Mohammad Salauddin Mahmud Bhuiyan
C/O: Mohiuddin Ahamed Bhuiyan
A.R. No-156, Wireless colony, Poultry Farm Gate
Pahartali, Khulshi, Chittagong – 4202
Mobile: +880**********, Skype ID: bhuiyan_777
Email: *********@*****.***
Professional Experience :
Projects work: Design & Drawing review, Projects work monitoring, daily report, pending work preparation, prepare of BOQ, materials purchase report and can handle medium scale EPC project. Employer : “Sharaf LPG Ltd.”, IFCO Complex, 8th Floor, GEC Circle, Chittagong, Bangladesh. Position : Project Manager (Technological Entrepreneurs – Research in Technology, Production, sales & Marketing)
Duration : 01
st
February’ 2017 to Present date
Responsibilities : Responsible for Technological Projects Implementation programme: Full Project Execution: Planning, Technical, Financial & Risk Analysis, Costing and Design with Foreign Consultant, Full Civil work execution according to Foreign Consultant, Machinery Import, Local Fabrication, Installation, Testing, Commissioning & Commercial Production & introduce technological way to minimize costing in Logistic and Supply Chain Management. Project Name: 125,000 MT per Year LPG Terminal, LPG Storage, Bottling and Distribution Plant and Set up 5 MW solar Renewable energy (off grid).
Review the Drawing of Plant Layout, Machinery set up. Process, PID, PFD from foreign Supplier/Consultant.
Check of Estimation of the Tender offer, BOQ and coordination to Local Contractor/Sub- contractor.
Logistic support to the Contractor & Daily routine meeting with Engineer/ Subordinate as well as Implementation of various operations through control, coordination, direction, management and communication of the entire process.
Monitoring & Supervise 11/0.440 KV Sub Station Erection Works (X-er - 1500 KVA, HT, LT Panel, MCC panel).
Monitoring & Supervise the set up of Dolphin Jetty/Floating Jetty for LPG unloading from LPG vessel, 1650 MT x 3 Bullet type High pressure LPG Tank, LPG Compressor & Pump, LPG bottling Hall Room, etc.
Supervise the fabrication of steel frame for polycrystalline solar panel, Electrical wiring, cable arranging, set up ABB DAC converter, Substation etc.
Supervise the fabrication & installation work of Foam Producer Tank & water based Fire fighting spray system.
Supervise to recruit staff, Supervise to minimize hazardous in environment & society. Employer : “Lark Petroleum Company Ltd.”, South Sonaichari, Sitakund, Chittagong, Bangladesh Position : Project Manager
Duration : 1st January’2014 to 30
th
December’2016
Responsibilities : Responsible Project Implementation work of 130 MT Capacity Condensate Fractionation plant
Review the Drawing, check of Estimation of the Tender offer and coordination to Contractor/Sub-contractor.
CURRICULUM VITAE
Logistic support to the Contractor & Daily routine meeting with Engineer/ Subordinate as well as Implementation of various operations through control, coordination, direction, management and communication of the entire process.
Monitoring and Supervision of all types of Electro-mechanical work (Thermo-fluid Heater, Re- Boiler, Stripper Ballon, Fractional Column, Aero-condenser, Degasser, Heat exchanger).
Supervise the fabrication work of Feed Tank, Product storage Tank (SBP, MS, MTT, HSD) with Scale fixing, Floating Roof, Sample collection system, Breather, Drain line, Manhole, Painting etc.
Supervise the fabrication & installation work of Foam Producer Tank & water spray system for fire extinguisher & setup Cooling Tower.
Supervise the work of laying of cable system (HT & LT) as well as control cabling system for Instrumentation work and for Feed & Product delivery pump house and Street lighting of plant.
Supervise 11/0.4 KV Sub Station Erection Works (X-er – 1000 KVA, VCB, HT, LT, Changeover, PFI), Earthing (Mesh and boring) system and installation & Supervise the fabrication work of MCC Panel (Local & Remote).
Employer : ”United Power Generation & Distribution Company Ltd.” United center, House-NW (J),-6, Road-51, Gulshan-2, Dhaka 1212.
