Post Job Free
Sign in

Power Plant Engineer

Location:
Mumbai, Maharashtra, India
Posted:
March 30, 2021

Contact this candidate

Resume:

Ruchita Ramesh Surve

**/*, ***** ****, ***** (W), Mumbai - 400028 +91-908******* ***************@*****.*** DOB: 18-12-1995 https://www.linkedin.com/in/ruchita-surve/

Objective:

To help firms enhance their manufacturing processes and improve their supply chains using technical and managerial skills learnt from academics and from previous experience Education:

Course Institute Year of Passing Percentage/ CPI

B.Tech. (Production Engineering) Veermata Jijabai Technological Institute (VJTI), Mumbai 2017 8.64/10

XII (HSC Board, Maharashtra) Ramnivas Ruia Junior college, Mumbai 2013 84.00 % X (SSC Board, Maharashtra) IES’s M.J.P.K. School, Mumbai 2011 96.00 % Work Experience:

Company

Department

Duration

Details

Alfa Laval

India (Pvt.)

Ltd., Dapodi,

Pune

1. Sr Manufacturing

Planner (10

months);

2. Sr. Support,

Order Handling

(Supply chain) (3

months)

3. Intern, Operations

Development (9

months)

Aug 2017 to

May 2019

(1 year 10

months)

1. By improving balancing of the 22 machining and fabrication operations and by eliminating the wastes in these operations, reduced delivery time of the product by 50%.

2. Secured white belt certificate in Lean Six Sigma 3. Participated in Kaizen competition.

Godrej and

Boyce Mfg.

Ltd., Mumbai

Intern,Quality

Control Department,

Process Equipment

Division

June 2016

to

Dec 2016

(6 months)

1. Lean Manufacturing: Designed a nozzle welding fixture for a pressure vessel which reduced welding operation time by 30%. 2. Quality Control: Designed MS Excel tool for ensuring quality of industrial gauges as per ASME standards.

TATA

Power,

Trombay,

Mumbai

Intern, Mechanical

Maintenance

Department

Nov 2015 to

Dec 2015

(2 months)

1. Improved my understanding of a thermal power plant by studying energy consumption patterns and grid distribution networks in India.

Larsen and

Toubro Ltd.,

Navi

Mumbai

Intern, Electrical

Standard Product

division

May 2015 to

July 2015

(3 months)

1. Designed fixtures for spin riveting (using the principle of Pokayoke) and spot welding (using Problem Resolution Process) which reduced the rejections by 10%.

2. Ergonomics: Designed fixture for handling Air Circuit breaker

(weighing around 100 kg) to improve safety.

3. Improved inventory reliability in SAP ERP by identifying the root cause of discrepancy in physical and system inventory Softwares/Programming:Visual Basic, MS Excel Macros, MoveX Responsibilities held:

1. G.S., Prodology’16 - Led a team of 60 members to organize events like IVs, Case Study Competition, TPP etc. 2. Chief Editor, Nirmaan’16 (Technical Section) - In charge of publishing research papers for college magazine Languages known:English, Hindi, Marathi

Hobbies:Sketching

Reference:

Mr. Sachin Angchekar, General Manager, L&T Electrical and Automation, Mahape Email ID: ******.*********@******.***, Contact No.: +91-982*******



Contact this candidate