Post Job Free
Sign in

Engineering Engineer

Location:
Chennai, Tamil Nadu, India
Posted:
March 23, 2021

Contact this candidate

Resume:

S ANANDHAN

EmailId:********.**@*****.***

Contact: +91-843*******

701-***-****

Address:

20A&20B, Venkateswara Nagar,

S.V.T. Nagar,

Thirumullaivayal,

Chennai-600062.

PERSONAL

DETAILS

Name :S Anandhan

Father’sname:R.SivajiGanesan

DOB : 07-04-1993

Gender : Male

Marital status :Single

Languagesknown:

• Tamil(S/W/R/U)

• English(S/W/R/U)

Permanent Address:

786, Gokul Nagar,

Vengikkal,

Thiruvannamalai-606604.

Professional Achievements:

• Achieved backlog of

production quantities at

Rane Madras Ltd.

• Got best trainee

certificateforachieving more

production.

• Got a medal for following

5S activities in RSMIPL

Strength:

• Team work

• Management

• Wise decision maker

CAREER OBJECTIVE

To obtain a position in a high quality engineering environment where my resourceful experience and academic skills will add value to organizational operations in the field of production and provides me the opportunity to reach my full potential professionally with collaborative leadership, integrity and honesty.

EDUCATIONAL QUALIFICATION

MBA – Production and Operations management

Name ofthe institution : Alagappa University,Karaikudi. Year of study : 2019-2020(Pursuing by DDE)

B.E -Mechanical Engineering

Name of the Institution : DhanalakshmiSrinivasan college of Engineering &Technology, Chennai.

Year of passing :2011-2015

CGPA :7.01

HSC-State Board

Name oftheInstitution : Sethu Bhaskara Matriculation Higher Secondary school, Ambattur, Chennai-600053.

Year of passing : 2009-2011

Percentage : 85.25%

SSLC-State Board

Name of the Institution :Sishya Matriculation Higher Secondary School Thiruvannamalai-606604.

Year of passing :2009

Percentage :81.6%

PROFESSIONAL EXPERIENCE

Company : Sankar sealing systems Pvt ltd

Melayyanappakam, Chennai 92.

Designation : Engineer- Production

Period : Feb 2021 to Now

ROLEANDRESPONSIBILITY

• Plan and coordinate engineering process on daily basis to meet production target.

• Handling a shift in individually,

• Responsible for OEE improvements and displaying the overall shift report to management

• Action to control manual error and mistakes and improve TPM

• Plan for machine loadings according to availabile of materials.

• Manpower handling,allocation &efficiency improvement.

• Shop floor control, kaizen activities, 5S improvements ACHIEVEMENT

• Implementation of FIFO method.

Company:RisingStarMobilesIndiaPvtLtd,Sricity,Chithoor Designation:JuniorEngineer-Production

Period:Oct2018toFeb 2021.

ROLEANDRESPONSIBILITY

• Dailymonitoringforthesourceof4M, 5S,3C and safety measurements.

• Identifying the Bottleneck stages in production.

• Checking Standard documents which are base for production processes.

• Provide engineering support for production and maintenance activities to ensure maximum production.

• Investigate problems,analyze root cause and deliver solutions.

• Achieving daily production target as per PPC standards.

• Conducting daily review meeting with the team about output and yield achievement.

• Optimizing the inventory levels in the entire supply chain by ensuring proper information.

• Reduce the cosmetic failures and identify the occurrence in assembly.

• Monitoring Quality process in entire operation process. Company : NVH India Auto parts private limited

Designation : Graduate EngineerTrainee

Period : Dec-2017 to Sep-2018

ROLE ANDRESPONSIBILITY

• Develop process improvements to effectively utilize equipment and materials to maximize production.

• To neglect the Line stoppage with the help of Logistics for Hyundai Motor Limited

• Monitoring the daily inventory stock and to check the physical stock with its system stock.

• Handled the man power of 15 members to achieve the production target and to avoid the sequence error. Company : Rane Madras Limited

Designation : Graduate Apprentice Trainee

Period : Dec-2015 to Dec-2016

ROLE ANDRESPONSIBILITY

• To plan and achieve the monthly production target given by Sales & Marketing team.

• Preparation of “CAPA”, a preventive measure in order to decrease the process error.

• Using the mechanism of “poka-yoke” in the processthat helps to avoid the mistakes by equipment operator.

• To plan for the consecutive shift achievements in the production and optimizing the inventory levels in the entire supply chain by ensuring proper information flow and through production system.

• Achieving the monthly schedule according to customer’s need.

• Plan to produce the Spares and Replacement components to customers. S.ANANDHAN



Contact this candidate