ENRIQUE A. HOSEÑA
Present Address: Tambo,Lipa City,Batangas,Philippines
Philippines Mobile No.: +639********* / +639*********
e-mail address: adkjn0@r.postjobfree.com
adkjn0@r.postjobfree.com
OBJECTIVES
Seeking for career development
SUMMARY OF QUALIFICATIONS
Experience Document Controller in the Oil & Gas industry.
Knowledgeable of document management, transfer, preservation and maintenance
Ability to receive, track, and monitor documents using standard document management
procedure.
Extensive knowledge of document control database systems
Possess excellent leadership for managing work and supervising a team of multi-cultural
manpower.
Electrical & Instrumentation Site construction work in petrochemical plant.
Practice Safety Standard procedures in lessening the hazard in workplaces applying the
OSHA and NEBOSH as per project requirement.
Prepares business correspondence and report presentation.
Proficient in using computer software.
SKILLS
Computer Sofware Proficient and Hardware Troubleshooting (Coreworx, Lutos Notes, AUTOCAD 2007, Microsoft Office, Windows OS installation and configuration, Adobe Acrobat, Adobe PhotoShop, Local Area Network, Documentum-Electronic Document Management System)
Document Controlling and Coordination
Project Management and Subcontractor Coordination
Practical Leadership
Property Valuation and Appraisal/Credit Investigation
PROFESSIONAL EXPERIENCES
Designation: Document Controller
Duration: April 25, 2018 – July 2, 2020
Company: FLUOR-DAEWOO-HYUNDAI HEAVY INDUSTRIES – Field Engineering
Department
Country: State of Kuwait
PMC: AMEC FOSTERWHEELER
Project Name: Al Zour New Refinery Project
Conduct squad check or thorough review of standard document requirements prior to processing
Processing of Inbound transmittal send to FDH assigned Reviewer and Approver and Outbound transmittal going to PMC-AMEC Foster Wheeler and sending back to subcontractor originator through Coreworx
Squad check/review and processing of Engineering Request For Information (ERFI) sent to FDH assigned Reviewer and Approver
Submission of Vendor Provisional Turnover Documents to PMC
Monitor Inbound document submission through Lutos Notes
Achievement:
Learn the processing of document by the use of Coreworx and e-mail monitoring through Lutos Notes
Understand the document management system of Fluor and AMEC Foster Wheeler and the project management
Designation: Document Controller
Duration: April 24, 2016 – April 24, 2018
Company: NASER M. AL-BADDAH & PARTNER GEN. TRDG. CONT. CO.
Country: State of Kuwait
Contractor: PETROFAC INTERNATIONAL
Project Name: Lower Fars Heavy Oil Development (LFHOD)
Implement document management system for preservation of drawings and documents both hardcopy and softcopy for easily retrieval.
Prepare and raise RFI and monitor the status.
Assisting the QC Engineer in preparation of Quality Control Procedure, Inspection Test Plan, Approval of Material.
Monitor the incoming and outgoing flow of documents, monitor the control the issuance of drawings in a restricted access.
Coordinate with the PETROFAC Document Controller for the approval of documents and drawings.
Prepare correspondence submitted to contractor PETROFAC.
Routing the information to all department head about the status of submitted and received documents by e-mail and hardcopy routing.
Provide all the necessary information required by Project Manager, Construction Manager, Site Manager, QC Manager, and Project Control Manager.
Prepare Minutes of Meeting for inter-office and subcontract meeting.
Disseminate works to other Document Controller and monitor the daily activity of the Document Controller team.
Achievement:
Implement the standard document procedure implemented by main contractor
Maintain the restricted monitoring of document work flow.
Designation: Document Controller (Technical)
Duration: January 20, 2014 – April 21, 2015
Company: MINISTRY OF DEFENCE ENGINEERING SERVICES -Project Directorate,
Consultant Section
Country: Muscat, Oman
Project Name: Adam Airbase
Receive and review the completeness of all tender documents and transmitted to Tender Committee for evaluation.
Maintain Document and Drawing Registry logbook.
Maintain filling of technical documents, drawings, correspondences, and material approval request.
Provide assistance for the information and documents required by Project Engineer and Project Director.
Manage the distribution and issuance of approved documents and drawings to the Consultant and main Contractor.