Position : Senior Project Engineer – Electrical
Duration : 1st January’2011 to 30
th
December’2013
Responsibilities : Supervision of Installation and Erection, commissioning and operational work of 56 MW power plant – Gas Engine
Logistic & Technical support to the Contractor/Sub-contractor and Daily routine meeting with Engineer/Subordinate.
Drawing Review, check of Estimation of the Tender offer, BOQ and coordination to Contractor/Sub-contractor.
Supervise the work of laying of cable system (LT and HT)
Earthing (Mesh and boring) system of substation and Engine Hall individually.
Monitoring & Supervise 11/230 KV Sub Station Erection Works (X-er - 70 MVA/80 MVA (tap changing), CB, CT, IVT, DS, LA)
Installation and supervision work of the control room (MV Panel, LV Panel, MCC panel, Generator to feeder to X-er control panel, NGR unit, Utilities panel)
Monitoring & Supervising work of 230 KV Transmission Tower (34 meter height and double circuit) to national grid
Employer
: Bakhrabad Gas Systems Limited (A Company of Petrobangla, under Energy Ministry, Bangladesh Government), Head Office, P.O. Box No. - 97, Dist. - Comilla, Bangladesh.
Position : Senior Maintenance Engineer-Electrical & Shift In-Charge. Duration : 9
th
July 2000 to 30
th
July 2006.
Responsibilities : As a Shift In-charge (Production Operator) at Control room - 02 yrs 6 months, & Maintenance Engineer (Electrical) - more than 3yrs As a Shift In-charge (at control room in Production Dept. since Nov.’2003 to July 2006):
Monitoring & maintaining the operational work of load dispatch for bulk (i.e. Thermal Power Plant, Fertilizer Company & Paper Mill Industry) & commercial consumers at Peak & off Peak period.
Making Report of Gas consumption (Peak & off Peak) in Daily/Monthly basis, data sheets and process optimization planning (shutdown and running the process line).
Process control of the existing production line & report on development.
Making monthly roster/shift schedule of the personnel (assistant operators of control room).
b. As a Maintenance Engineer
Maintenance of Sophisticated
(ESDV), EVV (Emergency Vent Valve) & Pressure Control Valve (PCV)) & Inlet Separator, Outlet Separator, Condensate Storage Tank, and ancillary devices are Air Compressor, Water Bath Heater/Boiler and its routine maintenance, and Flash Drum/Knockout drum of 350 Million SCFD Capacity Gas Processing/ Regulating station.
Maintenance of 750 KVA Electrical Sub
maintenance work of 200 KVA Diese
Installation/replacement of new Electro
Calibration of Metering Systems of different Production & Transmission companies (i.e. Gas Field, Chittagong, Cairn Energy PLC, Shell
sophisticated Electro-Pneumatic instruments like various type of Regulators, Transmitters (P, DP
& T), Controllers, Recorders and Flow Computer etc.
Monitoring the operational work of “On Stream Pigging Operati transmission pipe line (National Grid Line: Line Pressure=60 bar, Dia=24
To prepare spare parts list details in Electrical & Electromechanical equipments. Academic Exposure :
M. Sc Engineering (Electric
Power Engineering)
:
Research Work :
B. Sc. Engineering (Electrical
& Electronic Eng.)
:
H.S.C :
S.S.C :
Language Proficiency :
Computer Background :
Professional Training :
:
Professional Involvement :
Personal Data :
Father’s Name :
Permanent Address :
Date of Birth :
Sincerely yours,
(Mohammad S. M. Bhuiyan)
Making monthly roster/shift schedule of the personnel (assistant operators of control room). As a Maintenance Engineer - Electrical (since July’2000 to October’2003): Maintenance of Sophisticated Electro-Pneumatic instruments (i.e. Emergency Shutdown Valve
(ESDV), EVV (Emergency Vent Valve) & Pressure Control Valve (PCV)) & Inlet Separator, Outlet Separator, Condensate Storage Tank, and ancillary devices are Air Compressor, Water r and its routine maintenance, and Flash Drum/Knockout drum of 350 Million SCFD Capacity Gas Processing/ Regulating station.
