Summary : I am a self motivated, open minded team player with a passion to broaden my knowledge every day through communication and interaction with all personnel on project.

Education/Certifications : High School Diploma, NACE III (cert. #16379 exp. 2/28/2023), CWI (cert. #10100701 exp. 10/1/2022), TWIC (exp. 5/2021) OSHA 30

Employment History

Avery Technical Solutions

Represented: Northern Natural Gas Missouri Pipeline Bridge Refurbishment

Plattsmouth Nebraska

9/20 – 10/20

Senior Coating Inspector II- Work with contractor to supply permits and track progress while providing coverage for the task being performed.

Attend daily Tailgate meetings and write permits for the task being performed.

Coordinate site visits and communicate issues with all parties involved to ensure project stayed on budget and task were being performed per the job scope.

Communicate with NNG contact to address issues that could be seen coming up to ensure contractor had no undue downtime.

Maintained contact with Environmental Inspector to ensure all work was being performed within environmental guidelines.

Sandblasting and coating operations were continuously monitored to fully refurbish piers and anchor blocks for the pipeline bridge.

Conducted final walkthrough with NNG engineers after completing punch list items and cleanup.

Universal Pegasus International

Represented: ExxonMobil 6.5 mile 230 NSC 20” pipeline

3/20 – 8/20

Senior Coating Inspector- Plan, coordinate and assist inspection personnel and the contractor with issues in the field to keep progress moving forward and while providing coverage for the task being performed.

Attend daily meetings and direct inspectors where needed for coverage by communicating with contractor

Review and approval of reports on a daily basis once all work is captured.

Communicate with ExxonMobil contact to correct any issues or concerns with documentation or coverage.

Maintain records for turnover book to include spreadsheet and 3 ring binder with calibration paperwork for the project and ensure the calibrations stay current.

Visit worksites daily to ensure all activities being performed have adequate coverage from inspection personnel and assist where needed.

Witness CP installation as needed for project requirements.

Assisting Survey, HDD, Stringing, welding, x-ray, coating, bores, cleanup and restoration throughout project

Frontier Integrity Solutions

Represented: Magellan 94 Miles Sirius 20” pipeline

8/19 – 2/20

Welding Inspector/ Multi-craft inspector- Inspection primarily of welding but not limited to any phase of construction.

Weld inspection from pipe gang to tie-ins.

As Build preparation and turn over.

Witnessing excavation and backfill activities assisting Utility Inspectors.

Communicating with contractor daily for inspection priorities.

CP inspection as needed for project requirements.

Assisting Survey, HDD, Stringing, welding, x-ray, coating, drilling and pulling.

Balcones Field services

Represented: SEM Group 6.5 mile Moore Rd. 36” pipeline

6/19 – 8/19

Welding Inspector/ Multi-craft inspector- Inspection primarily of welding but not limited to any phase of construction.

Weld inspection from pipe gang to tie-ins.

Coating inspections as required.

Witnessing excavation and backfill activities

Communicating with contractor daily for inspection priorities.

CP inspection as needed for project requirements.

Assisting HDD Stringing, welding, x-ray, coating, drilling and pulling.

Universal Pegasus

Represented: Targa 86 miles Grand Prix South Branch Pipeline 30”

2/19 – 6/19

NACE III Inspector- Inspection of welding, blasting, coating, excavation, backfill and cleanup of 30” pipeline.

Coating inspection per NACE requirements.

Inspection of excavation and backfill per Targa requirements.

Open communication with contractor and Inspection for all aspects of the project.

Universal Pegasus

Represented: Targa 46 miles Grand Prix South Branch Pipeline 30”

8/18 – 2/19

NACE III/ CWI Inspector- Inspection of welding, blasting, coating, excavation, backfill and cleanup of 30” pipeline.

Weld inspection per API 1104 requirements. (Pipe gang, Firing line, Fabrication and Tie ins)

Coating inspection per NACE requirements.

Inspection of excavation and backfill per Targa requirements.

Open communication with contractor and Inspection for all aspects of the project.

3B Inspection

Represented: Whitewater Midstream 7 miles Aqua Blanca extension 36” and 17 miles ARGO Lateral 20” pipeline

4/18-8/18

NACE III/ CWI Inspector- Inspection of all aspects of installation, testing and commissioning of 36” pipeline.

Weld inspection per API 1104 requirements. (Pipe gang, Firing line, Fabrication and Tie ins)

Coating inspection per NACE requirements.

