Post Job Free

Resume

Sign in

Engineer Project

Location:
Basista, Pangasinan, Philippines
Salary:
USD 5000
Posted:
February 22, 2021

Contact this candidate

Resume:

Page * of *

PROFESSIONAL RESUME

Name : Edgar P. Cariňo

Date of Birth : February 01, 1963

Nationality : Filipino

Qualification/Trainings : B.S. in Civil Engineering BGAS/CSWIP Painting & Coating Inspector

Certificate No. 17324 – Level II

Primavera 6.0 Enterprises for Project

Management

Computer knowledge using windows XP prolog

manager, Excel, Words, On-Screen Take-Off

and AutoCad. 2D/3D Drafting and

Design/Modeling and Rendering BIM

Architectural Revit & Structural Revit and

Naviswork

S. ARAMCO Experience : 5 Years

Saudi Aramco Approved : References: UPIU Log No. 744 / 01 Saudi Aramco Approved : References: OPIU/QIG Log No. 21- 04 Saudi Aramco Approved : References: NAPIS No. 414/04 Summarized Professional Experience

Jul 18, 2017 to Jul 26, 2020; State of Qatar: Employed by B.L. Harbert International, LLC, An American Construction Company based in London Drive, Suite 400 Birmingham, Alabama 35211, USA as OFFICE ENGINEER in the construction of a Qatar Early Warning Radar Project in Qatar.

Experience as Office Engineer:

Prepare and issue shop drawings from layout of temporary offices and permanent project for all structures prior to start-up of construction of the project using CAD and Revit (BIM) Architecture. Provide SD interfacing with other discipline to ensure all issued drawings to field are coordinated and with approval from the Project Engineer. Prepare SD showing coordinates, grade elevations and finish elevations of structure. Compute and prepare grade level finish elevation shop drawings as reference for underground utilities for MEP.

Prepare and review gathered product data and other literature information of materials in accordance to specification requirements in submission of submittal to design of record approval.

Check any deviation, modification/changes shown in the design drawings periodically in which part of the area were revised. Inform project team of the changes made in the Page 2 of 8

drawings and prepare immediate solution by preparing an RFI for approval by the design department and wait for the response before issuing construction drawings to field.

Ensure all materials purchases are duly approved thru submittal process and duly signed by the design department. Start purchasing of materials to US at required date based on the project schedule requirements.

Prepare material take-off from Division 3 to 12 prior to buyout of materials in compliance with the approved products from DOR and Construction Project Engineer.

Raised reports on the received materials with damages delivered to jobsite. Buyer will be notified to replace the materials depending on the final judgement by the receiver.

Advised warehouse department if materials receives are properly mark-up to ensure it will identifiable prior to installation.

Attend EMPR Engineering and Construction meeting weekly to ensure movement materials in the purchasing department are ahead of the delivery schedule requirement at the jobsite.

Prepare As-Built drawings using AutoCad and BIM Rivet Architectural for review, approval and stamping from the design’s team prior to handing to end user (Owner). May 21, 2014 to Jan 30, 2017; Djibouti, North-East Africa: Employed by B.L. Harbert International, LLC, An American Construction Company based in London Drive, Suite 400 Birmingham, Alabama 35211, USA as OFFICE ENGINEER in the construction of a New U. S. Naval Facilities Project for Camp Lemmonier in the Heart of Africa (HOA). Experience as Office Engineer:

Prepare and issue shop drawings from layout of temporary offices and permanent project for all structures prior to start-up of construction of the project using CAD and Revit (BIM) Architecture. Provide SD showing coordinates, grade elevations and finish elevations of structure. Compute and prepare grade level finish elevation shop drawings as reference for underground utilities for MEP.

Prepare and review gathered product data and other literature information of materials in accordance to specification requirements in submission of submittal to design of record approval.

Check any deviation, modification/changes shown in the design drawings periodically in which part of the area were revised. Inform project team of the changes made in the drawings and prepare immediate solution by preparing an RFI for approval by the design department and wait for the response before issuing construction drawings to field.

Ensure all materials purchases are duly approved thru submittal process and duly signed by the design department. Start purchasing of materials to US at required date based on the project schedule requirements.

Raised reports on the received materials with damages delivered to jobsite. Buyer will be notified to replace the materials depending on the final judgement by the receiver.

Advised warehouse department if materials receives are properly mark-up to ensure it will identifiable prior to installation.

Attend EMPR Engineering and Construction meeting weekly to ensure movement materials in the purchasing department are ahead of the delivery schedule requirement at the jobsite.

Page 3 of 8

Oct 01, 2011 to Feb 19, 2013; Islamabad, Pakistan: Employed by B. L. Harbert International, LLC, An American Construction Company based in London Drive, Suite 400 Birmingham, Alabama 35211, USA as MATERIALS ENGINEER in the construction of a New U. S. Embassy NEC Project.

