.
.
SATYABAN PATRA
MEP Project Engineer
Delhi, DL, 110076
***************@*****.***
Over 15 years Experience in HVAC, Plumbing & Fire fighting Execution, MEP Engineering supervision, and Project management of Industrial, Commercial and Residential Buildings,. Experience in intense construction and contract management. Expertise in execution of MEP functions in large projects like 5 Star hotels, shopping malls, IT parks, corporate offices. High Rise Luxury Apartments, Hospitals, High rise complexes Projects.
Skills
:- Fire fighting, Plumbing, HVAC,& Electrical Execution, MEP, Planning, Monitoring, Preparation of BOQ, Estimation, Preparation of work Order Summary:
• Responsible for Execution of Fire Fighting Plumbing and HVAC,Electrical, of All Type Of Commercial and Residential projects .
• Check Electrical, HVAC, Plumbing and Fire Fighting works concept reports and designs and drawings received from consultants.
• Check designs, drawings and cost estimates received from the consultants or Project Heads and see their conformity with government regulations and bye laws.
• Coordinate with MEP Services consultant, Architects, Vendors, Contractors, Project Execution Team, etc.
• Check detailed estimates for various services.
• Prepare work schedules and carrying out resources planning and resource balancing.
• Track work progress with respect to work schedule.
• Prepare rate analysis for HVAC, Plumbing & Fire Fighting and internal and external electrical works. • Discuss technical aspects of electrical system with consultants.
• Prepare electrical load details.
• Coordinate with Project heads/engineers deputed at site regarding services works.
• Site visit to check the quality and progress of the work if required.
• To check BOQ's and estimates for the internal and External Firefighting, Plumbing, Hvac & Electrical Works.
• Check deviation statement (cost & quantity) for the material as per agreement against the actual executed material.
.
.
Work History
2016-05 - Current MEP Project Engineer.
M.s/RIC PROJECTS PVT.LTD., DELHI, INDIA
Ø Project Involved Project Name: IITM Chennai. Madras Running Project Commercial Research Towers. 2B+G+25 Floors Completely Handover Package Of MEP & Distribution Water Supply& Student Facility Hostel Projects Package HVAC, Plumbing, Firefighting,
Ø Project Involved Project Name: DRDO Orissa Apj Abdul kalam island ITR MEP,Project.
Ø Job Responsibilities :
Ø Planning and execution of installation and commissioning activities of Plumbing,Fire fighting & Hvac MEP systems
Ø Follow ups with contractor agencies for effective and prompt works schedule
Ø Coordinating with various sections, consultants and HO for getting ready work front for MEP job
Ø Assisting in Reviewing of engineering drawings, schedules of Construction/commissioning etc.
Ø Monitor & ensure the execution of works per to the good engineering practices
Ø Handled 50 team • MEP services Projects :
Ø Check designs, drawings and cost estimates received from the consultants or Project Heads and see their conformity with government regulations and bye laws. Coordinate with MEP Services consultant, Architects, Vendors, Contractors, Project Execution Team, etc.
Ø Check detailed estimates for various services.
Ø Prepare work schedules and carrying out resources planning and resource balancing
Ø Track work progress with respect to work schedule. Ø Prepare rate analysis for HVAC, Plumbing & Fire Fighting and internal and external
Ø HVAC, Plumbing& Firefighting works. • Discuss technical aspects of HVAC, Plumbing& Firefighting system with consultants.
Ø Prepare HVAC, load details.
Ø Coordinate with Project heads/engineers deputed at site regarding services works.
Ø Site visit to check the quality and progress of the work if required. Ø To check BOQ's and estimates for the internal and external electrical works. Ø Check deviation statement (cost & quantity) for the material as per agreement against
Ø the actual executed material.
.
.
2010-11 - 2016-05 Site Engineer MEP
M/s. ASF Infrastructure Pvt. Ltd., INDIA, Gurgaon Ø Hvac,Plumbing & Fire fighting Execution, lead a team of MEP draughtsman and site supervisors in Quantity estimation,
Ø Planning and execution on the side for large MEP projects Closely monitoring the construction activities, effective team management, attending site meetings,
Ø Material supply, budgeted cost, confirmation to specifications, trouble shooting on electrical site problems
Ø Quality control and relationship management with consultants / customers Ø SYSTEMS HANDELED:
Ø Fire Fighting Systems: Installation Testing & Commissioning of: Ø Electrical & Diesel Pumps, Jockey Pumps, Hydrant Systems, Sprinkler System, Fire Hose Cabinet, Fire Department Connections, Landing Valves, Alarm Check Valves, Fire Hydrant FM 200 & CO2, etc.
Ø Water curtain and Drencher System's Installation Testing & Commissioning of: Ø Electrical & Diesel Pumps, Jockey Pumps, Motorized valve with C,O censer, water curtain Zone vise,water curtain nozzle, water curtain complete assembly
, etc.
Ø PLUMBING
Ø Water Supply System: Installation & Commissioning of: Ø Domestic Water Pumps, Central/Unit Electric Water Heaters, Hot Water Circulating Pumps, Water Hammer Arrestors, Back Flow Preventers, Pressure Reducing Valves, Drinking Fountains, Sanitary Fixtures, Automatic Mixing Valves, CPVC, UPVC, Polypropylene and Copper Pipes etc.