Maintenance of 750 KVA Electrical Sub-station & Electric Distribution Line of Plant and routine maintenance work of 200 KVA Diesel & 250 KVA Gas Generator. Installation/replacement of new Electro-mechanical instruments & preserves a logbook. Calibration of Metering Systems of different Production & Transmission companies (i.e. Gas Field, Chittagong, Cairn Energy PLC, Shell & Unocal Bangladesh Ltd.) and installation of Pneumatic instruments like various type of Regulators, Transmitters (P, DP
& T), Controllers, Recorders and Flow Computer etc. Monitoring the operational work of “On Stream Pigging Operation” of high pressure Gas transmission pipe line (National Grid Line: Line Pressure=60 bar, Dia=24 To prepare spare parts list details in Electrical & Electromechanical equipments. Chalmers Technical University, Gotenberg, Sweden as a SI Scholarship Holder (session Sept. 2006- June. 2008).
“Comparing and Evaluating Frequency Response characteristics of Conventional Power Plant with Wind Power Plant”,
Department, Chalmers Technical University, Gothenburg, Sweden Chittagong University of Engineering & Technology (former BIT, Chittagong, Bangladesh) in 1996 (Held in 1999) with First Class & secured 8th position in order of merit.
First division from Comilla Board. Comilla, Bangladesh in 1992. First division from Comilla Board, Comilla, Bangladesh in 1989. English (Fluent), Bengali (Native), Hindi (Good)
Windows Office Packages (MS-Word, Excel, Project, Power point), MATLAB, COMSOL Multi-physics.
1. Course on “Office Management with Computer Application from Bangladesh Institute of Management, Dhaka,
Period: 12 days, 02-13th January ’ 2005.
2. Safety Training on Gas Processing Plant from Bakhrabad Gas systems Ltd, Comilla, Bangladesh.Period:10th Jan.
Member: The Institution of Engineers, Dhaka, Bangladesh. Since: November’2001
Mr. Mohiuddin Ahamed Bhuiyan.
C/O - Shiddequre Rahman Bhuiyan, Vill.-Taligram, P.O. P.S.- Chauddagram, Comilla.
30th June 1974
Making monthly roster/shift schedule of the personnel (assistant operators of control room). Electrical (since July’2000 to October’2003):
Pneumatic instruments (i.e. Emergency Shutdown Valve
(ESDV), EVV (Emergency Vent Valve) & Pressure Control Valve (PCV)) & Inlet Separator, Outlet Separator, Condensate Storage Tank, and ancillary devices are Air Compressor, Water r and its routine maintenance, and Flash Drum/Knockout drum of 350 Million station & Electric Distribution Line of Plant and routine mechanical instruments & preserves a logbook.
Calibration of Metering Systems of different Production & Transmission companies (i.e. - Sangu
& Unocal Bangladesh Ltd.) and installation of
Pneumatic instruments like various type of Regulators, Transmitters (P, DP on” of high pressure Gas
, Length=170 km).
To prepare spare parts list details in Electrical & Electromechanical equipments. Chalmers Technical University, Gotenberg, Sweden as a SI June. 2008).
“Comparing and Evaluating Frequency Response characteristics of Conventional Power Plant with Wind Power Plant”, Electrical Department, Chalmers Technical University, Gothenburg, Sweden Chittagong University of Engineering & Technology (former BIT, Chittagong, Bangladesh) in 1996 (Held in 1999) with First Class & First division from Comilla Board. Comilla, Bangladesh in 1992. First division from Comilla Board, Comilla, Bangladesh in 1989.
(Good)
Word, Excel, Project, Power point),
Office Management with Computer Application”
from Bangladesh Institute of Management, Dhaka, Bangladesh. 2. Safety Training on Gas Processing Plant from Bakhrabad Gas systems Ltd, Comilla, Bangladesh.Period:10th Jan.-16th Jan.‘2001. Dhaka, Bangladesh.
Taligram, P.O.- Dhorkara