Post Job Free

Resume

Sign in

Manager Maintenance

Location:
Vasant Nagar, Karnataka, India
Posted:
February 28, 2021

Contact this candidate

Resume:

From

SHIVA KUMARA SWAMY, C.S

#F***,**rdCross*th Main,

1st Phase,

Bharathnagar,MagadiRoad,

Bangalore – 560 091

E-mail: adkjdw@r.postjobfree.com

adkjdw@r.postjobfree.com

Phone: 91-080-********

Mobile: +91-984*******

To

Dear Sir,

Subject: Application for the post of FACTORY MANAGER

I am Graduate, with a Diploma in Mechanical Engineering, and N.A.T at H.M.T. Machine Tools Division, Bangalore. I have commendable experience of 30 years in Processing of Granite Slabs, Tiles and Monuments, Granite Machine building and maintenance – Basic knowledge in Electrical. I am a strong believer that “Systems and Rigid Machine will produce consistent and quality product continuously”.

I am confident that my qualification, experience, exposure and knowledge will suit your Company’s requirement for the position applied for. My detailed CURRICULUM VITAE is enclosed for your kind perusal and valuable consideration.

I look forward to your reply.

Thanking you,

Yours faithfully,

Date:

Place: Bangalore (Shiva Kumara Swamy, C.S)

Achievements at PREMIUM GRANITES LTD.

Joined as Works Manager. Worked on the basis of MMM System.

1.Machinery major maintenance done; condition brought up to date. In that process all the machines are working with optimum capacity with good quality. Converted Wire saw into horizontal cutting. Put Hensel Plant into operational condition for Tiles. Major maintenance done in Gang-saw: Trolley wheels modified to withstand 120 tons.

2.Material Handling at quarry: Made a structure to handle 120 tons blocks. Made a Connecting beam to handle 120 ton at factory with two cranes for unloading the blocks.

3.Manpower : Though the company is having a Union, by implementing Contract Labour in the production area and implementing strict disciplinary action, created a congenial atmosphere inside the company which paved the way for higher productivity.

4.In the last one year, the company had a record dispatch of 120 containers which has been considered an all-time high.

5.All the areas have been updated by statistical recording and monitoring system.

6.Union dissolved by our strict effort and disciplinary

Actions V.R.S.given far all workmen.

Achievements at GLITTEK GRANITES LTD.

I was associated with a large Granite process Industry, an 100% E.O.U.as a Head of New Development, Maintenance and Utilities. I introduced Engineering System for maintenance and process operation. Several modifications were done to optimize production, which resulted in rejection coming down from 35% to 10 %.

Down time of machines was brought down by 22% to 2%. Statistics were analyzed and proper planning made for maintenance and production, resulting in total rectification of the entire plant. Bar chart was implemented to monitor work. This also resulted in reduction of man power.

The biggest success was introduction of T.P.M. The production team was trained to maintain the machines. This brought down machinery break downs to negligible levels.

With strong convincing capabilities, I believe and preach that quality and quantity with low cost only helps in the growth of the industry. This belief is drilled into the staff and the workmen daily. The results are heartening.

There are several other achievements which can be explained when called for technical discussion.

Following modifications done in Hensel Machines

1)Tile saw square rails were changed to round rails : 2 hrs / day BW reduced.

2)Polishing 2 mm plate removed and 20 mm plate provided, which reduced 180 Sft line breakage/day & Quality Standard maintained.

3)Lubrication system introduced.

4)Gang saw connecting, locking, main frame modified, holders made, resulting in the saving of 600 Hrs down time. Production 6 to 7 cutting / month.

5)All MS - guards converted to SS.

6)Blow Air implemented for drying.

7)Slurry settling system implemented.

8)T.P.M. introduced in the plant.

9)Production and analysis meeting conducted everyday.

10)Cost control committee formed.

