Post Job Free
Sign in

Manager Piping

Location:
Houston, TX
Posted:
March 22, 2021

Contact this candidate

Resume:

Randall J. Perero

***** **** ********* **.; Houston Texas 77044

(adk3fq@r.postjobfree.com)

Cell: 281-***-****

Perero_Randall_2021_02_Master

Piping –

Summary

Mr. Perero has 46+ years of experience including refining, chemicals, olefins, offshore platforms, pulp and paper, and pipelines. Specific areas of experience include EB/SM, hydrogen purification, oxygen, nitrogen & argon production, methanol, cocker, catalyst cracking, alkylation, pipe stills, distillation, lubes, ammonia facilities, loading and storage facilities and continuous catalyst reforming. Offshore platforms include both drilling and production platforms. His pipeline experience includes crude oil pumping/cooling stations and natural gas compressor stations. Career has progressed through Draftsman, Designer, Lead Designer, Checker, Supervisor, Squad Leader, Discipline Coordinator (Principal Designer) and Section Manager. Project delivery experience includes FEED, Detail Design and Construction Management (EPC/EPCM). Current responsibilities include providing knowledgeable and competent technical support. Possess a strong sense of being a team player, remaining focused and completing assigned task without sacrificing quality. Safety is a part of my nature. Experience Highlights

2018 – Present Section Manager/Piping Lead, Worley, Houston, Texas 2017 – 2018 Sr. Designer/Checker, SNC Lavalin, Baytown, Texas 2006 – 2017 Design Discipline Coordinator, WorleyParsons, Houston, Texas 1992 – 2006 Piping Design Supervisor, GDS Engineers, Houston, Texas 1992 – 1992 Piping Designer, S&B Engineers and Constructors, Houston, Texas 1991 – 1992 Piping Design Checker, Stone & Webster, Houston, Texas 1988 – 1990 Piping Designer/Lead Designer, Jacobs Engineering, Houston, Texas 1987 – 1988 Mechanical Designer/Drafting Supervisor, Comsite, Laurel, Maryland 1980 – 1986 Contract Piping Designer, Self Employed Contractor 1979 – 1980 Piping Designer/Draftsman, Baker Marine, Houston, Texas 1974 – 1979 Piping Designer/Draftsman, Brown & Root, Houston, Texas Education

1992 Associates of Applied Science, Engineering Drafting Technology, San Jacinto Community College, 1992 (Taught ACAD at the college level on/off for 8 years at night – San Jacinto North Campus) Perero_Randall_2021_02_Master 2

Experience Details

2018 – Present Section Manager/Piping Lead, Worley, Houston, Texas Sr. Piping Designer/Checker, Worley, Houston Texas Conversion of an existing Hydrocracker to a service of Renewable Diesel. Project consisted of new pieces of equipment, modification of some existing equipment, changing service of other equipment assets and demo of yet other equipment items. Conversion challenge included the ability to revert to hydrocracking should client decide to do so. Field trips to site as well as laser scanning were a part of this effort. This project included some 420 tie-in locations for Piping. Section Manager/Piping Lead, Worley, Houston Texas EB/SM (Ethyl-Benzene Styrene-Monomer) FEED FEL2 for INEOS. New plant layout and design. Opti-Plant “Speed-FEED” effort.

Senior Piping Consultant, WorleyParsons, Houston, Texas Scope development and estimates for two separate units for Air Liquide. Port Arthur hydrogen purification (PSA) and Bay City Liquefied Manufactured Air (LMA).

USGC Methanol FEL1 – Project development of facilities and estimate for data point to move forward. Effort include but not limited to Plot space layout to include Haldor Topsoe Methanol production equipment (ISBL) and utilities (OSBL). Chemours specialty chemicals plant relocation to China facility. Early FEED (FEL 1) stage development. 2017 – 2018 Sr. Designer/Checker, SNC Lavalin, Baytown, Texas ExxonMobil – Refinery and Chemical Complex

Responsible for design of piping systems within various production units, such as cat crackers, alkylation, light ends, coker, and delayed coker. Responsibilities included checking of various design projects as well. Software utilized was AutoPlant along with the use of laser scanning (LFM).