Experience as Materials Engineer:

Review and verify project drawings and specification in compliance with ACI, ASTM, UL and NFPA Standards as per project requirements.

Prepare and review gathered product data and other literature details of materials in accordance with specification requirements for submittal approval from designer’s choice.

Check any deviation, modification or changes shown in the design drawings periodically in which part of the drawings are modified and inform project engineer any unclear information gathered in the drawings and ask immediate solution before site instruction will be issued to field.

Review coordination drawings to be issued to field for Civil, Structural, Architectural and MEP based on the design drawings.

Monitor status of all materials submittals if duly signed and approved by the design representative before purchasing the materials prior to project usage.

Prepare quantity takeoff of approved materials for buyout to US at required date three (3) months earlier based on the project schedule requirements.

Raised reports of received materials if any damages found at jobsite and check if materials are properly mark-up and stored correctly to easily identify its area of usage.

Conduct on spot check of all incoming materials on-site for any damage on handling and delivery and initiate immediate action in order to make necessary changes of delivered damage materials, conduct in-house and site inspection of the installed products as per approved drawings to customer’s satisfaction.

Apr 27, 2009 to Feb 28, 2011; Dubai, U.A.E.: Employed by B. L. Harbert International, LLC, An American Construction Company based in London Drive, Suite 400 Birmingham, Alabama 35211, USA as Office Engineer in the construction of a New U. S. Embassy NEC Project.

Experience in Office Engineer:

Prepare and issue shop drawings from layout of temporary offices and permanent project for all structures prior to start-up of construction of the project using AutoCAD. Provide SD showing coordinates, grade elevations and finish elevations of structure. Compute and prepare grade level finish elevation shop drawings as reference for underground utilities for MEP.

Prepare and review gathered product data and other literature information of materials in accordance to specification requirements in submission of submittal to design of record approval.

Check any deviation, modification/changes shown in the design drawings periodically in which part of the area were revised. Inform project team of the changes made in the drawings and prepare immediate solution by preparing an RFI for approval by the design department and wait for the response before issuing construction drawings to field.

Ensure all materials purchases are duly approved thru submittal process and duly signed by the design department. Start purchasing of materials to US at required date based on the project schedule requirements.

Page 4 of 8

Raised reports on the received materials with damages delivered to jobsite. Buyer will be notified to replace the materials depending on the final judgement by the receiver.

Advised warehouse department if materials receives are properly mark-up to ensure it will identifiable prior to installation.

Attend EMPR Engineering and Construction meeting weekly to ensure movement materials in the purchasing department are ahead of the delivery schedule requirement at the jobsite.

Sep 22, 2007 to Nov 30, 2008; Brazzaville, Congo: Employed by B. L. Harbert International, LLC, An American Construction Company based in London Drive, Suite 400 Birmingham, Alabama 35211, USA as Field Engineer in the construction of a New U. S. Embassy NEC Project.

Experience in Field Engineer:

Check project drawings and specification in compliance with ACI, ASTM, UL and NFPA Standards as per project requirements.

Inform project engineer any unclear information gathered from the drawings and ask any solution for immediate implementation on the jobsite.

Check any deviation, modification/changes shown in the design drawings periodically in which part of the area were revised. Inform project team of the changes made in the drawings and prepare immediate solution by preparing an RFI for approval by the design department and wait for the response before issuing construction drawings to field.

Ensure all materials purchases are duly approved thru submittal process and duly signed by the design department. Start purchasing of materials to US at required date based on the project schedule requirements.

Raised reports on the received materials with damages delivered to jobsite. Buyer will be notified to replace the materials depending on the final judgement by the receiver.

Advised warehouse department if materials receives are properly mark-up to ensure it will identifiable prior to installation.

Attend EMPR Engineering and Construction meeting weekly to ensure movement materials

Jul 27, 2005 to May 18, 2007; Accra, Ghana: Employed by B. L. Harbert International, LLC, An American Construction Company based in London Drive, Suite 400 Birmingham, Alabama 35211, USA as Senior Office Engineer.

Experience in Senior Office Engineer:

Prepare and issue shop drawings from layout of temporary offices and permanent project for all structures prior to start-up of construction of the project using AutoCAD. Provide SD showing coordinates, grade elevations and finish elevations of structure. Compute and prepare grade level finish elevation shop drawings as reference for underground utilities for MEP.

Check project drawings and specification in compliance with ACI, ASTM, UL and NFPA Standards as per project requirements.

Inform project engineer any unclear information gathered from the drawings and ask any solution for immediate implementation on the jobsite. Page 5 of 8

Check any deviation, modification or changes shown in the design drawings and must be identified in order to update drawings periodically in which part of the area has been rectified.