Inspection of padding and backfill per Whitewater requirements.

Open communication with contractor and Inspection for all aspects of the project.

3B Inspection

Represented: Whitewater Midstream 57 miles Aqua Blanca 36”

11/17-3/18

NACE III/ CWI Inspector- Inspection of all aspects of installation, testing and commissioning of 36” pipeline.

Weld inspection per API 1104 requirements.

Coating inspection per NACE requirements.

Inspection of padding and backfill per Whitewater requirements.

Open communication with contractor and Inspection for all aspects of the project.

Do inventory for leftover materials for upcoming projects for Whitewater.

Assist in cleaning and drying of line for turnover to operations for commissioning.

STS Consulting

Represented: Pioneer Natural Resources

9/17-9/17

NACE Auditor- Audit PNR specifications and contractors for compliance with Engineering Standards.

Meet Pioneer safety requirements for the project

Review and redline Engineering Standards to ensure utmost quality and limiting early failure of coatings

Audit contractors for compliance of standards

Report findings in final report to PNR contact

System One

Represented: TransCanada/ Columbia Gas Transmissions Leach Express 36” Pipeline Spread 2A

4/17 – 8/17

CWI Inspector- Inspection of welding operations from testing welders to Tie-ins on mainline.

Weld inspection satisfying PHMSA requirements

Perform weld inspection while being audited by PHMSA with success

Fill out and go over JSA’s with welders on crew daily

Keep track of footage and all mainline weld x-ray information daily to report to senior welding inspector through daily reports.

Check welding parameters daily for each welder on crew. Majority of time was spent on firing line with a range from 10-16 welders each day.

Ensure weld procedure requirements are met while work progresses.

Communicate with contractor and supervision any issues and concerns to maximize progress and effectiveness.

Meet daily with senior inspector and inspection crew to discuss job progress and any issues that are discovered.

Perform visual inspections on completed welds.

Coatings inspection

Applus Velosi

Represented: CCJV

10/16 – 3/17

Source Surveillance Inspector- Inspection and verification of structural steel fabrication and galvanizing process of structural steel for the Cameron LNG plant in Hackberry Louisiana at Qualico steel facility in Midlothian Texas.

Performed daily evaluation of materials, layout, fit up, dimensional, weld out and loading of materials using approved engineered drawings and procedures.

Performed inspection of the Galvanizing before shipping to site to ensure all requirements of ASTM A123 and client requirements were met.

Produce release forms for contractor once it is verified all requirements have been met.

Write weekly reports capturing the progress and challenges for the client.

TechCorr Management LLC.

Represented: Chevron Phillips

7/16-9/16

NACE III Inspector- Inspection of Painting process to ensure all Chevron Phillips requirements were met for the Cedar Bayou facility on Baytown Texas.

Attend daily safety meetings

Review all applicable procedures and job specifications to ensure all work meets job requirements

Communicate with contractor and client for complete transparency of job.

Walk out and built spreadsheet for capital projects and give man hour estimates for budgeting.

Perform failure analysis and give recommendations for repair of failures.

Work with engineering department to clarify issues and discuss recommendations for approval of repairs.

Manage non conformances and follow through with corrections.

Burrow Global Construction

Represented: Plains Pipeline

5/16 – 7/16

Commissioning Specialist- Wrote commissioning procedures for the Plains Terminal in St. Claire Michigan for railcar loading project.

Attend daily safety meetings.

Work with construction team on progress and scope changes.

Review contractor documentation to ensure all NDE and job requirements were met.

Created commissioning procedures for the startup of the new system.

Worked with engineering department to clarify issues for the construction team.

IRIS NDT

Represented: Chevron Phillips

3/16 – 5/16

T/A Inspector – Walk down piping systems to verify correct materials and tightness on systems during Turn around prior to startup of the unit.

Attend daily safety meetings.

Attend daily turnover meetings.

Walk down of piping systems for correct flow direction and material verification.

Check bolting materials and tightness of flanges.

Review all QC packages to ensure all documentation of inspection had been completed prior to final sign off and turnover to operations.

Assist in PSSR checks before startup of plant.

Burrow Global Construction

Represented: Shell/Motiva

1/16 – 2/16

T/A Inspector- Turn around inspector responsible for material verification and tightness checks for piping and equipment at Motiva Refinery in Port Arthur Texas.

Attend daily turnover and safety meetings

Walk down piping systems with contractor to verify correct flow direction of equipment, material verification and flange tightness.

