Post Job Free
Sign in

Engineer Engineering

Location:
Coimbatore, Tamil Nadu, India
Salary:
50000
Posted:
March 19, 2021

Contact this candidate

Resume:

*

RESUME

Name : P.S.Manikumar

Mobile : +91-952******* Email: ***********@*****.***

Seeking Assignments in Turn Around / Projects / Maintenance with an Organization of high repute in Oil & Gas / Power / Petro chemical Industry.

PROFILE SNAP SHOT

A performance – Driven Professional with 10+ Years Experience in Turn Around / Projects / Preventive Maintenance.

EMPLOYMENT DETAILS

Name of Company : MUN SIONG ENGINEERING LIMITED, Singapore Duration : April 18 to Jan 21

Position/s Held : TA Coordinator / Project Engineer / Maintenance Planner. Client & Owner : Shell Eastern Petroleum Limited (SEPL), Bukom Island Singapore.

: Exxon Mobil, Jurong Island, Singapore.

Jun 2020 to Still : SAR2 Maintenance, Exxon Mobil - Jurong Island. Dec 2019 to May 2020 : PU2 HV5 Turn Around, SEPL - Bukom Island. Sep 2019 to Nov 2019 : PU5 ECC Turn Around, SEPL – Bukom Island. April 2019 to Aug 2019 : PU2 LOC Pistop, SEPL – Bukom Island. Dec 2018 to May 2019 : SAR1 Turn Around, Exxon Mobil – Jurong Island. April 2018 to Nov 2018 : PU2 CD3 Turn Around, SEPL – Bukom Island. ROLES & RESPONISBILITES:

Worked as a TA / Project Co coordinator Handling Equipment like Heat Exchanger / Vessel / Column / Rotating Equipments / RV / CV / Valve and Piping’s.

Preparation of Activities breakdown and Resource Loading & Man Hours input into micro Planning.

Updating to P6 Scheduler for TA Schedule Preparation.

Monitoring of costs and man-hours allocation of projects at regular intervals to prevent project budget overruns

Generation of reports like Cash flows, Cost overview, Cost overruns, Earned value, Project overview, workforce Histogram for management’s review.

Preparation of PTW Documents such as MS, RA (JOHAN).

Preparation of detail erection schedule and supervision.

Calculating Bill of Materials for Shut down / Turn Around / Projects

Supporting Tendering for Manpower loading for new projects

Conducting weekly Client meetings and internal meeting for progress 2

Calculating resources, materials, costing and man-hours for Main scope, Variation orders and new projects

Coordination with Clients and Engineering department and raising Site Technical queries

Preparation of Progress chart actual vs. Plan during Execution.

Preparation of Special tools and Tackles.

Follow up ITP preparation to QC department for Turn Around / Projects.

Follow up permit Preparation for Turnaround / Projects.

Coordination with client material flow to fabrication shop.

Coordinating up with QC department for Material Inspection, NDT Results,

Coordination workshop fabrication, spool release with QC department.

Coordination with painting contractor.

Preparation for crane planning with lifting supervisor for Turnaround / Projects.

Attending Toolbox meeting every day and highlighting previous day safety and Quality related Positive and negative observation.

Attending Daily progress meeting with Client for progress update on Preventive Maintenance jobs.

Execution of the commissioning activities (Leak test, Purge & dry-out, mechanical running test).

Generate and validate mechanical check sheet and functional test sheets.

Rectify and Update the punch lists.

Verifying contractors claims with BQ and contract.

Managed a group to rule out test packs, EQCC packs, Total Flange Assurance (TFA) specification, Quality inspection and testing plan.

Actively involved in logistic material movement site in and out. EMLOYEMENT DETAILS:

Name of Company : HIAP SENG ENGINEERING LIMITED, Singapore Duration : September 2013 to March 2018

Position/s Held : Maintenance Planner / TA Engineer Client & Owner : Shell Eastern Petroleum Limited (SEPL) March 2017 to Oct 2017 : PU3 HDS4 Turn Around, SEPL – Bukom Island. Sep 2013 to Feb 2017 : PU1, PU2, PU6 Maintenance, SEPL – Bukom Island. ROLES & RESPONISBILITES:

Allocating recourses based on Hard week and soft week schedules

Daily and weekly Planning of jobs.

Attending Daily progress meeting with Client for progress update on Planned jobs

Internal booking of resources like Cranes, Lorry crane, Manpower and materials based on planned jobs

3

Preparing Bill of Materials for Piping jobs and sending requisition to client for ordering of materials

Preparation of Permits for Hot work and Cold work jobs

Coordinating with client for Preventive, Corrective Maintenance jobs and Schedule breaker jobs

Coordinating with Client for planning Maintenance jobs on Pumps, Compressors, Fin Fan, Exchangers, Vessels, Columns and Piping.

Getting Approved Job packs from Operation for planned jobs

Attending weekly resource meeting with Client to discuss about Manpower and Machinery resources.

