adkf1u@r.postjobfree.com 009**-********
Michael Ayaad Lawandy
Mob. +965-***-**-***
adkf1u@r.postjobfree.com
Objective: -
Seeking a challenging career with a progressive organization that provides an opportunity to capitalize on my skills and abilities. Educational Background: -
Bachelor of Civil Engineering.
Faculty of Engineering Assuit University, (June 2013) Grade: Good with 72.25%
Graduation Project: -
Design and analysis of the special concrete structures. The Special concrete structures are the structures that have special load combinations like schools, hospitals, Tanks, and Tall Buildings.
Grade: Very Good
Training courses:
AutoCAD course at Engineering Education Development Center (EEDC). Mar.2011
SAP course at Industrial Technology Transfer Unit (ITTU). Sep.2012
Project management session at American Chamber of Commerce. Apr.2012
PRIMAVERA P6 at Jelecom training Center. Oct.2015 Scholarships:
Education for employment foundation Egypt, Nov 2013 Jan 2014 Soft skills development (Business skills, communication, Business English, pronunciation)
CPE (Certified Professional Employee) course at Oxford Training College London. Feb.2010 Language skills:
English: Good (Write, read and Speak).
Computer Skills:
Very good in using (AutoCAD, SAP)
Have an ICDL certification.
Personal Data:
Date of birth: 22/12/1989
Marital status: Single
VISA: 18 Transferable
Driving license: available
adkf1u@r.postjobfree.com 009**-********
Work Experience: -
Ahmadiah General Trading and Contracting Company (Kuwait) from (April 2018) till (Present) AL ZOUR REFINERY PROJECT from (April 2018) till (March2020) Technical Office Engineer:
responsible for prepare shop drawings for site purposes and to be submitted by the consultant. sketch the site issues to be discussed by the construction team and shared with the consultant for approval. Provide coordinates to the surveyors also preparing the as built drawings. SHEIKH SALEM AL ALI AL SALEM AL SABAH CAMP (PREVIOUSLY KAZMA) from (March2020) till(Present)
MEP Coordinator:
Prepare Tie in drawings for each building to avoid clashes between different services outside the building. prepare sections for each inlet to the building to coordinate with building levels and land escape levels. Remove the clashes at plan and sections and submit them to the consultant for approval.
El Akkad for Engineering Works (Egypt) from (Sep. 2017) till (Jan. 2018) El Riyadh Secon Compound 5th settlement
Construction of 16 blocks with 4 different templates Site Engineer:
check and confirm that the site works is going according to the submitted drawings and project specifications. Update the store by the quantity of the required materials. Provide the work priority to subcontractors. follow the company supervisors to apply the work plan. El Salam General Construction (ECG) (Egypt) from (May 2015) till (Sep.2017) Palm Hills Khatami 230 Fed. Compound from (May2015) till (June2016) Maintenance and Construction of 120 villas with different templates. Marassi North Coast from (June 2016) till (Sep. 2017) Construction of 50 villas at Marassi Blanca new stage Site Engineer:
check and confirm that the site works is going according to the submitted drawings and project specifications. Update the store by the quantity of the required materials. Provide the work priority to subcontractors. follow the company supervisors to apply the work plan Comage Company(Egypt) from (March 2014) till (May 2015) SMG Company Store Restoration project, Alexandria from (March 2015) till (May 2015) Basement with mezzanine Restoration at 11 floors building without evacuating. EL THALATHENY Tunnel project, Ismailia City, Egypt from (March2014) till (Feb. 2015) Isolation and injection system design and built with the company warranty Site Engineer:
check and confirm that the site works is going according to the submitted drawings and project specifications. Update the store by the quantity of the required materials. Provide the work priority to subcontractors. follow the company supervisors to apply the work plan References Available Upon Request