Post Job Free

Resume

Sign in

Mechanical Engineer Maintenance

Location:
Mumbai, Maharashtra, India
Salary:
NA
Posted:
March 26, 2021

Contact this candidate

Resume:

Bagwan Ibrahim Miyasaheb

House no.***B, Muslim Pachha peth,

Jail road, beside Shafi lock,

Maker, Solapur-413005 Maharashtra India

Email: adk7bj@r.postjobfree.com

Career & Personal Summary: -

To secure a responsible position with a progressive firm that will utilize my skill and experience to provide growth opportunities.

I have been in mechanical maintenance field since last 25 years mainly into deploying preventive, predictive and break down maintenance & plant erection. I have immense and up to date technical background and easily pliable to situations. I am very confident in my abilities to converse and deal with many situations. I have very strong ambition to achieve success in my career and also willing to work very hard to achieve my goals my motivation, energy good organization and inter personal skill always allowed me to work with minimum supervision. I am able to work under pressure to meet dead lines without compromising the quality of workship I hope my knowledge coupled with the experience in the administrative aspect and personality would make me a good candidate for position within your organization Organization Skill: -

• Ability to work in maintenance activity with dependencies resources and deadline.

• Demonstrative leadership of multidiscipline high performance work teams.

• Excellent written and communication skills with technical and non-technical use.

• Maintaining and expanding vendor relationship.

• Excellent track record of flexibility and ability to abaft in a raptly changing environment. Worked and trouble shut the following machine: -

1. Bruckener Bopp/Bopet Plants – 8.7 mtr., 8.2 mtr., 6.6 mtr and 4.2 mtr width. 2. Dornier Bopp Plants – 8.7- mtr width.

3. Andritz Bopp plants - 8.7 mtr. 4.2 mtr width.

4. GVE Vacuum matallizer- K 5000, 3.650 mtr, 2.850 mtr, 2.250 mtr,1.650 mtr Width. 5. Topmet Matallizer - 3.000 mtr, 2.850 mtr, 2.450 mtr Width. Primary slitters: -

1 Goebel monoslit 8.7 mtr, 8.2 mtr. 3.0 mtr Width. 2 J kamf 8.7 mtr, 8.2 mtr, 6.6 mtr. Width

3 Atlas (Valmet) 8.7 mtr, 8.2 mtr,6.6,4.2 mtr Width.

. Secondary Slitters: -

1 J kamf 3.0 mtr, 2.4 mtr, 1.65 mtr. Width

2 Atlas (Valmet) 3.65 mtr, 2.8 mtr, Width.

3 Titian SR 8, SR 7, SR 6

Utility:

1. Chillers 1 Yorks 650,450 Ton capacity

2 Trane 200, 125 Ton capacity

3 Carrier 1250 Ton,415 Ton, 280 Ton capacity

2. Boillers 1 Thermax 25 TPB, 15TPB, 10TPB, 10TPA

2 Wancen (Belgium) 1,50,000 K.Cal.

3 Inplan (Germany) 1,80,000 4,50,000 K.Cal.

3. Air compressor Atlas Copco, Inger solrand,kaiser Chicago Daily Work management

JOB PROFILE

Comprehensive project management, installation, commissioning of BOPP / plastic film producing plants. providing engineering maintenance, modification, developmental and processing solutions and Playing a pivotal role in planning and handling project and Maintenance. activities Spare Parts Planning

1. Spare parts planning through indenting & inventory control. 2. Reclamation of worm out parts by in house repairing. Preventive Maintenance

1. Preparation, implementations of preventive maintenance schedule for reducing frequency of M/C break down.

2. Making of checklist for preventive maintenance & implementation as per B/D trends. Cost controlling

1 Cost controlling by stand by spare by in house repairing. 2 Cost controlling by inventory of spare parts.

Erection /Instalation & Commisioning

INDEPENDENTLY HANDLE ERECTION INSTALATION & COMMISIONING OF ANDRITZ 8.7 METER BOPP FILM MANUFACTURING PROCESS MACHINERY & UTILITY EQUIPMENTS INCLUDE METALIZER PRIMARY SLITTER, SECONDARY SLITTERS AFTER COMMISSIONING INVOLVED IN MAINTENANCE ACTIVITY OF OVERHALL SAME EQUIPMENTS

PROJECT EXPERINCE

1. Erection and installation of Bopp film lines of 8.7 Meter Make Andritz 2. Erection and installation of 3 Metallizer Make General Vaccum 3. Erection and installation of 2 Primary Slitter Make Atlas 4. Erection and installation of 3 Secondary Slitter Make Atlas 5. Erection and installation of 2 recycling machine Make Artec 6. Erection and installation of 9 CAT generators

.

Work Experience:

20 Jun. 2018 to Present DY. MANAGER - MECHANICAL

SML FILMS LTD.

A 17/1 GIDC ICHHAPORE

SURAT, GUJRAT, INDIA

Previous Experience :-

01 August. 2017 to 01 June 2018 MECHANICAL ENGINEER Biaxial Films Packaging SpA.

Setif, Algeria

01 Jully. 2013 to 30 June 2017 SHIFT INCHARGE U & M Rowad Global Packaging Co. Ltd.

Second Industerial City

Dammam Saudi Arabia

30 Nov-2011 to Jun 2013 MECHANICAL ENGINEER

Chiripal Poly Films. Ltd.

Plot # 14 Vraj Intigrated Textile Park

,Bidaj Ta.& Dist Kheda Gujrat

26 Feb. 2009 up to 20 Nov-2011 MECHANICAL SUPERVISER Rowad Global Packaging Co. Ltd.

Second Industerial City

Dammam Saudi Arabia

14 May 2007 to 30 nov.2008 Supervisor Mechanical Maintenance Jindal poly film ltd.

Tal. Igatpuri, Dist. Nasik

Maharashtra. India

Nov, 29,1998 to May 2007 Sr. Technician

Taghleef industries film company

Jebel Ali Industrial Area

Dubai, UAE.

Dec.1991 to Dec.1998. Utility operator / Mechanic

Cosmo Films LTD

Waluj Aurangabad, Mah. India

August 1989 to August 1990 Ref. &Air conditioning mechanic Mafco Ltd. Nanded Mah. India

Seminar Attended:

1. Polycold operations and maintenance from Meghatech Engineering England. 2. Chillers operation and maintenance Training from York, & Carrier 3. Crane maintenance from Demag Germany and Bonfanti, Italy. 4. Air compressor from Kaiser Germany. .

5. Bailing system from Welger Germany.

6. Twin screw: Berstorff twin screw Assembly and dismantling training. Educational Qualification:

Master in Mechanical Engineering. from N I P T Institute Ahmadabad (with correspondence) Diploma in mechanical Engineering.

Personnel Details :

Date of Birth: 5th Feb.1968.

Place of Birth: Solapur.

Nationality: Indian.

Passport No.: S 8449652

Phone: 009***********

Languages known: English, Hindi, Marathi & Arabic. Date :

Place : Signature.



Contact this candidate