compacted ash filling,20mm chefs filling, rock tow wall. layer maintain by auto level. All level register maintain & sig by Clint . Lay out of pipe pedestal foundation& conveyor foundation.pre & post concrete report .survey report, survey profile drawing done by auto cad.

: ASH POND ( DAM), C.H.P & C.P.P,CONVEYOR BELT. Pipe pedestal.

: TOTAL SURVEY WORK (1”SOKIA,&AUTO LEVEL)

PERSONAL DETAILS:

Father Name : Sidhendu Kumar Sarkar

Father Occupation : Employee in Kolkata Corporation.

Date of Birth : 20-12-1978

Nationality : Indian

Sex : Male

Marital status : Married.

Permanent Address : Vill-Dhusaripara,P.O-Nimtita

Dist: Murshidabad.

Pin-742224, West Beng

EXPECTED GROSS SALARY : 5 Lacks

DECLEARATION:

I do hereby declare that above information’s are true to best of my knowledge.

Date:01.09.2019 Place:Balurghat Shib Sankar Sarkar



Contact this candidate