Prepare business correspondence to the Consultant or Contractor.
Implement document management procedure for tracking and retrieving drawings and documents.
Practice business approach in preparation of correspondence.
Inform the project engineers about the problem of project scope
Achievement:
Maintain the good flow of document from Consultant and Contractor.
Lessen the workflow of Project Engineer by identifying the areas of concern to be attended.
Enhance coordination talent and act as mediator with the Project Engineer and the Consultant.
Designation: Document Controller
Duration: October 25, 2011 – April 8, 2013
Company: SK ENGINEERING & CONSTRUCTION CO. -Field Information Department
Country: Jubail, Saudi Arabia
Project Name: Saudi ARAMCO Wasit Gas Project
Update and maintain project document database system, “PROWEB” and the log sheet of drawings and documents.
Monitoring properly the availability of documents in Wide Area Network Electronic Database system (PROWEB).
Maintain Document Control Procedure in line with ARAMCO Standard.
Coordinate with the ARAMCO project team for any pending approval of drawing and document.
Issuing and distributing controlled copies of drawings and documents to Site Offices.
Outline the status of documents and coordinate it with the management.
Provide dissemination of approved drawings and approved Procedures, Material Request Approval,
Work Method Statement and Vendor document at Site.
Maintain business relationship with ARAMCO project engineers.
Achievement:
Implement the standard of ARAMCO procedure for any document.
Lessen the workload of Document Manager by directly coordinating with the Project Engineer of ARAMCO about the approval requirement of document
Control the download of Vendor drawings from Head Office server in Korea to distribute in Site
Designation: Document Controller/Subcontractor Coordinator
Duration: July 2, 2009 – July 16, 2011
Company: TOYO - HYUNDAI CONSORTIUM -Project Control Department, Subcontract
Control Section
Country: Ras Laffan, Qatar,
Project Name: Shell Pearl GTL (Gas-To-Liquid)-LPU(Liquid-Processing-Unit) Project
Maintain filling of document of Subcontractors document log sheet.
Safekeeping of all confidential document of Subcontractors
Prepare Site Instruction, Site Memorandum, Letter of Intent, and Letter of Instruction to Subcontractors.
Assisting Cost Controller in preparing subcontractor monthly invoice.
Prepare and monitor the Back Charges of Subcontractors.
Give assistance to new Subcontractors in commencing the work.
Practice principles of Project Management, Planning/Scheduling and Controls in line with Subcontractors works.
Apply practical leadership principles in dealing Subcontractor problem.
Follow document confidentiality.
Attend promptly the inquiry by Subcontractors.
Maintain quality assurance and quality control principles, documents and procedures.
Relate QA/QC report related to Invoice preparation.
Assist Cost Control scope of work.
Achievement:
Controlling the document of submitted by Subcontractor.
Coordinate with the subcontractor in any related constraint with the progress.
Monitor and remind the progress status of subcontractor as per the schedule plan
Monitor Invoice status of the Subcontractor
Designation: Leadworker / Permit Receiver- E&I
Duration: February 3, 2008 – February 28, 2009
Company: TECHNIMONT - DAEWOO CONSORTIUM -ACM Department, Instrument
Section
PMC: CHEVRON
Country: Mesaieed, Qatar,
Project Name: Qatar Chemical Plant II-Ethylene Derivatives
Permit Receiver for tie-in construction project in Qatar Chemical Plant 1 & Plant 2.
Apply Work Permit to Chevron Safety Department
Evaluate the potential hazard in work location and formulate safety procedure to such hazard.
Conduct daily Tool Box Talk with the work crew about the Job Scope, Job Safety Analysis, and Job Method of Statement.
Supervise the safety condition of work crew in executing schedule work plan.
Build relationship with HSE management team.
Submit report to Site Engineer and Section Manager about daily work progress.
Supervise strictly the safety regulation of Site work in live petrochemical plant to avoid injury.
Implement Health and Safety Environment rules and standards among the workers.
Motivate team member to accomplished target in safe manner.
Ability to delegate work load in each team member.
Familiarize risk assessment and apply measures to avoid Loss Time Injury.
Practice practical leadership in decision making.
Deal effectively and attend promptly the challenging situations.
Gain technical knowledge of engineering principles of electrical works.