Report Non Conformances to engineering and plant inspection personnel for recommended corrections.

Report all non conformances to program manager.

Work with Turnaround team on system priority in order to meet their schedules.

Burrow Global Engineering

Represented: Oil Tanking

6/15 – 11/15

Quality Control Auditor III – Oversee Quality of painting and welding of pipeline station tie-ins and erection of storage tanks for Shell Motiva tank farm facility to ensure all state, federal and site requirements were met in Port Neches Texas facility.

Manage progress and schedule compliance.

Monitor Quality of work to ensure specifications were met.

Communicate project overview to Oil Tanking for update on compliance.

Verify out of scope work and review invoices for approval on out of scope work.

Ensure safety of the personnel on the project.

Report to client on issues that need clarification and inform contractors of direction requirements.

Review and finalize job documentation meets requirement for turn-over package.

Petrochem Inspection Services

Represented: LyondellBasell

4/06 – 6/15

QA/QC Welding, coatings and liners – Work with plant inspection and engineering to ensure all regulations, code requirements and procedures were met for the repair and maintenance of equipment and piping in the Channelview Texas facility.

Keeping client, suppliers and vendors informed of job progress.

Audit vendors in their activities to ensure they meet or exceed specifications and report back to global projects team for follow up and approval to perform work.

Assist vendors in working out problems with materials, suppliers or specifications.

Prepare job scopes, and keep track of progress and budgeting on paint projects being performed.

Paint and Weld inspection, installation verification, documentation for piping vessels and tanks to include underground utilities as well.

Verify shop fabrication dimensions and orientation per iso’s.

Follow up with engineering on progress and development on each project to ensure jobs are to code and meet clients’ expectations.

Gather documentation on work orders that have been completed and note incomplete packages to maintenance for final punch list items to be completed.

Submit packages to document control on completed work.

Draw ISO’s and Using P&ID’s to track down equipment.

Maintaining company vehicle.

Mobley Industrial Services

Represented: LyondellBasell

9/05 – 4/06

Painting Supervisor – Blasting and painting of blocked sections of piping and equipment to meet or exceed requirements of LyondellBasell in Channelview Texas Facility.

Schedule and plan work according to other work in area and the weather

Maintain equipment

Communicate any problems that may occur to operations and upper supervision

Inspection of blast quality and coating applications to insure specifications of manufacturer are met

Taking Barometric conditions and recording on QC reports

Recording Daily activities on QC reports

Contacting Inspection department for hold points

M&M Pipeline Maintenance

Represented: Houston Pipeline Company

2/02 – 9/05

Maintenance Foreman – Performed maintenance activities and assist in location and repair of anomalies on pipeline systems and compressor stations in the Houston and Beaumont Texas areas.

Responsibilities: sandblasting, painting, cleaning right-of- ways, mowing right-of-ways, locate pipe, and maintaining company vehicles

Maintenance and Labor Crew Foreman primarily for AEP - Houston Pipe Line Company

Advanced level duties: pipeline patrol, responding to One- calls (location requests) and line crossings, river crossing inspections, pipe to soil readings (CP), Main line and Emergency Valve inspections and maintenance

Basic operation, maintenance, and troubleshooting of Caterpillar 3606 Compressors.

Computer Skills

SAP

Microsoft Word

Microsoft Excel

Microsoft Outlook

GENERAL SKILLS

Basic Computer skills

Veriforce 910

Inspection, Maintain, & operate valves

Veriforce - Pipeline Operator Qualifications in: 2005

Valve Operations

Apply approved coatings above and below ground

Locate line / install temporary making of buried pipeline

Damage prevention: Observation of excavating & backfilling

Patrolling pipeline & leakage survey without instrument

Radio detection Line Locator

Gas Sniffer

Global Positioning Systems

Operate Backhoe, Trackhoe

Operate Cherry Picker

NNG OQ qualified through 2023

FAMILIAR WITH THE FOLLOWING CODES

ASME Section VIII

ASME Section IX

API 510

API 570

API 650

API 653

B31.3

B31.1

API 1104

Various NACE standards

References

Jamie Bonner – Senior welding Inspector System One 318-***-****

Justin Payne – Project Manager for Oil Tanking

409-***-****

Gary Meyers – General Manager for Burrow Global Engineering

409-***-****

Dan Konerza – Inspection Supervisor for LyondellBasell

281-***-****