2006 – 2016 Design Discipline Coordinator, WorleyParsons, Houston, Texas Piping Lead (Design and Engineering) overall - BASF OPUS Project, Freeport, Texas, USA. EPC (WorleyParsons with Partner Jacobs Construction). Grass Roots Methanol Plant (MeOH) (1650 KTA / 5000 MTPD), Methanol-to-Propylene Plant (MTP) (470 KTA) and OSBL. Largest Single Plant CAPEX Project in BASF’s History. WorleyParsons performing 85% of Engineering and Procurement in Shanghai Office. Project consist of utilizing three of the offices for WorleyParsons in China. Beijing, Shanghai and Chengdu are all slated for use. Overall Management and remaining 15% of EP in Houston. 40% of Construction will be Modules fabricated in yards near Shanghai. Jacobs to execute Site Construction. Project in FEED. TIC $3 billion. PDS /SPR along with Navisworks were used during FEED for this project. Methanol FEED/DETAIL Design project – Celanese. Piping Lead project. Project consisted of a new 3700MTPD methanol plant. This project had “Work-Share” with Beijing as a large part of the effort. Assignment included a year of working in Beijing China for over-sight of Piping effort. (EXPAT). . Activity included day to day work oversight. Weekly interaction with China Piping lead and sub-leaders. Constant model review and design checking against Master P&IDs. Weekly lunch and learn training sessions held with the China Piping group. Cultural exchanges and language barriers were a constant effort. Work processes between the way the Chinese and the West approached design projects were always under review. Project also included construction assistance at the project construction site. PDS & SPR were used for this project Methanol FEED/DETAIL Design project – Celanese. Piping Lead project. Project consisted of a new 3700MTPD methanol plant. This project had “Work-Share” with Beijing as a large part of the effort. Assignment included a year of working in Beijing China for over-sight of Piping effort. (EXPAT). . Activity included day to day work oversight. Weekly interaction with China Piping lead and sub-leaders. Constant model review and design Section Manager/Piping Lead, Worley, Houston TX

Bio-Diesel Fuel project development. Early FEL2 development for 150k BPD Renewable Diesel and Jet fuel project. Development of initial plot plan and working closely with Process in the development of Air Permitting required documents.

Perero_Randall_2021_02_Master 3

EB/SM (Ethyl-Benzene Styrene-Monomer) FEED FEL2 for INEOS. New plant layout and design. Opti-Plant “Speed-FEED” effort.

Sr. Piping Consultant, Worley, Houston, TX

Scope development and estimates for two separate units for Air Liquide. Port Arthur hydrogen purification (PSA) and Bay City Liquefied Manufactured Air (LMA).

USGC Methanol FEL1

Project development of facilities and estimate for data point to move forward. Effort include but not limited to Plot space layout to include Haldor Topsoe Methanol production equipment (ISBL) and supporting utilities (OSBL). Chemours specialty chemicals plant relocation to China facility. Early FEED (FEL 1) stage development. Sr. Designer/Checker, SNC Lavalin, Baytown, TX

ExxonMobil – Refinery and Chemical Complex. Responsible for design of piping systems within various production units, such as cat crackers, alkylation, light ends, coker, and delayed coker. Responsibilities included checking of various design projects as well. Software utilized was AutoPlant along with the use of laser scanning (LFM). Design Discipline Coordinator, WorleyParsons, Houston, TX Piping Lead (Design and Engineering) overall - BASF OPUS Project, Freeport, Texas, USA. EPC (WorleyParsons with Partner Jacobs Construction). Grass Roots Methanol Plant (MeOH) (1650 KTA / 5000 MTPD), Methanol-to-Propylene Plant (MTP) (470 KTA) and OSBL. Largest Single Plant CAPEX Project in BASF’s History. WorleyParsons performing 85% of Engineering and Procurement in Shanghai Office. Project consist of utilizing three of the offices for WorleyParsons in China. Beijing, Shanghai and Chengdu are all slated for use. Overall Management and remaining 15% of EP in Houston. 40% of Construction will be Modules fabricated in yards near Shanghai. Jacobs to execute Site Construction. Project in FEED. TIC $3 billion. PDS /SPR along with Navisworks were used during FEED for this project. Methanol FEED/DETAIL Design project – Celanese. Piping Lead project. Project consisted of a new 3700MTPD methanol plant. This project had “Work-Share” with Beijing as a large part of the effort. Assignment included a year of working in Beijing China for over-sight of Piping effort. (EXPAT). . Activity included day to day work oversight. Weekly interaction with China Piping lead and sub-leaders. Constant model review and design checking against Master P&IDs. Weekly lunch and learn training sessions held with the China Piping group. Cultural exchanges and language barriers were a constant effort. Work processes between the way the Chinese and the West approached design projects were always under review. Project also included construction assistance at the project construction site. PDS & SPR were used for this project. Offshore platform – British Petroleum Gulf of Mexico asset projects. Piping lead for major upgrade to an existing deep-water production platform. Design system is PDMS. Pipe-Line Group: Water treatment and injection plant. Design system is PDS. Participation on this project was as designer/checker. Offshore platform – SAKHALIN 1, Arkutun-Dagi Field Development. Client was ENL (ExxonMobil). Assigned to project to assist with “Clash Management”. Design system is PDMS. Transferred to Field site location (S. Korea) for fabrication. Assisted project management as (Project Engineer) - Deck Lead and participated as isometric coordinator and assisted with MDS (Multiple Discipline Supports) support development. (EXPAT) Korea effort included oversight of engineering/design team effort, to get information required and to answer question when needed. This effort was part of a team effort to keep the group on schedule. Construction assignment