11)

CURRICULUM VITAE

NAME : SHIVAKUMARASWAMY. C.S

FATHER’S NAME : Siddalingaiah

DATE OF BIRTH : 15.07.1960

ADDRESS : #F393,11rdCross7th Main,

1st Phase, Bharathnagar,MagadiRoad,

Bangalore – 560 091

CONTACT No. : 91-080-********

984-***-****

E-MAIL ID : E-mail: adkjdw@r.postjobfree.com

adkjdw@r.postjobfree.com

MARITAL STATUS : Married

PASSPORT NO. : J0793459 valid up 2020

QUALIFICATION : Diploma in Mechanical Engineering

B.A. from Bangalore University

TECHNICAL TRAINING : HMT (Machine Tool Division),

Bangalore for 3 years.

EXPERIENCE : 23 years in Machine building,

Maintenance and Granite processing.

LANGUAGES KNOWN : Kannada, English, Hindi, Tamil and

Telugu

MAJOR STRENGTH : Strong believer in “ Systemsd

Rigid Machine will produce consistent and quality product continuously”.

Date:

Place: Bangalore (Shivakumaraswamy. C.S)

ORGANISATION SERVED

NAME OF THE ORGANISATION

DESIGNATION

WORK HANDLED

DURATION

ACHIEVEMENTS

HMT Machine Tool Division, Bangalore

Apprentice Trainee

(Fitter)

Operation of all conventional machines and Assembly of machines

13.06.1979

to

12.06.1982

Made some substitute components for imported ones and learnt basics.

YANTHRA UDYOG,

Bangalore

Supervisor

Granite machine building from inception to operation.

01.07.1982

to

02.03.1985

Independently handled machine building and made modification.

S.V. Enterprises, Bangalore and Sri Shakti Granite Industries.

Proprietor and Partner

Manufactured Granite machines and SPMs Processor of granite slabs by kerosene

01.04.1985

to

31.08.1995

Made more than 100 machines belonging to Granite and Bakery by own design.

MUDDEERESWARA Group of Co’s, Bangalore

Production and Maintenance

in-charge

Handled five factories of imported and indigenous machines involved in granite slabs and monuments manufacturing for export.

01.10.1995

to

31.12.1996

Maintained Barsanti, Progeli, Hensile, Monali machines in good conditions.

ANKIT Granite Ltd., Hosur.

Head of Maintenance (Mechanical)

Maintaining “PEDRINI – ITALY’ tiles processing plant of 1,50,000 sq.mtr per annum (100% export oriented.)

06.01.1997

to

31.12.2000

By altering machines improved the production and machine life and also reduced maintenance cost.

GLITTEK Granites Ltd.,

Bangalore

Head of New Development, Maintenance & utility

Implemented Engineering System and modified Hensel Machines to update.

19.05.2001

to

08.12.2003

Implemented Engineering system and TPM to achieve optimum capacity.

PREMIUM Granites Ltd.,

Ranipet

Works Manager

Handled Production, Maintenance and Administration

05/01/2004

2006

Handled 120 Ton Block, Machinery upgraded, Manpower ratification.

GLITTEK Granites Ltd.,

Bangalore

Head of New Development, Maintenance & utility

. 3 nos Magi Gang saw andPolishing m/c installed and put in to operation

19.05.2006

to

31.12.2007

3 nos Magi Gang saw andPolishing m/c installed and put in to operation

Graniteindustrial corporation pvt. Ltd.,

Bangalore

Manager

3 nos Gaspari Gang saw andPolishing m/c installed and put in to operation

01.01.2008

to

30.04.2009

3 nos Gaspari Gang saw andPolishing m/c installed and put in to operation

Sireena Rocks pvt.ltd

Tirupti

Manager

4 nos Gaspari Gang saw andPolishing m/c installed and put in to operation

01.05.2009

to

2011

4nos Gaspari Gang saw andPolishing m/c installing is going

LIBERTY GRANITE

Hosur

Manager

7 nos Gang saw andPolishing m/c installed and put in to operation

2011

TO

2013

7 nos Gaspari Gang saw andPolishing m/c installing is going

On from foundation

Rashi granite

General Manager

4 nos Gaspari Gang saw andPolishing m/c installed and put in to operation

01.05.2009

to

2011

4nos Gaspari Gang saw andPolishing m/c installing is going

Manager

Comtroling 5000nos slabs and

15000m2 cutter slabs

2013

To

2014

Added WT P

Subham granite

hyderabad

Manager

Multy wire saw plant

2014

TO

Till datate

Running succesfuly



Contact this candidate