Responsible in keeping approved documents for package identifiable in such work. Monitor status of all submittal if duly signed by the design representative before purchasing the approved product for project usage.

Prepare and review gathered product date and other literature details of materials in accordance with contract specification requirements.

Download submittal to the ProjNet for Designer’s review and approval.

Raised query thru issuance of RFI to the Design Team of any unclear information from the drawings. All RFI responses shall be posted to the project drawings to ensure that as-built drawings happening in the field are regularly updated.

Prepare project material estimate for Civil/Architectural Finishes based on approved submittal, project plans and specification prior to purchasing of materials. Prepare material requisition prior to purchasing based on approved product. Monitor incoming materials in compliance with the request materials to ensure that the delivered materials are confirming with the requirements

Jul 27, 2000 to July 01, 2005; Saudi Arabia: Employed by Metals Services for Trading & Contracting Company, An Arabian Contracting Company based in Damman, Kingdom of Saudi Arabia involving Saudi Aramco Oil and Gas Projects as QA/QC Inspector. Experience in Inspection:

Working in compliance with SAES, SAMSS, API, international building codes and other aspect involve in the project.

Duties and responsibilities are to carry out high quality work according to industry and Aramco Engineering Standards.

Conduct daily inspection activities in accordance with the Project QA Manual &Quality Control Inspection Plan.

Ensure that inspection/test status are identifiable on components where applicable.

Prepares daily documentation and final acceptance documentation on products being utilized on the jobsite.

Maintain good relationship with the client’s representative to ensure all activities are quality inspected and monitored daily in accordance with inspection requirements.

Provision of Request for Inspection (RFI) to guarantee that all activities implemented on the project satisfy the requirements of the clients.

Develop awareness by setting, review and updating regular activities on project raw materials are at high quality standards in order to achieve the engineering purposes, product quality and client needs.

Address quality issues to relevant individual involves in such a way that activities be discuss to the high value to be sure to reduce the quality risks in executing to the field. Experience in Painting Inspection:

Witnessed preparation and painting procedures on metallic structures such as pipes, valves, ancillary piping and platforms during various phases of fabrication installation. Page 6 of 8

Inspection duties includes selection of painting system, surface preparation, priming, paint application, coating of field joints and testing. Conversant with relevant Saudi Aramco engineering standards for painting and coating. Proficient in paint material inspection, assessing substrate condition, in process inspection, report preparation and as built documentation.

Familiar with various destructive & non-destructive inspection methods and field safety requirement.

Check tools and machines regularly and calibrated to ensure its proper tools usage, careful handling and other measures to ensure quality machining execution, Ensure assembly is executed using quality-proven techniques materials, Test the products as needed to verify the products construction safety and functionality, Close monitoring of the painting process to achieve the final finish is to the quality level required, Authorize packing and delivery of finally checked products in coordination with project department Recent Projects:

Worked on gas well installation project for Saudi Aramco in Haradh. Areas of inspection include witnessing substrate preparation and in process inspection of civil procedures. Installation and inspection associated with unloading of pipes, backfilling, compaction, rebar works, concreting works, grouting, coating of concrete foundation, pipe berming and stabilization and erection of fence along wellhead, remote header and burn pit.

Witness, Inspected and Involve in the construction of 63 gas wells to Hawiyah-Haradh project (Aramco).

Worked on SSSP/ABV pipeline project located in the western province of Madinah, Saudi Arabia as Assistant Scheduler.

Worked on Aramco Oil and Gas Upstream Project (Hawiyah-Haradh – Eastern Province) and my Duties and Responsibilities for the above projects was mandated and carried out high quality inspection in accordance with Saudi Aramco Engineering Standards (SAES). Aug 30, 1999 to Feb 26, 2000; Philippines: Employed by Global Project, Incorporation on two-storey residential/commercial building as ProjectEngineer. Experience as Project Engineer: Responsible in checking project drawings and specification to ensure that is in full compliance with contract requirements. Execute layout of foundation based on foundation plan. Supervised excavation of pits to the required depth prior to the approved drawings, inform project management concerning non-conformity onsite and asked solution for immediate implementation on the job site. In-charge on scheduling of manpower and procurement of materials, sending quotations to various suppliers, estimate materials prices and co-ordinate with the main office prior to the quantity and prices. Responsible in collecting any deviations, modifications or changes incorporated on the job site. Supervise finishing works before hand over to the client. Mar 19, 1998 to Jun 26, 1999; State of Qatar: Employed by B.L.Harbert International, LLC on FY-97 military construction program as OfficeEngineer. Experience as Office Engineer:

Responsible in checking project drawings and specification to ensure that in full compliance with contract requirements.

Page 7 of 8

Inform project engineer of any unclear information gathered from the drawings and ask any solution for immediate implementation in the job site.

