Cory James Lamb
Bethlehem, PA 18020
OBJECTIVE
To obtain a position, that will offer me a good opportunity to gain experience in my career. TECHNICAL SUMMARY
* *aintaining, Upgrading, Installing & Testing high voltage electrical systems. 2 Knowledge of HVAC & Plumbing systems
3 Power Distribution- 480/277V, 2400/4160V and 7600/13,200V 4 Transformers, Substations, Generating Stations, Switchgears, Feeders, Panelboards, Motor Controls, etc.
5 Scheduling & Estimating
6 NEC Code
7 Wiring
8 Ability to read and interpret schematics and blueprints. 9 Three phase power distribution
10 Tap existing 7620/13200 switches
11 Install and test new PLC panels for motor control, ( Siemens, Allen Bradley ) 12 Install new man holes & concrete encased duct banks ELECTRICAL SYSTEMS:
1 7600/13200 switch gear
2 7620/13200 switch gear and direct connected pad mount 1500 kva transformer 3 4000 ampere secondary switch gear and panel boards. 4 750 kva vault mount transformers
5 Building feeders
6 Secondary voltage switch gear and panels boards. 7 7620/13200 underground feeders
8 Programmable Logic Controllers
COMPUTER SKILLS:
1 AutoCAD 2005
2 ConEst & McCormick Estimating Systems
3 MS Office
PROFESSIONAL EXPERIENCE
2012-2019 Lamb Electric
Estimating, laying out jobs, General maintenance
Commercial and industrial wiring and repairs
2008-2012 Keystone Cement Plant, Bath, PA Non-Union Superintendent Engineer, Maintenance Supervisor
1 Oversee plant electrical, and Construction Project 2 Engineering of electrical schematics and blueprints 3 Inspection of all electrical, plumbing, Construction 4 Commissioning of Finish Mill, Raw Mill, crusher, 3000feet of tube con, pre heat tower 5 Testing of all Transformers, circuit breakers, wire megging, metering of high-low voltage switchgeer,
6 Troubleshooting of plc, and vib sencers
7 Arc Flash program for plant
8 Punch list and complete work needed to be done by contractors 9 Safety Classes for new crew Members, ( MSHA )
10 Troubleshooting issues in Plant
11 All plant electrical feild work, hands on
1999-2008 Lamb Electrical Services, Bethlehem, PA
Electrical Engineer – Owner/Operator
1 Project management of Industrial and Commercial Electrical projects. 2 Estimating of commercial and Industrial jobs
3 Supervised all project electricians
4 Training New Crew
1996-1998 Service Master c/o Phoebe Home
Electrical Maintenance & Engineering Management
1 Life Safety, Fire Safety, JACO Code.
2 Scheduling & permitting.
3 Superintendent of 10
4 Day to Day job set up
EDUCATION
Bethlehem Vo-tech
4 year BS Electrical Engineer Tom Edson College
North Hampton Community College
Computer Aided Drafting (AutoCAD), Current
Related Education/Course Work:
1 Business Administration
2 N.C.C Industrial Electrical
3 ABC Electrical Course
4 Union Electrical Course
5 NFPA-70E Arc-flash Course
PROFESSIONAL LICENSURE:
Master Electrician in Lehigh Valley
AFFILIATIONS
I.B.E.W, IEC, NECA,
PROJECT LIST
2008- Keystone Cement, Bath, PA
$290 Million
Superintendent- Provide day to day scheduling. Review and supply electrical, plumbing, HVAC, 180 Men crew
1996-1998 Conectiv Power Plant, Bethlehem, PA
$200 Million
Inspector / Supervisor of 125 electricians. Provided electrical drawings and schematics to other electricians. Megged lines out to generators. Provided day to day scheduling for project completion. Ran the Maintenance& Engineering of in-house shop. 2000-2003 Agear Systems, Allentown, PA
$25 million
Supervised a design-build project with 45 electricians on site. Installed new switch gear with power panels to new boiler rooms within the building. Wiring in sub-boiler rooms. 4160 - 480/277-volt transformers.
Casilio Concrete, Bethlehem, PA
installed a new main service and concrete vault for power company’s main feeders for step down transformers, plants voltage 277v high leg. 4000ampere service