Field presence and construction assistance. Executed client change orders and managed the MOC process. This assignment was for the Chevron CCR facility located in Pascagoula MS. Chevron

Piping design lead for a continuous catalyst reformer unit along with various associated plant upgrades. PDS was the design tool of choice for this project. Project effort included coordination with “Work Share” office in Beijing China. Perero_Randall_2021_02_Master 4

(EXPAT). This expat interface was mostly done from Houston. The longest China visit was for a period of eight weeks. This was done late in the project to provide Stress Analysis help and provide the piping group a clear path to project completion.

Enterprise Pipeline

Lead Checker responsible for the overall quality of a pipeline project. AutoCAD (CADWorx) was software of choice. 1992 – 2006 Piping Design Supervisor, GDS Engineers, Houston, Texas ExxonMobil – Refinery and Chemical Complex.

Responsible for design of piping systems within various production units, such as cat crackers, alkylation, light ends, coker, plastics plant and pumping of plastics and delayed coker. Project involved research and development of new technology and software. Served as Chairman of Idea Incentive Bonus Program. AutoCAD (Advantage – XOM specific) software was used.

1992 – 1992 Piping Designer, S&B Engineers and Constructors, Houston, Texas Solvay – Sol-Tex Plastics Plant. - Manual 2D drafting. 1991 – 1992 Piping Design Checker, Stone & Webster, Houston, TEXAS South Korea Furnace Project. PDS – Intergraph system used. Phillips – Olefins Project. Project involved conceptual design. Manual 2D drafting. 1988 – 1990 Piping Designer/Lead Designer, Jacobs Engineering, Houston, TEXAS Exxon – Plastics Plant, Mont Belvieu, TEXAS. Manual 2D drafting Exxon – Olefins Plant, Baytown, TEXAS. Project involved equipment layout, plastic model building, and isometric coordination. Manual 2D drafting.

1987 – 1988 Mechanical Designer/Drafting Supervisor, Comsite, Laurel, MD Served as Architectural Specialist for clean rooms, data centers, and intensive care units. Specifically, involved with mechanical rooms/H VAC equipment layout, power/electrical, and architectural coordination. Manual 2D drafting 1980 – 1986 Contract Piping Designer, Self Employed Contractor Virginia Power & Light, Richmond, VA. Contracted through Atlantic Technical Services. Reynolds Aluminum, Houston, TEXAS. Contracted through Tech Aide.

S & B Constructors, Houston, TEXAS.

Celanese, Pasadena, TEXAS. Contracted through E.T.C. Inc. Wilson Engineering, Clear Lake, TEXAS

Vemar Inc, Channelview, TEXAS. Contracted through Kotsios & Assoc. Procon Inc., Houston, TEXAS. Contracted through Kotsios & Assoc.

Fluor Ocean Services, Houston, TEXAS. Contracted through Kotsios & Assoc. Continental Engineers & Constructors. Gulf Interstate/Internorth/Exxon Refining, Houston, TEXAS. Contracted through Avary Energy Corp. 1979 – 1980 Piping Designer/Draftsman, Baker Marine, Houston, TEXAS Worked on jack-up drilling rigs

1974 – 1979 Piping Designer/Draftsman, Brown & Root, Houston, TEXAS Worked on petrochemical, pulp and paper, and offshore platform projects. Petrochemical Project – San Francisco, CA. Petrochemical Project – Dead Horse Alaska (North Slope). Abu Dhabi (Persian Gulf), United Arab Emirates. (EXPAT). Perero_Randall_2021_02_Master 5

Specific Technical Expertise/Specialist Courses

OptiPlant 3D Modelling (Worley 2018 – 2019)

Integraph S3D (2016) Training – Certification

PDS

PDMS

MicroStation

SPR

Navisworx

FlexCAD

AutoCAD 2017

MS Office

References

Brett Mash – Piping Lead

Jack Ariel – Sr. Project Manager / Director

Peter Stevens – Process Lead

Ed Goforth – Sr. Project Manager / Director

Jason Elledge – Project Delivery Manager



Contact this candidate