Responsible in collecting any deviation, modification or changes in the drawings and shall be marked in red or green ink to the contract drawing and considered as as-built drawings.

Update as-built condition daily showing all changes from the contract plans & responsible for filing approved submittal form 4025 according to their division for reference purposes.

Prepare O & M data for equipment and system as per manufacturer’s recommendation on electrical and mechanical as a full compliance with the contract requirements as well the system operation maintenance manual. Monitor weekly progress report and shall be forwarded to the project engineer in providing accurate figure sending to home base. Aug 19, 1996 to Aug 19, 1997; Libya: Employed by Dong-Ah Consortium on the Great Man Made river project as Civil Engineer.

Experience in Civil Engineer:

Responsible for the preparation of process control sheet (PCS) on the following activities such as blasting, trench excavation, pipe laying, appurtenant structures and pump station.

Coordinate with the QA/QC department any non-conformity or corrective action report issued by the owner (Brown and Roots).

Accept approved request for Civil, Mechanical, Electrical and Survey Checklist as attachment in the process of PCS.

Responsible in submitting PCS to the owner for approval and follow-up other documents as per contract requirements.

In-charge in keeping and securing all approved PCS subject to sunlight and fire, update/monitor unapproved and approved PCS.

Prepare weekly and monthly accomplishment reports in accordance with project requirements.

Received and distribute copies of contract plans to different department and prepare material take-off for concrete and tanking waterproofing activities. Jun 08, 1995 to Jun 08, 1996; Libya: Employed by Dong-Ah Consortium on the Great Man Made river project as QA/QC Engineer (Civil/Structural). Experience in QC Inspection:

Check earth moving activity, backfilling of structures and pipes, rebars and formworks installation and concreting works.

Supervise tanking (waterproofing) of structures prior to backfilling.

Prepare request for inspection (RFI) checklist for approval to the owner (BRNA) representative before concreting or backfilling activity taking place. Unapproved request shall be recorded and coordinated to the construction department for possible solution or make remedy, initiate immediate action to prevent occurrence of on conforming items.

Recommend or provide solutions through designated channel any non-conforming works to the project, verify the implementation of solutions, control, and future processing delivery or installation on non-conforming items until the deficiency or unsatisfactory condition has been corrected through the joint inspection of the owner (Brown & Roots) and general contractor (Dong-Ah). Discussed all pending and anticipated problems in the Page 8 of 8

field with owner and suggest improvement or changes about the construction plans. Attend all operational meetings as per contract requirements in the project. Sep 29, 1993 to Dec 1994; Philippines: Employed by Arcsin Builders Incorporation in the construction of La-Mesa Dam Project as Project Engineer. Experience in Project Engineer:

Responsible for scheduling of manpower/equipment and material procurement, supervise installation of spiral stair, trash rack, handrail and perimeters fence, supervise excavation of fence footing as per approved detailed drawing.

Prepare request for inspection checklist for approval from the owner (MSWW) inspector prior to pouring as well as the problems encountered in the field.

Coordinate with the owner inspector (QA/QC) in maintaining the quality before the implementation of works.

Conduct daily field inspection to check that construction activities are properly implemented and in strict compliance to the contract requirements, design and specifications and evaluate on the spot corrections and revisions of plans and notify superior any modification on the pan, attend all operational meetings, which require his presence as per contract requirements.

Jul 1987 to Nov 1992;Philippines: Employed by Northern Carriers Corporation as Arrastre Checker.

Experience in Arrastre Checker:

Responsible in checking the quantities of cargoes discharged for the ship. Coordinate to the ship captain regarding the acceptance of the finish products.

Issued receipt to the buyer on the quantity of big/tons being loaded on the truck. Check quantities of discharged finish products in order to tally the receivable material form the ship to the buyer.

Aug 1984 to Dec 1986; Philippines: Employed by Filipinas Construction Company as QC Civil Inspector. My commitment is to carry out high quality work in accordance to the Philippine Standards. It is my duty to satisfy the requirements of our clients by completing work in conformance with specified requirements, to fully understand the work processes and to continually work to eliminate wasted time, resources and costs. Thoroughly review and check project drawings, specification and documents and inform project management any unclear data gathered on the drawing and on site and initiates immediate solutions to avoid non-conformity of the project. Give instruction and procedures to the foreman and leadman to ensure that work for which they are responsible meets the required standards. Assists project surveyor in the subdivision of lots and roads locations as project design requirements. Attend weekly and monthly meeting with the client to incorporate changes, modification, deviation and the target fate of completion of the project. I hereby declare that all above information stated herewith are true and correct to the best of my knowledge and belief.

Edgar P. Carino

Email Ad : adkdz5@r.postjobfree.com

Contact Number : +63-906-***-****/ +63-995-***-****



Contact this candidate