Achievement:
Supervising the Electrical and Instrumentation team
Implement and ensure the Safety precaution of the team member
Coordinate the client and HSE team about the hazard
Ensure that the Safety procedures and standard adhere during working time.
Designation: Computer Maintenance Technologist
Duration: May 2, 2002 – January 31, 2008
Company: QUEDAN & RURAL CREDIT GUARANTEE CORPORATION – IT Section
Country: Region IV, Philippines
Perform IT support and database maintenance.
Protect the server for possible virus intrusion and maintain the integrity of all data files.
Perform a monthly system audit and monthly physical inventory of all computer assets.
Control the installation of system software in all computers.
Assisting office queries about technical IT problems
Prepares and submits the required monthly report to Head Office.
Develop infrastructure and network engineering principles.
Implement IT policy to maximize unnecessary software.
Maintain the integrity of database server and database system.
Designation: Remedial Collection Associates
Duration: May 3, 1999- April 30, 2002
Company: LIPA BANK -Loan Department,
Country: Lipa City, Batangas, Philippines
Monitor the past loan account of bank and implement remedial action to reduce past due loan.
Issue warning notice to all delinquent borrower
Conduct reappraisal of property and recommend foreclosure of property for all delinquent account.
File foreclosure of property to Clerk of Court and process the consolidation of property to bank asset.
Designation: Administrative Assistant
Duration: May 15, 1996 – October 31, 1998
Company: ROYAL INTERARMS –Lipa Sales Office
Country: Batangas, Philippines
Prepare daily sales report and deposit cash in the depository bank.
Liaison officer to government offices.
Bookkeeping and administrative function.
EDUCATION
BS Computer Science, Baguio Colleges Foundation, Baguio City, March 1996
Certificate in Cyber Programming, System Technology Institute, Lipa City, April 2002
ELIGIBILITY
Civil Service Eligibility Professional, 80.16%, May 3, 2009, CSC-Region IV
TRAINING / SEMINAR
Nebosh International General Certificate
August 14, 2016 to August 25, 2016
Fahaheel, State of Kuwait
Conducted by: TUTIS Training & Consultancy
Total Communication Training Course
August 27 to September 24, 2011,
Virata Hall,UP Campus Diliman,Quezon City, Philippines
Conducted by: University of the Philippines Institute for Small Scale Industries
Institute of Leadership and Management Course
Courses Taken:
1) Introduction to HSSE Leadership, 2) Practical Leadership,
3) Supervision with Life Critical Activities,4) Introduction to Flawless Startup Initiative
5) Permit To Work/ 6) Productivity Through Planning &
Total Safety Task Instruction Organizing
7) Quality Control, 8) Train the Trainer,
9) Cultural Awareness, 10) Incident and Injury Free
July 9, 2010 to August 27, 2010
Shell Pearl Village Training Center, Shell Camp, Ras Laffan Industrial City, Qatar
Conducted by: Qatar International Safety Centre
Computer Based Safety Training Course - Life Critical Activities
Courses Taken:
1) Hazard Identification, 2) Lifting and Rigging Awareness,
3) Confined Space Entry, 4) Hand Safety Manual Handling,
5) Working At Height, 6) Non-Destructive Examination,
7) Hydrogen Sulphide Awareness, 8) Defensive Driving Refresher,
9) Emergency Response, 10) Managing Pressure & Leak Testing, 11) Mechanical Joint Integrity, 12) Authorized Gas Testing,
13) Electrical Safety Rules
October 2009 to September 4, 2010
Shell Pearl Village Training Center, Shell Camp, Ras Laffan Industrial City, Qatar
Conducted by: Qatar International Safety Centre
AutoCAD Course
March 9-27, 2009,
Calamba City, Laguna
Conducted by:Meralco Foundation Institute
Leadworker Training Course
June 1-10, 2008,
Qatar Chemical Plant, Mesaieed, Qatar
Conducted by: Chevron Health and Safety Environment Department
PERSONAL INFORMATION
Birthdate: 15 July 1975
Birth Place: Lipa City, Batangas
Status: Married
No of Children: Three (3)
Height: 5’4” (162.56 cm)
Weight: 80 kgs. (176.37 lbs)
Passport No.: P5380294B
Passport Expiry Date: 03 August 2030
Religion: Baptist