Ø Storm Water System: Installation & Commissioning of: Ø Submersible Water Pumps, External and Internal Storm Water Network, Manholes, Road Gullies, Roof Drain floor drain, rain water networking with all clean out plug, Floor Drain and RCC, PVC, Upvc, CI,Hub less pipes,saucer drain system's etc.
Ø Sewage Water System: Installation & Commissioning of: Ø Sewage Water Pumps, External and Internal Sewage system's Water Network, Sanitary Fixtures, Roof Air Vents, Sewage & Vent Pipes, etc. Ø HVAC System: Installation & Commissioning M.S pipe and Duct Powered Ventilators, Natural Ventilators. Stairs Pressurization Fans including Pressure Relief Flap,
.
.
Ø AREAS & STRENGTH ACROSS ASSIGNMENTS:
Ø Finalization of requirements and specifications in consultation with Collaborators / Promoters.
Ø Anchoring site activities to ensure completion of project within the time & cost parameters and effective resource utilization to maximize the output. Ø Participating in Project Review Meeting for providing progress, technical inputs to commissioning methodology.
Ø Liaison with consultants on determining technical & contractual matters. Ø Interfacing with the employer for project related issues. Ø Co-ordination among consultants, contractors & clients. Ø Supervising all activities including providing technical inputs for methodologies and co-ordination with site management activities. Ø Conducting regular check-ups to ensure that the systems are working as per the expectations & no obstructions caused by grime, leaks in pipes or ducts, or malfunctioning mechanisms.
Ø Supervision of team of workers for various types of job and resolving bottlenecks.
Ø Preparation and review of method statements and work specific Quality Control Plans.
Ø Ensuring that equipment/materials received are in accordance with the quality and quantity.
Ø Maintenance Purview: All utility equipment, Electro pneumatic & Hydraulic machines, Injection Moulding Machines, Chillers plant, Air Dryer, R. O. Plant, STP
& WTP.
2003-01 - 2010-11 Engineer MEP
M/s. ETA ASCON GROUP OF COMPNY DUBAI, DUBAI, UAE
Ø I have handover Jumera Bech 7WX Dubai UAE High Rise Commercial Tower Comprising Of 5 Basement G+S+60 Floors & Utility Building 2 Basement G+ 20 Floors
Ø I have handover DMRC Undergrad Metro Project.
(HVAC/PLUMBING/FIREFIGHTING)
Ø Job Responsibilities:
Ø Managing the project on a day-to-day basis to coordinate and implement effective building services in MEP works.
Ø Planning and monitoring the daily activities of MEP, lifts & elevators, temporary Plumbing & Fire fighting Electrical Services to meet the project dead line.
Ø Documentation of quality control operations including material submittal, drawing submittal, inspection reports and maintenance of records for validation and authentication.
.
.
Ø Inspecting MEP installations at site according to daily / weekly inspection and getting MEP clearance from the sub-contractors to proceed with the construction activities.
Ø Conducting weekly meeting with the sub-contractors for progress updating, drawing submissions and material delivery. Understanding the scope of the project. Constructing a network of work appropriate for the specific project. Identifying monitoring the progress of the project at different stages of its development.
Ø Ensuring that all the separate elements of the project fit together and are working towards a common aim.
Ø Preparation of project schedule and various reports for monitoring the progress of the project.
Ø Estimation, Installation, Execution, Testing & Commissioning. Ø Preparing Notification for Inspection & Testing Request. Ø Submit Activity and Productivity report on daily basis. Ø Ensures all materials are Approved as per material submittals. Ø Ensure that all materials are approved by consultant before Deploying to site for installation.
Ø Ensure that all Supervisors / foreman as well as workers receives all information's and procedures during pipe and equipment installation, as per Approved method Statements.
Ø Monitors Request for Information (RFI).
Ø Internal planning for Installation, Inspection, testing as per target schedules. Ø Conduct site meeting involving technicality installation for our supervisors, foreman, plumbers as well as helpers.
Ø Involved in Safety and ensuring that Works are done is in accordance with safety Rules and regulations.
Ø Ensures all Materials are approved as per material submittals. Ø Ensure that all materials are approved by Consultant before deploying to site for installation.
Ø Ensure that all supervisors / foreman as well as Workers receives all information's and procedures during pipe and
Ø equipment installation, as per approved method statements Ø Monitors Request for Information (RFI).
Ø Internal planning for installation, inspection, testing as per target schedules. Ø Conduct site Meeting involving technicality installation for our supervisors, foreman, plumbers as well as helpers.
Ø Possess team leadership skills with an aptitude for analysis and problem solving and adept at working in a computerized environment. Preparation of project schedule and various reports for monitoring the progress of the Project. Estimation, Installation, Execution, Testing & Commissioning. Preparing Notification for Inspection & Testing Request. Preparing Inspection & Testing request. Submit Activity and Productivity report on daily basis.
.
.
Education
Ø
Ø
Ø
Diploma in Mechanical Engineering from C.V Raman Polytechnic, Bhubaneswar, Odisha, Year 2002.
+2, Arts Council of Higher Secondary Education Orissa 1999-March. 10 th pass Board Of Secondary Education, Orissa 1997-April. IT. Skills: Having Command on Auto CAD Software, MS Office E-mail Etc. Personal Details
Date of Birth : 10th April 1982
Address : 200/1-SBI ATM, Street No. 1, Ali Vihar, Sarita Vihar, New Delhi
– 110076
Marital Status : Married
Passport Details : Valid
Driving License : Valid