Conducting Meeting with Sub contractor for follow up on work order and PO number for completed jobs

Supervising the planned jobs at Site for timely completion

Field execution of equipments during HDS4 TA, SRU2 Shut down

Monthly checking of Tools Box, Lifting gears, other tools and tackles with Safety Coordinator

Coordinating up with QC department for ITPs, Material Inspection, NDT Results, EQCCs for finished jobs

Submission of Reports and documents to Client like Alignment reports, Lifting plan, Pressure test waiver form.

Preparing Invoice, Timesheet for completed jobs

Tracking the invoice for the completed jobs by Master control sheet.

Tracking the Man-hours used for individual jobs against its PO amount in Microsoft Excel EMPLOYMENT DETAILS:

Name of Company : RKM POWER GEN PVT LIMITED, India Duration : December 2011 to Aug 2013

Position/s Held : Project Engineer

Dec 2011 to Jun 2013 : 4 360 MW Thermal Power Station Plant at Chhattisgarh ROLES & RESPONSIBILITIES:

Conducting inspection calls to Third Party (TATA, SGS) for equipments/structures and analyzing all running bills in coordination with Accounts Department for timely release of contractors’ payments

Inspecting all invoices submitted by the contractors to make timely payments

Preparing Work Orders & Amendments for Site Fabrication, Painting and Erection

Conducting inspection of fabricated & painted steel structures; distinction of conducting inspection up to 2000 MT

4

Facilitating coordination with office for arranging materials such as Steel & Paint as well as acquiring clarification regarding drawings and documents

Accountable for taking BOM including Foundation bolts, Embedded parts, steel structures for each and every building.

Highlights

Performed Hydro Test of Oil & Water Tanks as well as fabricating & erecting Fuel Oil System

Essayed a stellar role in erection of various equipments such as:

Oil tanks & Water tanks (up to 1000 m )

Centrifugal Pumps and Circulating Water Piping (up to 2.8m dia.)

Gas heat exchanger and Plate heat exchanger

Cranes, Hoists & Steel Structures

Foundation bolt, Embedded parts and Sheet fixing for buildings As Project Engineer - HEAD OFFICE

Responsibilities

Handling all the responsibilities of a project engineer that involves managing on-site activities, planning material and developing vendors as well as ensuring effective resource utilization to maximize output.

Reviewed designs submitted by Design Consultants and finalized basic and detailed engineering designs.

Spearheaded process of finalization of equipment specifications

Proactively evaluated bids & prepared comparative statement for evaluating BOQ, Cutting Plan & raising Indent for materials of circulating Water Piping

Prepared Letter of Intent, Technical & Commercial Agreement, amendments for equipments & fabrication works

Carried out approval of equipments GA drawing and Quality Assurance Plan.

Carried out inspection with Third Party Inspection agency Llyods, for the equipments ordered procured in India.

Organized Liaison Meetings with Vendors for the equipments ordered in India

Effectively coordinated with Logistics department for the dispatch of equipments after Third Party Inspection.

Facilitated close coordination with:

Accounts Department for timely release of payment to vendors

Logistics Department for transportation of the ordered Equipments to the site

Received Bank Guarantees and Letter of credit from vendors; reviewed that same and apprised the Accounts department for payments

Highlights

Diligently handled basic design engineering and procurement of various equipments such as: 5

Tankages (Oil, Water, Hydrogen)

Vertical Turbine Pumps (capacity 16,920 m /hr, total head 22m)

Circulating Water Piping

Oil Purifiers & Heat Exchangers

Cranes (up to 20 MT) & Hoists

Lube oil skid

EMPLOYMENT DETAILS

Name of Company : Bharat Heavy Electricals Limited, Trichy, India Duration : November 2010 to November 2011

Position/s Held : Graduate Apprentice Trainee

Nov 2010 to Nov 2011 : Bharat Heavy Electricals Limited, Trichy, India ROLES & RESPONSIBILITES:

Drafting of Fuel Oil Systems.

Drafting of Pipe Line Drawings.

Preparation of Bill of Materials.

Highly proficient in Auto CAD.

EDUCATIONAL QUALIFICATION

Achieved a Bachelor’s Degree in Mechanical Engineering with 75% from Mepco Schlenk Engineering College, belongs to Anna University in the year 2010.

Successfully completed Higher Secondary in Vocational group with 90.08% from N.S Higher Secondary School, in the year 2006.

Successfully completed Secondary School Leaving Certificate with 81.6% in N.S. Higher Secondary School, in the year 2004.

PERSONAL INFORMATION:

Date of Birth :14-12-1988

Sex :Male

Nationality :Indian

Passport No :U2262296

Expiry Date : 03-12-2029

Father Name :Surendran.P

Languages Known : English, Tamil & Hindi.

Declaration:

I hereby declare that the details mentioned above are true to the best of my knowledge. Place: Theni

Date: 15-03-2021 P.S.Manikumar

MANIKUMAR



Contact this candidate